Pub Date : 2019-01-01DOI: 10.5267/J.JPM.2018.8.001
V. Chawla, A. Chanda, Surjit Angra
Article history: Received: June 1
文章历史:收稿日期:6月1日
{"title":"The scheduling of automatic guided vehicles for the workload balancing and travel time minimi-zation in the flexible manufacturing system by the nature-inspired algorithm","authors":"V. Chawla, A. Chanda, Surjit Angra","doi":"10.5267/J.JPM.2018.8.001","DOIUrl":"https://doi.org/10.5267/J.JPM.2018.8.001","url":null,"abstract":"Article history: Received: June 1","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2018.8.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70779916","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2019-01-01DOI: 10.5267/J.JPM.2018.8.002
Ali RezaHoseini, S. Noori, S. F. Ghannadpour, Mostafa Bodaghi
Article history: Received: June 1
文章历史:收稿日期:6月1日
{"title":"Investigating the effects of building information modeling capabilities on knowledge management areas in the construction industry","authors":"Ali RezaHoseini, S. Noori, S. F. Ghannadpour, Mostafa Bodaghi","doi":"10.5267/J.JPM.2018.8.002","DOIUrl":"https://doi.org/10.5267/J.JPM.2018.8.002","url":null,"abstract":"Article history: Received: June 1","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2018.8.002","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70779933","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2019-01-01DOI: 10.5267/j.jpm.2018.11.001
Ehsan Haqiqat, Y. Z. Mehrjerdi, A. Bidaki
Article history: Received: July 2
文章历史:收稿日期:7月2日
{"title":"Fuzzy inference system-Latin hypercube simulation: An integrated hybrid model for OHS risks management","authors":"Ehsan Haqiqat, Y. Z. Mehrjerdi, A. Bidaki","doi":"10.5267/j.jpm.2018.11.001","DOIUrl":"https://doi.org/10.5267/j.jpm.2018.11.001","url":null,"abstract":"Article history: Received: July 2","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2018.11.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780116","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2019-01-01DOI: 10.5267/J.JPM.2019.1.005
Mohamed Ibrahim Khalifa Halou, R. Samin, Mushtaq Aḥmad
Article history: Received: October 2 2018 Received in revised format: November 19 2018 Accepted: January 12 2019 Available online: January 14 2019 Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk management was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.
{"title":"Impacts of change management on risk and cost management of a construction projects","authors":"Mohamed Ibrahim Khalifa Halou, R. Samin, Mushtaq Aḥmad","doi":"10.5267/J.JPM.2019.1.005","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.1.005","url":null,"abstract":"Article history: Received: October 2 2018 Received in revised format: November 19 2018 Accepted: January 12 2019 Available online: January 14 2019 Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk management was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.005","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780805","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2019-01-01DOI: 10.5267/j.jpm.2019.6.001
T. Kiran, A. Reddy
{"title":"Critical success factors of ERP implementation in SMEs","authors":"T. Kiran, A. Reddy","doi":"10.5267/j.jpm.2019.6.001","DOIUrl":"https://doi.org/10.5267/j.jpm.2019.6.001","url":null,"abstract":"","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.6.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780412","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2019-01-01DOI: 10.5267/J.JPM.2019.3.002
Alireza Sotoudeh-Anvari
The numerous studies on comparing and ranking fuzzy numbers clear that this task is still young. However, the observation that many papers do not hesitate to use some incorrect ranking methods in risk analysis problems, encouraged the author to point out the shortcoming of some of these methods. In this note, we review briefly the methods for ranking fuzzy
文章历史:收稿日期:11月3日
{"title":"A short note on methods of ranking fuzzy numbers in risk analysis problems","authors":"Alireza Sotoudeh-Anvari","doi":"10.5267/J.JPM.2019.3.002","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.3.002","url":null,"abstract":"The numerous studies on comparing and ranking fuzzy numbers clear that this task is still young. However, the observation that many papers do not hesitate to use some incorrect ranking methods in risk analysis problems, encouraged the author to point out the shortcoming of some of these methods. In this note, we review briefly the methods for ranking fuzzy","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.3.002","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780433","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}