首页 > 最新文献

Journal of Engineering Design and Technology最新文献

英文 中文
An inquiry into the health and safety management practices of construction firms in South Korea 韩国建筑企业健康与安全管理实践调查
IF 2.8 Q2 Engineering Pub Date : 2023-07-11 DOI: 10.1108/jedt-02-2023-0050
T. Park, Abdul–Majeed Mahamadu, K. Agyekum, Anita Odame Adade-Boateng, P. Manu, E. Adinyira, Selorm Adukpo
PurposeThis paper aims to investigate the Occupational Safety and Health (OSH) management practices of construction companies in South Korea to ascertain specific components and practices that need improvement for successful OSH performance.Design/methodology/approachA quantitative research strategy was adopted. A close-ended questionnaire survey covering 45 OSH management practices was sent to 324 contractors; 108 responses were gathered, representing a response rate of 33.3%. Data were analysed using simple descriptive statistics (frequencies and percentages) and Pearson’s chi-square test.FindingsThe findings revealed that there is a moderate level of implementation of OSH management practices among construction firms in South Korea. However, there is a significant disparity in terms of implementation between large enterprises on the one hand and small to medium enterprises on the other. Furthermore, a few of the business characteristics (i.e. the size of companies and certification to OHSAS 18001) were closely associated with the extent of the implementation of OSH management practices.Practical implicationsThis research uncovers the OSH management practices that are poorly implemented and lays the foundation for appropriate measures to improve OSH in South Korean construction companies. It suggests an effective strategy for communicating health and safety issues to workers, training safety managers, reviewing risk assessments, reviewing the health and safety plan, incentivising workers by rewarding good behaviour and having a penal mechanism for employees not adhering to the rules.Originality/valueThe study provides insights into an under-investigated South Korean construction industry topic. It offers additional insight into state-of-the-art health and safety management practices in the construction industry in South Korea. Furthermore, it establishes which components of OSH management practice require improvement in the Korean context. This is also one of the few studies in OSH which establishes the association between the construction business characteristics and OSH management in the South Korean construction domain.
目的本文旨在调查韩国建筑公司的职业安全与健康(OSH)管理实践,以确定需要改进的具体组成部分和实践,从而成功地实现OSH绩效。设计/方法/方法采用定量研究策略。向324名承包商发送了一份涵盖45种职业安全和健康管理做法的封闭式问卷调查;收集了108份回复,回复率为33.3%。使用简单描述性统计(频率和百分比)和皮尔逊卡方检验对数据进行分析。调查结果显示,韩国建筑公司对OSH管理实践的实施程度适中。然而,大企业和中小型企业在执行方面存在显著差距。此外,一些业务特征(即公司规模和OHSAS18001认证)与职业安全与健康管理实践的实施程度密切相关。实践启示本研究揭示了韩国建筑公司实施不力的OSH管理实践,为采取适当措施改善OSH奠定了基础。它提出了一种有效的策略,用于向工人传达健康和安全问题,培训安全经理,审查风险评估,审查健康和安全计划,通过奖励良好行为来激励工人,并对不遵守规则的员工建立惩罚机制。原创性/价值该研究为一个调查不足的韩国建筑业主题提供了见解。它进一步深入了解了韩国建筑业最先进的健康和安全管理实践。此外,它确定了在韩国背景下,OSH管理实践的哪些组成部分需要改进。这也是为数不多的关于OSH的研究之一,该研究建立了韩国建筑领域建筑业务特征与OSH管理之间的联系。
{"title":"An inquiry into the health and safety management practices of construction firms in South Korea","authors":"T. Park, Abdul–Majeed Mahamadu, K. Agyekum, Anita Odame Adade-Boateng, P. Manu, E. Adinyira, Selorm Adukpo","doi":"10.1108/jedt-02-2023-0050","DOIUrl":"https://doi.org/10.1108/jedt-02-2023-0050","url":null,"abstract":"\u0000Purpose\u0000This paper aims to investigate the Occupational Safety and Health (OSH) management practices of construction companies in South Korea to ascertain specific components and practices that need improvement for successful OSH performance.\u0000\u0000\u0000Design/methodology/approach\u0000A quantitative research strategy was adopted. A close-ended questionnaire survey covering 45 OSH management practices was sent to 324 contractors; 108 responses were gathered, representing a response rate of 33.3%. Data were analysed using simple descriptive statistics (frequencies and percentages) and Pearson’s chi-square test.\u0000\u0000\u0000Findings\u0000The findings revealed that there is a moderate level of implementation of OSH management practices among construction firms in South Korea. However, there is a significant disparity in terms of implementation between large enterprises on the one hand and small to medium enterprises on the other. Furthermore, a few of the business characteristics (i.e. the size of companies and certification to OHSAS 18001) were closely associated with the extent of the implementation of OSH management practices.\u0000\u0000\u0000Practical implications\u0000This research uncovers the OSH management practices that are poorly implemented and lays the foundation for appropriate measures to improve OSH in South Korean construction companies. It suggests an effective strategy for communicating health and safety issues to workers, training safety managers, reviewing risk assessments, reviewing the health and safety plan, incentivising workers by rewarding good behaviour and having a penal mechanism for employees not adhering to the rules.\u0000\u0000\u0000Originality/value\u0000The study provides insights into an under-investigated South Korean construction industry topic. It offers additional insight into state-of-the-art health and safety management practices in the construction industry in South Korea. Furthermore, it establishes which components of OSH management practice require improvement in the Korean context. This is also one of the few studies in OSH which establishes the association between the construction business characteristics and OSH management in the South Korean construction domain.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43559137","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: evidence from Zambia 发展中国家私营部门参与公私合作项目的挑战、驱动因素和激励措施:来自赞比亚的证据
IF 2.8 Q2 Engineering Pub Date : 2023-07-11 DOI: 10.1108/jedt-03-2023-0092
E. Zulu, Josephine Mutwale, S. Zulu, I. Musonda, N. Kavishe, C. Moobela
PurposeGovernments in developing countries seeking to meet their infrastructure backlog are increasingly turning to public–private partnerships (PPP) due to a lack of public funds. However, while there are factors which drive the current uptake of projects, there are challenges with attracting private finance, and it is not clear what incentives can be used to attract more private participation, especially in sub-Saharan Africa (SSA). Therefore, this study aims to examine challenges, drivers and incentives that affect private participation in PPP projects in Zambia.Design/methodology/approachThe study used a qualitative approach with semi-structured interviews with participants who had first-hand experience working on the administration of PPP projects. The participants were predominantly from the public sector, and so the results are largely a public sector perspective on the matter.FindingsThe findings show that bureaucracy and a poor business environment emanating from poor policies, long procedures and a poor economic environment are the main challenges affecting PPP projects. The current demand for the projects is being driven by a stable business and economic environment while incentives include enhancing the business environment by improving procedures and policies.Originality/valueThe study contributes to extant literature by proposing an overarching theory about the challenges affecting the implementation of PPP projects in Zambia, in particular, and in SSA, in general. The results show areas where governments and government agencies responsible for PPP projects can focus attention to promote private participation.
由于缺乏公共资金,发展中国家的政府正在寻求解决其基础设施积压问题,越来越多地转向公私合作伙伴关系(PPP)。然而,虽然目前有一些因素推动项目的吸收,但在吸引私人资金方面存在挑战,而且目前尚不清楚可以采用何种激励措施来吸引更多私人参与,特别是在撒哈拉以南非洲(SSA)。因此,本研究旨在考察影响赞比亚私营部门参与PPP项目的挑战、驱动因素和激励因素。设计/方法/方法本研究采用定性方法,对具有PPP项目管理第一手经验的参与者进行了半结构化访谈。参与者主要来自公共部门,因此结果在很大程度上是公共部门对此事的看法。调查结果表明,官僚主义和糟糕的商业环境源于糟糕的政策,冗长的程序和糟糕的经济环境是影响PPP项目的主要挑战。目前对项目的需求是由稳定的商业和经济环境驱动的,而激励措施包括通过改善程序和政策来改善商业环境。原创性/价值本研究通过提出影响PPP项目在赞比亚实施的挑战的总体理论,对现有文献做出了贡献,特别是在SSA,总的来说。研究结果表明,负责PPP项目的政府和政府机构可以重点关注促进私人参与的领域。
{"title":"Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: evidence from Zambia","authors":"E. Zulu, Josephine Mutwale, S. Zulu, I. Musonda, N. Kavishe, C. Moobela","doi":"10.1108/jedt-03-2023-0092","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0092","url":null,"abstract":"\u0000Purpose\u0000Governments in developing countries seeking to meet their infrastructure backlog are increasingly turning to public–private partnerships (PPP) due to a lack of public funds. However, while there are factors which drive the current uptake of projects, there are challenges with attracting private finance, and it is not clear what incentives can be used to attract more private participation, especially in sub-Saharan Africa (SSA). Therefore, this study aims to examine challenges, drivers and incentives that affect private participation in PPP projects in Zambia.\u0000\u0000\u0000Design/methodology/approach\u0000The study used a qualitative approach with semi-structured interviews with participants who had first-hand experience working on the administration of PPP projects. The participants were predominantly from the public sector, and so the results are largely a public sector perspective on the matter.\u0000\u0000\u0000Findings\u0000The findings show that bureaucracy and a poor business environment emanating from poor policies, long procedures and a poor economic environment are the main challenges affecting PPP projects. The current demand for the projects is being driven by a stable business and economic environment while incentives include enhancing the business environment by improving procedures and policies.\u0000\u0000\u0000Originality/value\u0000The study contributes to extant literature by proposing an overarching theory about the challenges affecting the implementation of PPP projects in Zambia, in particular, and in SSA, in general. The results show areas where governments and government agencies responsible for PPP projects can focus attention to promote private participation.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45354355","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Designing multivariable PI controller with multi-response optimization for a pilot plant binary distillation column: a robust design approach 中试装置二元蒸馏塔多响应优化多变量PI控制器的鲁棒设计方法
IF 2.8 Q2 Engineering Pub Date : 2023-07-07 DOI: 10.1108/jedt-12-2022-0616
Vinayambika S. Bhat, Thirunavukkarasu Indiran, S. Selvanathan, S. Bhat
Purpose The purpose of this paper is to propose and validate a robust industrial control system. The aim is to design a Multivariable Proportional Integral controller that accommodates multiple responses while considering the process's control and noise parameters. In addition, this paper intended to develop a multidisciplinary approach by combining computational science, control engineering and statistical methodologies to ensure a resilient process with the best use of available resources. Design/methodology/approach Taguchi's robust design methodology and multi-response optimisation approaches are adopted to meet the research aims. Two-Input-Two-Output transfer function model of the distillation column system is investigated. In designing the control system, the Steady State Gain Matrix and process factors such as time constant (t) and time delay (?) are also used. The unique methodology is implemented and validated using the pilot plant's distillation column. To determine the robustness of the proposed control system, a simulation study, statistical analysis and real-time experimentation are conducted. In addition, the outcomes are compared to different control algorithms. Findings Research indicates that integral control parameters (Ki) affect outputs substantially more than proportional control parameters (Kp). The results of this paper show that control and noise parameters must be considered to make the control system robust. In addition, Taguchi's approach, in conjunction with multi-response optimisation, ensures robust controller design with optimal use of resources. Eventually, this research shows that the best outcomes for all the performance indices are achieved when Kp11 = 1.6859, Kp12 = −2.061, Kp21 = 3.1846, Kp22 = −1.2176, Ki11 = 1.0628, Ki12 = −1.2989, Ki21 = 2.454 and Ki22 = −0.7676. Originality/value This paper provides a step-by-step strategy for designing and validating a multi-response control system that accommodates controllable and uncontrollable parameters (noise parameters). The methodology can be used in any industrial Multi-Input-Multi-Output system to ensure process robustness. In addition, this paper proposes a multidisciplinary approach to industrial controller design that academics and industry can refine and improve.
目的本文的目的是提出并验证一个鲁棒工业控制系统。其目的是设计一种多变量比例积分控制器,该控制器在考虑过程控制和噪声参数的同时,可容纳多个响应。此外,本文旨在通过结合计算科学、控制工程和统计方法,开发一种多学科方法,以确保在最佳利用可用资源的情况下实现弹性过程。设计/方法论/方法采用田口稳健的设计方法论和多响应优化方法来满足研究目标。研究了精馏塔系统的二输入二输出传递函数模型。在设计控制系统时,还使用了稳态增益矩阵和过程因素,如时间常数(t)和时间延迟(?)。使用中试装置的蒸馏塔实施并验证了这种独特的方法。为了确定所提出的控制系统的鲁棒性,进行了仿真研究、统计分析和实时实验。此外,还将结果与不同的控制算法进行了比较。FindingsResearch表明,积分控制参数(Ki)对输出的影响远远大于比例控制参数(Kp)。本文的结果表明,为了使控制系统具有鲁棒性,必须考虑控制和噪声参数。此外,田口的方法,结合多响应优化,确保了稳健的控制器设计与资源的最佳利用。最终,本研究表明,当Kp11=1.6859,Kp12=−2.061,Kp21=3.1846,Kp22=−1.2176,Ki11=1.0628,Ki12=−1.2989时,所有性能指标都达到了最佳结果,Ki21=2.454和Ki22=−0.7676.起源/价值本文提供了一种逐步设计和验证多响应控制系统的策略,该系统可容纳可控和不可控参数(噪声参数)。该方法可用于任何工业多输入多输出系统,以确保过程的稳健性。此外,本文提出了一种多学科的工业控制器设计方法,学术界和工业界可以对其进行改进。
{"title":"Designing multivariable PI controller with multi-response optimization for a pilot plant binary distillation column: a robust design approach","authors":"Vinayambika S. Bhat, Thirunavukkarasu Indiran, S. Selvanathan, S. Bhat","doi":"10.1108/jedt-12-2022-0616","DOIUrl":"https://doi.org/10.1108/jedt-12-2022-0616","url":null,"abstract":"Purpose The purpose of this paper is to propose and validate a robust industrial control system. The aim is to design a Multivariable Proportional Integral controller that accommodates multiple responses while considering the process's control and noise parameters. In addition, this paper intended to develop a multidisciplinary approach by combining computational science, control engineering and statistical methodologies to ensure a resilient process with the best use of available resources. Design/methodology/approach Taguchi's robust design methodology and multi-response optimisation approaches are adopted to meet the research aims. Two-Input-Two-Output transfer function model of the distillation column system is investigated. In designing the control system, the Steady State Gain Matrix and process factors such as time constant (t) and time delay (?) are also used. The unique methodology is implemented and validated using the pilot plant's distillation column. To determine the robustness of the proposed control system, a simulation study, statistical analysis and real-time experimentation are conducted. In addition, the outcomes are compared to different control algorithms. Findings Research indicates that integral control parameters (Ki) affect outputs substantially more than proportional control parameters (Kp). The results of this paper show that control and noise parameters must be considered to make the control system robust. In addition, Taguchi's approach, in conjunction with multi-response optimisation, ensures robust controller design with optimal use of resources. Eventually, this research shows that the best outcomes for all the performance indices are achieved when Kp11 = 1.6859, Kp12 = −2.061, Kp21 = 3.1846, Kp22 = −1.2176, Ki11 = 1.0628, Ki12 = −1.2989, Ki21 = 2.454 and Ki22 = −0.7676. Originality/value This paper provides a step-by-step strategy for designing and validating a multi-response control system that accommodates controllable and uncontrollable parameters (noise parameters). The methodology can be used in any industrial Multi-Input-Multi-Output system to ensure process robustness. In addition, this paper proposes a multidisciplinary approach to industrial controller design that academics and industry can refine and improve.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45469146","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Design for mixed model final assembly line (DfMMFAL): a new tool for assembly interface identification based on assembly process planning 混合模型总装线设计:一种基于装配工艺规划的装配界面识别新工具
IF 2.8 Q2 Engineering Pub Date : 2023-07-03 DOI: 10.1108/jedt-11-2022-0582
M. B. Edouard, Jean-Claude Camille, Bernier Vincent, Aoussat Améziane
PurposeThis paper aims to fulfil a need to identify assembly interfaces from existing products based on their Assembly Process Planning (APP). It proposes a tool to identify assembly interfaces responsible for reused components integration. It is integrated into a design for mixed model final assembly line approach by focusing on the identification of assembly interfaces as a generic tool. It aims to answer the problem of interfaces’ identification from the APP.Design/methodology/approachA tool is developed to identify assembly interfaces responsible for reused component integration. It is based on the use of a rule-based algorithm that analyses an APP and then submits the results to prohibition lists to check their relevance. The tool is then tested using a case study. Finally, the resulting list is subjected to a visual validation step to validate whether the identified interface is a real interface.FindingsThe results of this study are a tool named ICARRE which identify assembly interfaces using three steps. The tool has been validated by a case study from the helicopter industry.Research limitations/implicationsAs some interfaces are not contained in the same assembly operations and therefore, may not have been identified by the rule-based algorithm. More research should be done by testing and improving the algorithm with other case studies.Practical implicationsThe paper includes implications for new product development teams to address the difficulties of integrating reused components into different products.Originality/valueThis paper presents a tool for identifying interfaces when sources of knowledge do not allow the use of current methods.
目的本文旨在满足根据现有产品的装配工艺规划(APP)从现有产品中识别装配接口的需求。它提出了一种工具来识别负责重用组件集成的组装接口。通过将装配接口识别作为通用工具,将其集成到混合模型总装线方法的设计中。它旨在从应用程序中回答接口的识别问题。设计/方法/方法开发了一个工具来识别负责重用组件集成的组件接口。它是基于使用基于规则的算法来分析应用程序,然后将结果提交给禁止列表以检查其相关性。然后使用案例研究对该工具进行测试。最后,对得到的列表进行视觉验证步骤,以验证所识别的接口是否是真实的接口。发现这项研究的结果是一个名为ICARRE的工具,它使用三个步骤来识别组装接口。该工具已通过直升机行业的案例研究得到验证。研究局限性/含义由于某些接口不包含在相同的汇编操作中,因此可能未被基于规则的算法识别。应该通过与其他案例研究一起测试和改进算法来进行更多的研究。实际含义本文包括对新产品开发团队解决将可重用组件集成到不同产品中的困难的含义。独创性/价值本文提供了一种工具,用于在知识来源不允许使用当前方法时识别接口。
{"title":"Design for mixed model final assembly line (DfMMFAL): a new tool for assembly interface identification based on assembly process planning","authors":"M. B. Edouard, Jean-Claude Camille, Bernier Vincent, Aoussat Améziane","doi":"10.1108/jedt-11-2022-0582","DOIUrl":"https://doi.org/10.1108/jedt-11-2022-0582","url":null,"abstract":"Purpose\u0000This paper aims to fulfil a need to identify assembly interfaces from existing products based on their Assembly Process Planning (APP). It proposes a tool to identify assembly interfaces responsible for reused components integration. It is integrated into a design for mixed model final assembly line approach by focusing on the identification of assembly interfaces as a generic tool. It aims to answer the problem of interfaces’ identification from the APP.\u0000\u0000\u0000Design/methodology/approach\u0000A tool is developed to identify assembly interfaces responsible for reused component integration. It is based on the use of a rule-based algorithm that analyses an APP and then submits the results to prohibition lists to check their relevance. The tool is then tested using a case study. Finally, the resulting list is subjected to a visual validation step to validate whether the identified interface is a real interface.\u0000\u0000\u0000Findings\u0000The results of this study are a tool named ICARRE which identify assembly interfaces using three steps. The tool has been validated by a case study from the helicopter industry.\u0000\u0000\u0000Research limitations/implications\u0000As some interfaces are not contained in the same assembly operations and therefore, may not have been identified by the rule-based algorithm. More research should be done by testing and improving the algorithm with other case studies.\u0000\u0000\u0000Practical implications\u0000The paper includes implications for new product development teams to address the difficulties of integrating reused components into different products.\u0000\u0000\u0000Originality/value\u0000This paper presents a tool for identifying interfaces when sources of knowledge do not allow the use of current methods.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49345784","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated applications of building information modeling in project cost management: a systematic review 建筑信息模型在工程造价管理中的综合应用综述
IF 2.8 Q2 Engineering Pub Date : 2023-06-19 DOI: 10.1108/jedt-10-2022-0538
A. M. Farouk, R. Rahman
PurposeImplementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.Design/methodology/approachThis study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.FindingsEighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.Originality/valueTo the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.
目的在建设项目中实施建筑信息模型(BIM)有很多好处。然而,BIM在项目成本管理中的应用仍然有限。本研究旨在回顾BIM在项目成本管理中应用的当前趋势。设计/方法/途径本研究系统地回顾了BIM在项目成本管理中的应用。使用系统评价首选报告项目和荟萃分析方法,共识别和分析了46篇相关文章。发现在项目成本管理中应用BIM的方法有18种。这些方法可分为成本控制和成本估算。同时,BIM既可以独立应用,也可以与其他技术相结合。成本控制的综合方法包括遗传算法、蒙特卡罗模拟、精益建设、综合项目交付、神经网络和价值工程的集成。与此相反,集成成本估算方法包括与成本加成定价、差异分析、施工进度曲线、估算标准、算法、声明性映射、生命周期可持续性评估、本体、基于web的框架和结构化查询语言的集成。原创性/价值据作者所知,本研究是第一个系统地回顾BIM在项目成本管理中应用的先前文献。因此,该研究提供了对艺术现状的全面了解,填补了文献空白。研究人员和行业专业人士可以使用研究结果来增加在建筑项目中实施BIM的好处。
{"title":"Integrated applications of building information modeling in project cost management: a systematic review","authors":"A. M. Farouk, R. Rahman","doi":"10.1108/jedt-10-2022-0538","DOIUrl":"https://doi.org/10.1108/jedt-10-2022-0538","url":null,"abstract":"\u0000Purpose\u0000Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.\u0000\u0000\u0000Design/methodology/approach\u0000This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.\u0000\u0000\u0000Findings\u0000Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.\u0000\u0000\u0000Originality/value\u0000To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43296115","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Building mechanism of the initial trust motivation of owners toward contractors 业主对承包商初始信任动机的构建机制
IF 2.8 Q2 Engineering Pub Date : 2023-06-16 DOI: 10.1108/jedt-06-2022-0331
Huimin Li, Mengxuan Liang, Han Han, Wenjuan Zhang
PurposeThis paper aims to study the initial trust of the owner to the contractor, establish the initial trust mechanism, explore the factors that affect the initial trust of the owner to the contractor and analyze its influence mechanism. Based on this, it is easy for the owners and contractors to take targeted measures to improve the initial trust, which is conducive to the sustainable development of the project.Design/methodology/approachOn the basis of reading a large amount of literature, this paper constructs the occurrence mechanism of the owner's initial trust to the contractor from the five factors of trust propensity, trust belief, trustee’s characteristics, institution-based trust, trust motivation and from the perspective of the owner using the structural equation model for questionnaire survey and empirical analysis.FindingsThe results of this paper show that the institution-based trust, the trustee’s characteristics and the trust belief of the trustor clearly have a positive effect on trust motivation, and the trustee’s characteristics have the most significant effect on the trust motivation. The influence of trust propensity on trust motivation was not significant.Originality/valueThis paper studies the occurrence mechanism of the owner's initial trust in the contractor, discusses its influencing factors and analyzes the influence of these factors on the initial trust, which enriches the theoretical system of initial trust research. The results of this study can help owners and contractors to develop targeted measures to build good initial trust.
目的研究业主对承包商的初始信任,建立初始信任机制,探讨影响业主对承包商初始信任的因素,分析其影响机制。基于此,业主和承包商很容易采取有针对性的措施来提高最初的信任度,这有利于项目的可持续发展。设计/方法论/方法在阅读大量文献的基础上,从信任倾向、信任信念、受托人特征、制度信任、,并从所有者的角度,运用结构方程模型对信任动机进行问卷调查和实证分析。研究结果表明,基于制度的信任、受托人的特征和委托人的信任信念对信任动机有明显的正向影响,而受托人的特点对信任动机的影响最为显著。信任倾向对信任动机的影响不显著。独创性/价值本文研究了业主对承包商初始信任的发生机制,探讨了其影响因素,并分析了这些因素对初始信任的影响,丰富了初始信任研究的理论体系。这项研究的结果可以帮助业主和承包商制定有针对性的措施,建立良好的初始信任。
{"title":"Building mechanism of the initial trust motivation of owners toward contractors","authors":"Huimin Li, Mengxuan Liang, Han Han, Wenjuan Zhang","doi":"10.1108/jedt-06-2022-0331","DOIUrl":"https://doi.org/10.1108/jedt-06-2022-0331","url":null,"abstract":"\u0000Purpose\u0000This paper aims to study the initial trust of the owner to the contractor, establish the initial trust mechanism, explore the factors that affect the initial trust of the owner to the contractor and analyze its influence mechanism. Based on this, it is easy for the owners and contractors to take targeted measures to improve the initial trust, which is conducive to the sustainable development of the project.\u0000\u0000\u0000Design/methodology/approach\u0000On the basis of reading a large amount of literature, this paper constructs the occurrence mechanism of the owner's initial trust to the contractor from the five factors of trust propensity, trust belief, trustee’s characteristics, institution-based trust, trust motivation and from the perspective of the owner using the structural equation model for questionnaire survey and empirical analysis.\u0000\u0000\u0000Findings\u0000The results of this paper show that the institution-based trust, the trustee’s characteristics and the trust belief of the trustor clearly have a positive effect on trust motivation, and the trustee’s characteristics have the most significant effect on the trust motivation. The influence of trust propensity on trust motivation was not significant.\u0000\u0000\u0000Originality/value\u0000This paper studies the occurrence mechanism of the owner's initial trust in the contractor, discusses its influencing factors and analyzes the influence of these factors on the initial trust, which enriches the theoretical system of initial trust research. The results of this study can help owners and contractors to develop targeted measures to build good initial trust.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44914083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigating the implementation of immersive technologies within on-site construction safety processes 调查现场施工安全流程中沉浸式技术的实施情况
IF 2.8 Q2 Engineering Pub Date : 2023-06-13 DOI: 10.1108/jedt-01-2023-0005
Mark Swallow, S. Zulu
PurposeThe benefits of integrating immersive technologies (ImTs) within a construction safety context are acknowledged within the literature; however, its practical application on construction sites remains low. Whilst research into the integration of ImTs within the construction industry is underway, most have viewed this from a broader adoption context or within educational settings, and not specifically from a practical on-site safety perspective. Therefore, the purpose of this study is to address the contributing factors to its integration within on-site safety processes, using the experiences of active construction professionals.Design/methodology/approachThis study adopts a qualitative approach. Data was collected through online focus groups involving UK based construction professionals with experience in using ImTs, recruited using selective sampling. Data sets were subsequently analysed using inductive thematic analysis and are presented within key themes.FindingsThe results showed that among the experienced construction professionals, the use of ImTs specifically for on-site safety applications (including inductions/training/workshops) was rare on projects. The findings identified various contributing factors related to the integration of ImTs, including the potential improvements in on-site safety practices such as enhanced communication of hazards, safety planning, engagement during training and more accurate risk assessment. Critical challenges, concerns and frustrations included a lack of engagement from senior level management, inadequate leadership, limited investment, a need for digital expertise, fear of complacency and the acceptance of ImTs within existing safety processes from the wider project team.Originality/valueThis study provides a fresh perspective to this field by using practical accounts from active and experienced on-site construction professionals. This study supports the integration of ImTs within the construction industry, presenting key contributing factors influencing its integration within on-site safety processes. These factors can be considered by industry adopters, and includes the rationale, challenges and potential on-site benefits of ImTs.
目的将沉浸式技术(ImTs)整合到建筑安全环境中的好处在文献中得到了认可;然而,它在建筑工地上的实际应用仍然很低。虽然ImT在建筑行业中的整合研究正在进行中,但大多数人都是从更广泛的采用背景或教育环境中来看待这一点的,而不是从实际的现场安全角度来看待。因此,本研究的目的是利用活跃的建筑专业人员的经验,解决其在现场安全流程中整合的促成因素。设计/方法论/方法本研究采用定性方法。数据是通过在线焦点小组收集的,这些小组涉及有使用ImT经验的英国建筑专业人员,他们是通过选择性抽样招募的。随后使用归纳专题分析法对数据集进行了分析,并在关键专题中提出。结果表明,在经验丰富的建筑专业人员中,专门用于现场安全应用(包括入职培训/研讨会)的ImTs在项目中很少使用。研究结果确定了与ImTs整合相关的各种因素,包括现场安全实践的潜在改进,如加强危险沟通、安全规划、培训期间的参与以及更准确的风险评估。关键的挑战、担忧和挫折包括高层管理层缺乏参与、领导力不足、投资有限、需要数字专业知识、担心自满以及更广泛的项目团队在现有安全流程中接受ImT。独创性/价值本研究通过使用活跃且经验丰富的现场施工专业人员的实际账户,为该领域提供了一个新的视角。本研究支持ImT在建筑行业中的整合,提出了影响其在现场安全流程中整合的关键因素。行业采用者可以考虑这些因素,包括ImT的原理、挑战和潜在的现场效益。
{"title":"Investigating the implementation of immersive technologies within on-site construction safety processes","authors":"Mark Swallow, S. Zulu","doi":"10.1108/jedt-01-2023-0005","DOIUrl":"https://doi.org/10.1108/jedt-01-2023-0005","url":null,"abstract":"\u0000Purpose\u0000The benefits of integrating immersive technologies (ImTs) within a construction safety context are acknowledged within the literature; however, its practical application on construction sites remains low. Whilst research into the integration of ImTs within the construction industry is underway, most have viewed this from a broader adoption context or within educational settings, and not specifically from a practical on-site safety perspective. Therefore, the purpose of this study is to address the contributing factors to its integration within on-site safety processes, using the experiences of active construction professionals.\u0000\u0000\u0000Design/methodology/approach\u0000This study adopts a qualitative approach. Data was collected through online focus groups involving UK based construction professionals with experience in using ImTs, recruited using selective sampling. Data sets were subsequently analysed using inductive thematic analysis and are presented within key themes.\u0000\u0000\u0000Findings\u0000The results showed that among the experienced construction professionals, the use of ImTs specifically for on-site safety applications (including inductions/training/workshops) was rare on projects. The findings identified various contributing factors related to the integration of ImTs, including the potential improvements in on-site safety practices such as enhanced communication of hazards, safety planning, engagement during training and more accurate risk assessment. Critical challenges, concerns and frustrations included a lack of engagement from senior level management, inadequate leadership, limited investment, a need for digital expertise, fear of complacency and the acceptance of ImTs within existing safety processes from the wider project team.\u0000\u0000\u0000Originality/value\u0000This study provides a fresh perspective to this field by using practical accounts from active and experienced on-site construction professionals. This study supports the integration of ImTs within the construction industry, presenting key contributing factors influencing its integration within on-site safety processes. These factors can be considered by industry adopters, and includes the rationale, challenges and potential on-site benefits of ImTs.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48991401","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A hybrid machine learning approach for early cost estimation of pile foundations 一种用于桩基早期成本估算的混合机器学习方法
IF 2.8 Q2 Engineering Pub Date : 2023-06-13 DOI: 10.1108/jedt-03-2023-0097
G. Deepa, A. Niranjana, A. Balu
PurposeThis study aims at proposing a hybrid model for early cost prediction of a construction project. Early cost prediction for a construction project is the basic approach to procure a project within a predefined budget. However, most of the projects routinely face the impact of cost overruns. Furthermore, conventional and manual cost computing techniques are hectic, time-consuming and error-prone. To deal with such challenges, soft computing techniques such as artificial neural networks (ANNs), fuzzy logic and genetic algorithms are applied in construction management. Each technique has its own constraints not only in terms of efficiency but also in terms of feasibility, practicability, reliability and environmental impacts. However, appropriate combination of the techniques improves the model owing to their inherent nature.Design/methodology/approachThis paper proposes a hybrid model by combining machine learning (ML) techniques with ANN to accurately predict the cost of pile foundations. The parameters contributing toward the cost of pile foundations were collected from five different projects in India. Out of 180 collected data entries, 176 entries were finally used after data cleaning. About 70% of the final data were used for building the model and the remaining 30% were used for validation.FindingsThe proposed model is capable of predicting the pile foundation costs with an accuracy of 97.42%.Originality/valueAlthough various cost estimation techniques are available, appropriate use and combination of various ML techniques aid in improving the prediction accuracy. The proposed model will be a value addition to cost estimation of pile foundations.
目的提出一种用于建设项目早期成本预测的混合模型。建筑项目的早期成本预测是在预先确定的预算范围内获得项目的基本方法。然而,大多数项目经常面临成本超支的影响。此外,传统的和人工的成本计算技术是忙乱的、耗时的和容易出错的。为了应对这些挑战,人工神经网络、模糊逻辑和遗传算法等软计算技术被应用于施工管理中。每种技术不仅在效率方面,而且在可行性、实用性、可靠性和环境影响方面都有自己的限制。然而,由于这些技术的固有性质,适当的组合可以改进模型。本文提出了一种结合机器学习(ML)技术和人工神经网络的混合模型,以准确预测桩基成本。从印度的五个不同项目中收集了影响桩基成本的参数。在收集的180个数据条目中,数据清理后最终使用了176个条目。约70%的最终数据用于构建模型,其余30%用于验证。结果:该模型预测桩基成本的准确率为97.42%。原创性/价值虽然有各种各样的成本估算技术,但适当地使用和组合各种机器学习技术有助于提高预测的准确性。该模型对桩基造价估算具有一定的价值。
{"title":"A hybrid machine learning approach for early cost estimation of pile foundations","authors":"G. Deepa, A. Niranjana, A. Balu","doi":"10.1108/jedt-03-2023-0097","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0097","url":null,"abstract":"\u0000Purpose\u0000This study aims at proposing a hybrid model for early cost prediction of a construction project. Early cost prediction for a construction project is the basic approach to procure a project within a predefined budget. However, most of the projects routinely face the impact of cost overruns. Furthermore, conventional and manual cost computing techniques are hectic, time-consuming and error-prone. To deal with such challenges, soft computing techniques such as artificial neural networks (ANNs), fuzzy logic and genetic algorithms are applied in construction management. Each technique has its own constraints not only in terms of efficiency but also in terms of feasibility, practicability, reliability and environmental impacts. However, appropriate combination of the techniques improves the model owing to their inherent nature.\u0000\u0000\u0000Design/methodology/approach\u0000This paper proposes a hybrid model by combining machine learning (ML) techniques with ANN to accurately predict the cost of pile foundations. The parameters contributing toward the cost of pile foundations were collected from five different projects in India. Out of 180 collected data entries, 176 entries were finally used after data cleaning. About 70% of the final data were used for building the model and the remaining 30% were used for validation.\u0000\u0000\u0000Findings\u0000The proposed model is capable of predicting the pile foundation costs with an accuracy of 97.42%.\u0000\u0000\u0000Originality/value\u0000Although various cost estimation techniques are available, appropriate use and combination of various ML techniques aid in improving the prediction accuracy. The proposed model will be a value addition to cost estimation of pile foundations.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41770591","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Job crafting-job embeddedness linkage of construction professionals: moderating effect of career stages 建筑专业人员工作加工-工作嵌入联结:职业阶段的调节作用
IF 2.8 Q2 Engineering Pub Date : 2023-06-05 DOI: 10.1108/jedt-09-2022-0498
Mustafa AlMemari, Khalizani Khalid, Abdullah Osman
PurposeConstruction managers must focus on effective job design to develop and harness employee talent and achieve organizational goals. Because psychological needs and key motivators vary by career stage, a differentiated employee value proposition is crucial for a firm’s retention strategy. This study aims to examine how job crafting (JC) affects job embeddedness (JE) at different career stages.Design/methodology/approachIn this investigation, a quantitative methodology was used. In total, 272 construction industry professionals from 25 construction firms in Abu Dhabi, United Arab Emirates, provided the data. Through the use of structural equation modeling, hypotheses were evaluated.FindingsThe results show that JC enhances construction professionals’ JE (β = 0.60, p < 0.000). Moreover, the relationship between JC and JE is moderated by career stages. The impact of JC on JE is greater among longer tenured (late-career stages, β = 0.61, p < 0.000) than shorter tenured construction professionals (early-career stages, β = 0.60, p < 0.000 and mid-career stages, β = 0.58, p < 0.000).Originality/valueLimited research shows how JC can improve JE. At the time of this research, there was no published work on JC and JE relationship in the construction industry. This research found that JC has a positive impact on JE and JC behavior applies at both individual and team levels. This could imply that construction professionals with longer organizational tenure are more likely to challenge the status quo and identify problems or opportunities for improvement, hence contributes to JE theory.
结构经理必须关注有效的工作设计,以开发和利用员工才能,实现组织目标。由于心理需求和关键激励因素因职业发展阶段而异,因此差异化的员工价值主张对公司的保留战略至关重要。本研究旨在探讨不同职业阶段的工作塑造(JC)对工作嵌入性(JE)的影响。设计/方法/方法在这项调查中,采用了定量方法。来自阿拉伯联合酋长国阿布扎比25家建筑公司的272名建筑行业专业人员提供了数据。通过使用结构方程模型,对假设进行了评估。结果表明:JC对建筑专业人员乙脑有显著的促进作用(β = 0.60, p < 0.000)。此外,职业生涯阶段对工作焦虑与脑卒中的关系有调节作用。任职时间较长的建筑专业人员(职业生涯后期,β = 0.61, p < 0.000)对乙脑的影响大于任职时间较短的建筑专业人员(职业生涯早期,β = 0.60, p < 0.000)和职业生涯中期,β = 0.58, p < 0.000)。独创性/价值有限的研究显示了JC如何改善JE。在本研究进行时,还没有关于建筑行业JC和JE关系的出版作品。本研究发现JC对JE有正向影响,并且JC行为在个人和团队层面都适用。这可能意味着具有较长组织任期的建筑专业人员更有可能挑战现状,发现问题或改进机会,从而有助于JE理论。
{"title":"Job crafting-job embeddedness linkage of construction professionals: moderating effect of career stages","authors":"Mustafa AlMemari, Khalizani Khalid, Abdullah Osman","doi":"10.1108/jedt-09-2022-0498","DOIUrl":"https://doi.org/10.1108/jedt-09-2022-0498","url":null,"abstract":"\u0000Purpose\u0000Construction managers must focus on effective job design to develop and harness employee talent and achieve organizational goals. Because psychological needs and key motivators vary by career stage, a differentiated employee value proposition is crucial for a firm’s retention strategy. This study aims to examine how job crafting (JC) affects job embeddedness (JE) at different career stages.\u0000\u0000\u0000Design/methodology/approach\u0000In this investigation, a quantitative methodology was used. In total, 272 construction industry professionals from 25 construction firms in Abu Dhabi, United Arab Emirates, provided the data. Through the use of structural equation modeling, hypotheses were evaluated.\u0000\u0000\u0000Findings\u0000The results show that JC enhances construction professionals’ JE (β = 0.60, p < 0.000). Moreover, the relationship between JC and JE is moderated by career stages. The impact of JC on JE is greater among longer tenured (late-career stages, β = 0.61, p < 0.000) than shorter tenured construction professionals (early-career stages, β = 0.60, p < 0.000 and mid-career stages, β = 0.58, p < 0.000).\u0000\u0000\u0000Originality/value\u0000Limited research shows how JC can improve JE. At the time of this research, there was no published work on JC and JE relationship in the construction industry. This research found that JC has a positive impact on JE and JC behavior applies at both individual and team levels. This could imply that construction professionals with longer organizational tenure are more likely to challenge the status quo and identify problems or opportunities for improvement, hence contributes to JE theory.\u0000","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":2.8,"publicationDate":"2023-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44552207","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An analysis of BIM-related job requirements based on text mining in China 基于文本挖掘的中国bim相关岗位需求分析
Q2 Engineering Pub Date : 2023-05-31 DOI: 10.1108/jedt-03-2023-0094
Jiahao Liu, Xi Xu, Jing Liu
Purpose Although building information modeling (BIM) has brought competitive advantages and many new jobs, the BIM-related job market is still confusing in China, which will undermine the adoption of BIM. This paper aims to show what kinds of BIM-related jobs are there in China, what employers require and whether all BIM engineers are the same kind. Design/methodology/approach A text mining approach, structural topic model, was used to process the job descriptions of 1,221 BIM-related online job advertisements in China, followed by a cluster analysis based on it. Findings First, 10 topics of requirements with the impact of experience and educational background to them were found, namely, rendering software, international project, design, management, personal quality, experience, modeling, relation and certificate. Then, six types were clustered, namely, BIM modeler, BIM application engineer, BIM consultant, BIM manager, BIM developer and BIM designer. Finally, different kinds of BIM engineers proved this title was an expediency leading to confusion. Originality/value This paper can provide a clear and insightful look into the confusing and unheeded BIM-related job market in China and might help to cope with the abuse of job titles. It could also benefit both employers and candidates in their recruitment for better matching.
虽然建筑信息模型(BIM)带来了竞争优势和许多新的就业机会,但在中国,与BIM相关的就业市场仍然混乱,这将破坏BIM的采用。本文旨在展示中国有哪些与BIM相关的工作,雇主需要什么,是否所有的BIM工程师都是同一类型的。设计/方法/方法采用文本挖掘方法,即结构化主题模型,对国内1221份bim相关的在线招聘广告的职位描述进行处理,并在此基础上进行聚类分析。首先,我们找到了经历和学历对其影响的10个需求主题,分别是渲染软件、国际项目、设计、管理、个人素质、经验、建模、关系和证书。然后,将BIM建模师、BIM应用工程师、BIM顾问、BIM经理、BIM开发人员和BIM设计师分成6类。最后,不同类型的BIM工程师证明了这个头衔是一种权宜之计,导致混乱。原创性/价值本文可以清晰而深刻地了解中国与bim相关的就业市场,并可能有助于应对职称滥用问题。这也有利于雇主和候选人在招聘中更好地匹配。
{"title":"An analysis of BIM-related job requirements based on text mining in China","authors":"Jiahao Liu, Xi Xu, Jing Liu","doi":"10.1108/jedt-03-2023-0094","DOIUrl":"https://doi.org/10.1108/jedt-03-2023-0094","url":null,"abstract":"Purpose Although building information modeling (BIM) has brought competitive advantages and many new jobs, the BIM-related job market is still confusing in China, which will undermine the adoption of BIM. This paper aims to show what kinds of BIM-related jobs are there in China, what employers require and whether all BIM engineers are the same kind. Design/methodology/approach A text mining approach, structural topic model, was used to process the job descriptions of 1,221 BIM-related online job advertisements in China, followed by a cluster analysis based on it. Findings First, 10 topics of requirements with the impact of experience and educational background to them were found, namely, rendering software, international project, design, management, personal quality, experience, modeling, relation and certificate. Then, six types were clustered, namely, BIM modeler, BIM application engineer, BIM consultant, BIM manager, BIM developer and BIM designer. Finally, different kinds of BIM engineers proved this title was an expediency leading to confusion. Originality/value This paper can provide a clear and insightful look into the confusing and unheeded BIM-related job market in China and might help to cope with the abuse of job titles. It could also benefit both employers and candidates in their recruitment for better matching.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"135394950","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Journal of Engineering Design and Technology
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1