An efficient algorithm for real-time network reconfiguration in large scale unbalanced distribution systems 大规模不平衡配电网实时重构的一种有效算法
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515285
Jin-Cheng Wang, H. Chiang, G. Darling
Real-time applications demand fast computation, and this paper proposes an efficient algorithm for real-time network reconfiguration on large unbalanced distribution networks. A novel formulation of the network reconfiguration to achieve loss minimization and load balancing is given. To reduce computational requirements for the solution algorithm, well justified power flow and loss reduction formulae in terms of the on/off status of network switches are proposed for efficient system updating. The algorithm relies only on a few full power flow studies based on system states attained by explicit expressions using backward-forward sweeps for efficient computation of power system states at the critical system operating points. The solution algorithm runs in an amount of time linearly proportional to the number of tie switches and the number of sectionalizing switches in the system. The solution algorithm has been implemented into a software package and tested on unbalanced distribution systems including a system with 292 buses, 76 laterals, 7 transformers, 45 switches and 255 line sections under diverse system conditions.
实时应用要求计算速度快,本文提出了一种用于大型不平衡配电网实时重构的高效算法。提出了一种新的网络重构方法,以实现损失最小化和负载均衡。为了减少求解算法的计算量,提出了基于网络交换机开/关状态的合理潮流和损耗降低公式,以实现有效的系统更新。该算法仅依赖于少量的全潮流研究,这些研究是基于系统状态的显式表达式,采用前向扫描的方法来有效地计算关键运行点的电力系统状态。求解算法的运行时间与系统中捆扎开关的数量和分段开关的数量成线性关系。求解算法已实现到一个软件包中,并在不同系统条件下的不平衡配电系统上进行了测试,该系统包括292条母线、76条支线、7台变压器、45个开关和255个线段。
{"title":"An efficient algorithm for real-time network reconfiguration in large scale unbalanced distribution systems","authors":"Jin-Cheng Wang, H. Chiang, G. Darling","doi":"10.1109/PICA.1995.515285","DOIUrl":"https://doi.org/10.1109/PICA.1995.515285","url":null,"abstract":"Real-time applications demand fast computation, and this paper proposes an efficient algorithm for real-time network reconfiguration on large unbalanced distribution networks. A novel formulation of the network reconfiguration to achieve loss minimization and load balancing is given. To reduce computational requirements for the solution algorithm, well justified power flow and loss reduction formulae in terms of the on/off status of network switches are proposed for efficient system updating. The algorithm relies only on a few full power flow studies based on system states attained by explicit expressions using backward-forward sweeps for efficient computation of power system states at the critical system operating points. The solution algorithm runs in an amount of time linearly proportional to the number of tie switches and the number of sectionalizing switches in the system. The solution algorithm has been implemented into a software package and tested on unbalanced distribution systems including a system with 292 buses, 76 laterals, 7 transformers, 45 switches and 255 line sections under diverse system conditions.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"123 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134609664","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 121
Real-time hydro coordination and economic hydro optimization 实时水电协调与经济水电优化
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515178
A. T. Dasigenis, A.R. Garcia-San Pedro
This paper addresses the real-time aspects of the hydro-thermal coordination problem. It describes the real-time modeling and monitoring of hydro resources, and the use of the resulting real-time hydraulic data in the online economic dispatch algorithm. A variable head, hydro loss model is incorporated that allows for online changes to the hydro topology. The method presented provides the operator with a current view of the available water resources, enables the validation of the real-time hydro data received from the field, and enables real-time optimization of the hydro-thermal unit commitment plan. The implementation of this approach on the Iberdrola system in Spain is described.
本文讨论了水热协调问题的实时性。介绍了水力资源的实时建模和监测,以及将得到的实时水力数据应用于在线经济调度算法。可变水头,水力损失模型被纳入,允许在线更改水力拓扑。该方法为作业者提供了可用水资源的当前视图,能够验证从现场接收的实时水力数据,并能够实时优化水热机组的使用计划。本文描述了这种方法在西班牙Iberdrola系统中的实施情况。
{"title":"Real-time hydro coordination and economic hydro optimization","authors":"A. T. Dasigenis, A.R. Garcia-San Pedro","doi":"10.1109/PICA.1995.515178","DOIUrl":"https://doi.org/10.1109/PICA.1995.515178","url":null,"abstract":"This paper addresses the real-time aspects of the hydro-thermal coordination problem. It describes the real-time modeling and monitoring of hydro resources, and the use of the resulting real-time hydraulic data in the online economic dispatch algorithm. A variable head, hydro loss model is incorporated that allows for online changes to the hydro topology. The method presented provides the operator with a current view of the available water resources, enables the validation of the real-time hydro data received from the field, and enables real-time optimization of the hydro-thermal unit commitment plan. The implementation of this approach on the Iberdrola system in Spain is described.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128246770","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
LAN based data communication in modern energy management systems (EMS) 基于局域网的现代能源管理系统(EMS)数据通信
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515276
W. Dieterle, H. Kochs, E. Dittmar
The use of energy management systems (EMS) demands high reliability, real-time behaviour and more and more economical systems. The last demand requires the use of inexpensive standard components, whenever possible. The following article discusses the realization of EMS, especially system communication, with respect to these constraints. Problems due to conventional use of standardized communication protocols in distributed supervisory systems in general and highly-reliable systems in particular are shown. Multicast communication concepts are presented as solutions, using standardized protocols in a problem specific way. The presented concepts fulfill the necessity of using standard components as wed as the specific demands towards EMS.
能源管理系统(EMS)的使用要求高可靠性、实时性和越来越经济的系统。最后一个要求要求尽可能使用便宜的标准组件。下面的文章将根据这些约束讨论EMS的实现,特别是系统通信。在分布式监控系统中,特别是在高可靠性系统中,由于传统使用标准化通信协议而产生的问题。多播通信概念作为解决方案,以特定问题的方式使用标准化协议。所提出的概念既满足了使用标准组件的必要性,也满足了对EMS的具体要求。
{"title":"LAN based data communication in modern energy management systems (EMS)","authors":"W. Dieterle, H. Kochs, E. Dittmar","doi":"10.1109/PICA.1995.515276","DOIUrl":"https://doi.org/10.1109/PICA.1995.515276","url":null,"abstract":"The use of energy management systems (EMS) demands high reliability, real-time behaviour and more and more economical systems. The last demand requires the use of inexpensive standard components, whenever possible. The following article discusses the realization of EMS, especially system communication, with respect to these constraints. Problems due to conventional use of standardized communication protocols in distributed supervisory systems in general and highly-reliable systems in particular are shown. Multicast communication concepts are presented as solutions, using standardized protocols in a problem specific way. The presented concepts fulfill the necessity of using standard components as wed as the specific demands towards EMS.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"197 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132663690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 13
Hydropower generation management under uncertainty via scenario analysis and parallel computation 基于情景分析和并行计算的不确定条件下的水力发电管理
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515290
L. Escudero, C. García, J. L. de la Fuente, F. Prieto
We present a modeling framework for the robust solution of hydroelectric power management problems with uncertainty in the values of the water inflows and outflows. A deterministic treatment of the problem provides unsatisfactory results, except for very short time horizons. We describe a model based on scenario analysis that allows a satisfactory treatment of uncertainty in the model data for medium and long-term planning problems. Our approach results in a huge model with a network submodel per scenario plus coupling constraints. The size of the problem and the structure of the constraints are adequate for the use of decomposition techniques and parallel computation tools. We present computational results for both sequential and parallel implementation versions of the codes, running on a cluster of workstations. The codes have been tested on data obtained from the reservoir network of Iberdrola, a power utility owning 50% of the total installed hydroelectric capacity of Spain, and generating 40% of the total energy demand.
我们提出了一个具有不确定性的水力发电管理问题鲁棒解决方案的建模框架。除了非常短的时间范围外,对这个问题的确定性处理提供了令人不满意的结果。我们描述了一个基于情景分析的模型,该模型允许对中长期规划问题的模型数据中的不确定性进行令人满意的处理。我们的方法产生了一个巨大的模型,每个场景都有一个网络子模型,加上耦合约束。问题的大小和约束的结构足以使用分解技术和并行计算工具。我们给出了在一组工作站上运行的代码的顺序和并行实现版本的计算结果。这些代码已经在Iberdrola水库网络获得的数据上进行了测试,Iberdrola是一家电力公用事业公司,拥有西班牙50%的水电装机容量,发电量占总能源需求的40%。
{"title":"Hydropower generation management under uncertainty via scenario analysis and parallel computation","authors":"L. Escudero, C. García, J. L. de la Fuente, F. Prieto","doi":"10.1109/PICA.1995.515290","DOIUrl":"https://doi.org/10.1109/PICA.1995.515290","url":null,"abstract":"We present a modeling framework for the robust solution of hydroelectric power management problems with uncertainty in the values of the water inflows and outflows. A deterministic treatment of the problem provides unsatisfactory results, except for very short time horizons. We describe a model based on scenario analysis that allows a satisfactory treatment of uncertainty in the model data for medium and long-term planning problems. Our approach results in a huge model with a network submodel per scenario plus coupling constraints. The size of the problem and the structure of the constraints are adequate for the use of decomposition techniques and parallel computation tools. We present computational results for both sequential and parallel implementation versions of the codes, running on a cluster of workstations. The codes have been tested on data obtained from the reservoir network of Iberdrola, a power utility owning 50% of the total installed hydroelectric capacity of Spain, and generating 40% of the total energy demand.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114200225","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 69
Scheduling units with multiple operating modes in unit commitment 在机组承诺中调度具有多种运行模式的机组
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515283
A. Cohen, G. Ostrowski
The operating flexibility of certain types of generating units can be exploited to reduce the production cost of their power system. These units have different operating modes where the operating parameters can differ greatly depending which mode is operating at the time. Examples of such units are: combined cycle; fuel switching/blending; constant/variable pressure; overfire; and dual boiler. A general modeling approach is described which can be used to model units with multiple operating modes. It is shown how Lagrangian relaxation can be used to schedule these units. Examples are given showing the benefit of using these methods to schedule an electric utility's power system.
可以利用某些类型发电机组的运行灵活性来降低其电力系统的生产成本。这些单元具有不同的操作模式,其中操作参数可能会有很大差异,这取决于哪种模式在操作的时间。这些单位的例子有:联合循环;燃料切换/混合;常数/变压;烧毁;双锅炉。描述了一种通用的建模方法,该方法可用于对具有多种工作模式的单元进行建模。它显示了拉格朗日松弛如何可以用来调度这些单位。举例说明了使用这些方法对电力公司的电力系统进行调度的好处。
{"title":"Scheduling units with multiple operating modes in unit commitment","authors":"A. Cohen, G. Ostrowski","doi":"10.1109/PICA.1995.515283","DOIUrl":"https://doi.org/10.1109/PICA.1995.515283","url":null,"abstract":"The operating flexibility of certain types of generating units can be exploited to reduce the production cost of their power system. These units have different operating modes where the operating parameters can differ greatly depending which mode is operating at the time. Examples of such units are: combined cycle; fuel switching/blending; constant/variable pressure; overfire; and dual boiler. A general modeling approach is described which can be used to model units with multiple operating modes. It is shown how Lagrangian relaxation can be used to schedule these units. Examples are given showing the benefit of using these methods to schedule an electric utility's power system.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122589492","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 25
Animated vectors for visualization of power system phenomena 用于可视化电力系统现象的动画向量
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515174
J. Gronquist, W. Sethares, F. Alvarado, R. Lasseter
This paper presents an exact mechanical analog for an electric power system that proves to be a powerful visualization tool for studying power systems issues such as load flow, transient stability, and the effects of FACTS devices. Techniques based on color and highlighting that make the method applicable to the visualization of large systems are introduced. The analog provides a means for demonstrating complex issues to audiences with little or no background in power systems. For the power engineer, the analog provides unique insights into the hows and whys of power system behavior. To the control center operator, an accurate model of the dynamic modes may bring about improved understanding of system behavior after contingencies and illustrate the relative merits of various dispatch options.
本文给出了一个电力系统的精确力学模拟,为研究电力系统的负荷潮流、暂态稳定和FACTS设备的影响等问题提供了一个强大的可视化工具。介绍了基于颜色和突出显示的技术,使该方法适用于大型系统的可视化。模拟提供了一种向很少或没有电力系统背景的观众展示复杂问题的手段。对于电力工程师来说,模拟提供了对电力系统行为的方式和原因的独特见解。对于控制中心操作员来说,准确的动态模式模型可以提高对突发事件后系统行为的理解,并说明各种调度方案的相对优点。
{"title":"Animated vectors for visualization of power system phenomena","authors":"J. Gronquist, W. Sethares, F. Alvarado, R. Lasseter","doi":"10.1109/PICA.1995.515174","DOIUrl":"https://doi.org/10.1109/PICA.1995.515174","url":null,"abstract":"This paper presents an exact mechanical analog for an electric power system that proves to be a powerful visualization tool for studying power systems issues such as load flow, transient stability, and the effects of FACTS devices. Techniques based on color and highlighting that make the method applicable to the visualization of large systems are introduced. The analog provides a means for demonstrating complex issues to audiences with little or no background in power systems. For the power engineer, the analog provides unique insights into the hows and whys of power system behavior. To the control center operator, an accurate model of the dynamic modes may bring about improved understanding of system behavior after contingencies and illustrate the relative merits of various dispatch options.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122205104","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 13
A statistical approach to the calculation of harmonics in MV systems caused by dispersed LV customers 用统计方法计算分散低压用户引起的中压系统谐波
Pub Date : 1995-05-07 DOI: 10.1109/PICA.1995.515187
T. Goeke, W. Wellssow
Problems usually arise when predicting harmonics in public supply systems due to the varying characteristics of the loads connected. Based on comprehensive measurements, a statistical load model is set up providing the harmonic parameters of all LV systems fed by the same HV/MV feeder. Harmonic distortion in the MV system caused by the variety of stochastic LV customers is determined by a Monte Carlo simulation approach applying the load model.
在预测公共供电系统的谐波时,由于所连接的负载的特性不同,通常会出现问题。在综合测量的基础上,建立了提供同一高压/中压馈线供电的各低压系统谐波参数的负荷统计模型。采用蒙特卡罗仿真方法,应用负载模型确定了随机低压用户变化引起的中压系统谐波失真。
{"title":"A statistical approach to the calculation of harmonics in MV systems caused by dispersed LV customers","authors":"T. Goeke, W. Wellssow","doi":"10.1109/PICA.1995.515187","DOIUrl":"https://doi.org/10.1109/PICA.1995.515187","url":null,"abstract":"Problems usually arise when predicting harmonics in public supply systems due to the varying characteristics of the loads connected. Based on comprehensive measurements, a statistical load model is set up providing the harmonic parameters of all LV systems fed by the same HV/MV feeder. Harmonic distortion in the MV system caused by the variety of stochastic LV customers is determined by a Monte Carlo simulation approach applying the load model.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123332353","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Generation/transmission power system reliability evaluation by Monte Carlo simulation assuming a fuzzy load description 基于模糊负荷描述的发电/输电系统可靠性蒙特卡罗仿真
Pub Date : 1900-01-01 DOI: 10.1109/PICA.1995.515291
J. Saraiva, Vladimiro Miranda, L. Pinto
This paper presents a Monte Carlo algorithm considering loads defined by fuzzy numbers. In this methodology states are sampled according to the probabilistic models governing the life cycle of system components while fuzzy concepts are used to model uncertainty related to future load behavior. This model can be used to evaluate generation/transmission power system reliability for long term planning studies as one uses the more adequate uncertainty models for each type of data. For each sampled state a fuzzy optimal power flow is run so that one builds its power not supplied membership function. The paper proposes new indices reflecting the integration of probabilistic models and fuzzy concepts and discusses the application of variance reduction techniques if loads are defined by fuzzy numbers. A case-study based on the IEEE 30 bus system illustrates this methodology.
本文提出了一种考虑由模糊数定义的负荷的蒙特卡罗算法。在这种方法中,根据控制系统组件生命周期的概率模型对状态进行采样,而模糊概念用于模拟与未来负载行为相关的不确定性。该模型可用于评估发电/输电系统的可靠性,用于长期规划研究,因为人们对每种类型的数据使用了更充分的不确定性模型。对每个采样状态运行一个模糊最优潮流,从而建立其不供电隶属函数。本文提出了反映概率模型和模糊概念集成的新指标,并讨论了用模糊数定义负荷时方差缩减技术的应用。一个基于IEEE 30总线系统的案例研究说明了这种方法。
{"title":"Generation/transmission power system reliability evaluation by Monte Carlo simulation assuming a fuzzy load description","authors":"J. Saraiva, Vladimiro Miranda, L. Pinto","doi":"10.1109/PICA.1995.515291","DOIUrl":"https://doi.org/10.1109/PICA.1995.515291","url":null,"abstract":"This paper presents a Monte Carlo algorithm considering loads defined by fuzzy numbers. In this methodology states are sampled according to the probabilistic models governing the life cycle of system components while fuzzy concepts are used to model uncertainty related to future load behavior. This model can be used to evaluate generation/transmission power system reliability for long term planning studies as one uses the more adequate uncertainty models for each type of data. For each sampled state a fuzzy optimal power flow is run so that one builds its power not supplied membership function. The paper proposes new indices reflecting the integration of probabilistic models and fuzzy concepts and discusses the application of variance reduction techniques if loads are defined by fuzzy numbers. A case-study based on the IEEE 30 bus system illustrates this methodology.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"95 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121598917","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Fourier and Walsh digital filtering algorithms for distance protection 距离保护的傅里叶和沃尔什数字滤波算法
Pub Date : 1900-01-01 DOI: 10.1109/PICA.1995.515273
H.J. Altuve F., I. Diaz V., E. Vázquez M
Filtering requirements for power system distance relays are very critical, because they must estimate precisely and quickly the electrical distance to the fault, even with highly distorted input signals. A number of digital filtering algorithms for distance relays have been proposed and some of them are in use in practical relays; however, power system evolution increases the corruption level of signals and imposes the necessity of continuing the research efforts in this area. In the present paper, a comparative evaluation of different digital filtering algorithms for distance protection is performed. An evaluation method is proposed, which gives comprehensive information about filter transient behavior over a wide frequency range of noise. The discussion is focused in well-known algorithms based on Fourier and Walsh transforms, and includes a recently proposed combined sine-cosine filter.
电力系统距离继电器的滤波要求是非常关键的,因为它们必须准确而快速地估计到故障的电气距离,即使输入信号高度失真。已经提出了许多用于距离继电器的数字滤波算法,其中一些算法已在实际继电器中得到应用;然而,电力系统的演变增加了信号的腐败程度,并提出了继续在这一领域的研究工作的必要性。本文对不同的距离保护数字滤波算法进行了比较评价。提出了一种评价滤波器瞬态特性的方法,该方法能在较宽的噪声频率范围内给出滤波器瞬态特性的综合信息。讨论集中在基于傅里叶变换和沃尔什变换的知名算法上,并包括最近提出的组合正弦-余弦滤波器。
{"title":"Fourier and Walsh digital filtering algorithms for distance protection","authors":"H.J. Altuve F., I. Diaz V., E. Vázquez M","doi":"10.1109/PICA.1995.515273","DOIUrl":"https://doi.org/10.1109/PICA.1995.515273","url":null,"abstract":"Filtering requirements for power system distance relays are very critical, because they must estimate precisely and quickly the electrical distance to the fault, even with highly distorted input signals. A number of digital filtering algorithms for distance relays have been proposed and some of them are in use in practical relays; however, power system evolution increases the corruption level of signals and imposes the necessity of continuing the research efforts in this area. In the present paper, a comparative evaluation of different digital filtering algorithms for distance protection is performed. An evaluation method is proposed, which gives comprehensive information about filter transient behavior over a wide frequency range of noise. The discussion is focused in well-known algorithms based on Fourier and Walsh transforms, and includes a recently proposed combined sine-cosine filter.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128756868","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Proceedings of Power Industry Computer Applications Conference
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1