A Planning Purchasing Policies for Raw Material Welding Wire Using Economic Order Quantity (EOQ) Method to Reduce Overstock 使用经济订货量(EOQ)法规划原材料焊丝采购政策以减少超量库存
Pub Date : 2024-02-21 DOI: 10.21070/pels.v7i0.1587
Mike Vidiasari, R. B. Jakaria
This study aims to determine the optimal order quantity of K71T welding wire for PT BMI's boiler production process to reduce storage and inventory costs. The Economic Order Quantity (EOQ) method is applied to calculate the optimal amount of material to be ordered in one period. The results show that the total inventory cost using the EOQ method is Rp. 89,060,000,- compared to the company policy of Rp. 290,840,000,-. The optimal number of orders is 407 boxes with a purchase frequency of 4 times per year and a safety stock of 181 boxes. The findings of this study can be used as a reference for other manufacturing companies that face similar procurement challenges to optimize their inventory management and reduce costs. Highlight : The study determines the optimal order quantity of K71T welding wire, reducing storage and inventory costs. The Economic Order Quantity (EOQ) method is applied, resulting in a total inventory cost of Rp. 89,060,000,- compared to the company policy of Rp. 290,840,000,-. The findings can be used as a reference for other manufacturing companies facing similar procurement challenges to optimize their inventory management and reduce costs. Keywords: welding wire, optimal order quantity, inventory management, procurement challenges, manufacturing companies
本研究旨在确定 PT BMI 锅炉生产过程中 K71T 焊丝的最佳订购量,以降低存储和库存成本。经济订货量(EOQ)法用于计算一个时期内的最佳订货量。结果显示,使用 EOQ 方法计算的总库存成本为 89,060,000 印尼盾。89,060,000 印尼盾,而公司的政策是 290,840,000 印尼盾。最佳订单数量为 407 箱,采购频率为每年 4 次,安全库存为 181 箱。这项研究的结果可供面临类似采购挑战的其他制造企业参考,以优化其库存管理并降低成本。亮点:本研究确定了 K71T 焊丝的最佳订购量,降低了存储和库存成本。采用经济订货量(EOQ)方法,总库存成本为 89,060,000 印尼盾,而公司政策为 290,840,000 印尼盾。研究结果可供面临类似采购挑战的其他制造企业优化库存管理、降低成本时参考。 关键词:焊丝、最佳订货量、库存管理、采购挑战、制造企业
{"title":"A Planning Purchasing Policies for Raw Material Welding Wire Using Economic Order Quantity (EOQ) Method to Reduce Overstock","authors":"Mike Vidiasari, R. B. Jakaria","doi":"10.21070/pels.v7i0.1587","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1587","url":null,"abstract":"This study aims to determine the optimal order quantity of K71T welding wire for PT BMI's boiler production process to reduce storage and inventory costs. The Economic Order Quantity (EOQ) method is applied to calculate the optimal amount of material to be ordered in one period. The results show that the total inventory cost using the EOQ method is Rp. 89,060,000,- compared to the company policy of Rp. 290,840,000,-. The optimal number of orders is 407 boxes with a purchase frequency of 4 times per year and a safety stock of 181 boxes. The findings of this study can be used as a reference for other manufacturing companies that face similar procurement challenges to optimize their inventory management and reduce costs. \u0000Highlight : \u0000 \u0000The study determines the optimal order quantity of K71T welding wire, reducing storage and inventory costs. \u0000The Economic Order Quantity (EOQ) method is applied, resulting in a total inventory cost of Rp. 89,060,000,- compared to the company policy of Rp. 290,840,000,-. \u0000The findings can be used as a reference for other manufacturing companies facing similar procurement challenges to optimize their inventory management and reduce costs. \u0000 \u0000Keywords: welding wire, optimal order quantity, inventory management, procurement challenges, manufacturing companies","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"95 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140443996","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Forecasting Analysis of Raw Material Demand in the Battery Breaker Production Process at PT IMLI PT IMLI 公司电池断路器生产过程中的原材料需求预测分析
Pub Date : 2024-02-21 DOI: 10.21070/pels.v7i0.1588
Muhammad Hizam Anshori, A. S. Cahyana
Accurate demand forecasting is crucial for companies engaged in smelting, such as PT IMLI, to prevent shortages and inventory increases. This research aims to determine the most appropriate forecasting method for raw material demand based on historical data. Three methods were used: moving average with n = 3 and n = 5, and exponential smoothing with α = 0.2. The results showed that the Exponential Smoothing Method with α = 0.2 had the smallest error rate, with a MAPE value of 23%, MAD of 411, and MSE of 293303. This method can be used to optimize demand forecasting for the next period, ensuring that the company has sufficient raw materials for black tin smelting. Highlight : Accurate demand forecasting is crucial for companies engaged in smelting to prevent shortages and inventory increases. Three methods were used to determine the most appropriate forecasting method for raw material demand based on historical data: moving average with n = 3 and n = 5, and exponential smoothing with α = 0.2. The Exponential Smoothing Method with α = 0.2 had the smallest error rate, with a MAPE value of 23%, MAD of 411, and MSE of 293303, and can be used to optimize demand forecasting for the next period. Keywords: demand forecasting, smelting, raw materials, historical data, moving average, exponential smoothing.
准确的需求预测对于从事冶炼的公司(如 PT IMLI)来说至关重要,可以防止短缺和库存增加。本研究旨在根据历史数据确定最合适的原材料需求预测方法。使用了三种方法:n = 3 和 n = 5 的移动平均法,以及 α = 0.2 的指数平滑法。结果表明,α = 0.2 指数平滑法的误差率最小,MAPE 值为 23%,MAD 为 411,MSE 为 293303。该方法可用于优化下一时期的需求预测,确保公司有足够的原材料用于黑锡冶炼。亮点:准确的需求预测对于从事冶炼的公司来说至关重要,可以防止短缺和库存增加。根据历史数据,我们采用了三种方法来确定最合适的原材料需求预测方法:n = 3 和 n = 5 的移动平均法,以及 α = 0.2 的指数平滑法。α=0.2指数平滑法的误差率最小,MAPE值为23%,MAD为411,MSE为293303,可用于优化下一时期的需求预测。 关键词:需求预测、冶炼、原材料、历史数据、移动平均、指数平滑。
{"title":"Forecasting Analysis of Raw Material Demand in the Battery Breaker Production Process at PT IMLI","authors":"Muhammad Hizam Anshori, A. S. Cahyana","doi":"10.21070/pels.v7i0.1588","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1588","url":null,"abstract":"Accurate demand forecasting is crucial for companies engaged in smelting, such as PT IMLI, to prevent shortages and inventory increases. This research aims to determine the most appropriate forecasting method for raw material demand based on historical data. Three methods were used: moving average with n = 3 and n = 5, and exponential smoothing with α = 0.2. The results showed that the Exponential Smoothing Method with α = 0.2 had the smallest error rate, with a MAPE value of 23%, MAD of 411, and MSE of 293303. This method can be used to optimize demand forecasting for the next period, ensuring that the company has sufficient raw materials for black tin smelting. \u0000Highlight : \u0000 \u0000Accurate demand forecasting is crucial for companies engaged in smelting to prevent shortages and inventory increases. \u0000Three methods were used to determine the most appropriate forecasting method for raw material demand based on historical data: moving average with n = 3 and n = 5, and exponential smoothing with α = 0.2. \u0000The Exponential Smoothing Method with α = 0.2 had the smallest error rate, with a MAPE value of 23%, MAD of 411, and MSE of 293303, and can be used to optimize demand forecasting for the next period. \u0000 \u0000Keywords: demand forecasting, smelting, raw materials, historical data, moving average, exponential smoothing.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"96 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140443990","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Development of ETS (E-Ticketing System) Module for Issue Management at PT Pelayaran Nasional Ekalya Purnamasari 在 PT Pelayaran Nasional Ekalya Purnamasari 开发用于发行管理的 ETS(电子票务系统)模块
Pub Date : 2024-02-21 DOI: 10.21070/pels.v7i0.1586
Muhammad Syamsuddin, Uce Indahyanti
This study presents a research proposal aimed at addressing the need for improved internal management systems in the logistics industry. The goal is to introduce an Employee Tracking System (ETS) module integrated with the Human Resource Information System (HRIS) to facilitate real-time communication and problem-solving within the organization. The study focuses on the practical challenges of organizational management and the ongoing evolution of information technology in the workplace. The proposed ETS module is expected to enhance employee communication and streamline issue resolution, ultimately contributing to improved organizational efficiency and effectiveness. The research methodology involves a one-month internship program, during which students will work on implementing the ETS module and evaluating its impact on internal management processes. The results of this study are expected to provide valuable insights into the potential benefits of integrating information systems in the logistics industry, with implications for similar organizations seeking to modernize their internal management practices. Highlight : Problem: Logistics industry needs better internal management systems. Solution: Integrate Employee Tracking System (ETS) with Human Resource Information System (HRIS) for real-time communication and problem-solving. Research: Internship program implements and evaluates ETS module to assess impact on efficiency and effectiveness. Keywords: Logistics, Employee Tracking System, HRIS integration, Real-time communication, Organizational efficiency
本研究提出了一项研究建议,旨在满足物流业对改进内部管理系统的需求。目标是引入一个与人力资源信息系统(HRIS)集成的员工跟踪系统(ETS)模块,以促进组织内部的实时沟通和问题解决。研究的重点是组织管理的实际挑战和工作场所信息技术的不断发展。拟议的 ETS 模块有望加强员工沟通,简化问题解决流程,最终有助于提高组织效率和效益。研究方法包括为期一个月的实习计划,在此期间,学生将实施 ETS 模块,并评估其对内部管理流程的影响。这项研究的结果有望为物流业整合信息系统的潜在效益提供有价值的见解,并对寻求内部管理实践现代化的类似组织产生影响。亮点:问题:物流业需要更好的内部管理系统。解决方案:整合员工跟踪系统(ETS)和人力资源信息系统(HRIS),实现实时沟通和解决问题。研究:实习项目实施并评估 ETS 模块,以评估其对效率和效益的影响。 关键词物流 员工追踪系统 人力资源信息系统整合 实时沟通 组织效率
{"title":"Development of ETS (E-Ticketing System) Module for Issue Management at PT Pelayaran Nasional Ekalya Purnamasari","authors":"Muhammad Syamsuddin, Uce Indahyanti","doi":"10.21070/pels.v7i0.1586","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1586","url":null,"abstract":"This study presents a research proposal aimed at addressing the need for improved internal management systems in the logistics industry. The goal is to introduce an Employee Tracking System (ETS) module integrated with the Human Resource Information System (HRIS) to facilitate real-time communication and problem-solving within the organization. The study focuses on the practical challenges of organizational management and the ongoing evolution of information technology in the workplace. The proposed ETS module is expected to enhance employee communication and streamline issue resolution, ultimately contributing to improved organizational efficiency and effectiveness. The research methodology involves a one-month internship program, during which students will work on implementing the ETS module and evaluating its impact on internal management processes. The results of this study are expected to provide valuable insights into the potential benefits of integrating information systems in the logistics industry, with implications for similar organizations seeking to modernize their internal management practices. \u0000Highlight : \u0000 \u0000Problem: Logistics industry needs better internal management systems. \u0000Solution: Integrate Employee Tracking System (ETS) with Human Resource Information System (HRIS) for real-time communication and problem-solving. \u0000Research: Internship program implements and evaluates ETS module to assess impact on efficiency and effectiveness. \u0000 \u0000Keywords: Logistics, Employee Tracking System, HRIS integration, Real-time communication, Organizational efficiency","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"49 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140444813","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Quality Control Analysis Using the Failure Mode and Effect Analysis Method 使用失效模式与影响分析法进行质量控制分析
Pub Date : 2024-02-21 DOI: 10.21070/pels.v7i0.1589
Muchammad Lukman Hakim, A. S. Cahyana
This study aimed to investigate critical factors contributing to defective Epodion® rh-Erythropoietin Alfa syringes, specifically focusing on reducing cracks during manufacturing. A Failure Mode and Effect Analysis (FMEA) approach was employed to identify the primary causes of failure, revealing cracking as the predominant issue affecting 43% of defective units. To mitigate this concern, we calculated a Risk Priority Number (RPN) of 162, highlighting the significance of addressing material-related issues. By recommending enhanced quality control measures for raw materials prior to their utilization within the production process, our findings suggest potential improvements in material strength, thereby minimizing product defects Highlight : The study aimed to investigate factors contributing to defective Epodion® rh-Erythropoietin Alfa syringes, with a focus on reducing cracks during manufacturing. A Failure Mode and Effect Analysis (FMEA) approach was used to identify the primary causes of failure, revealing cracking as the predominant issue affecting 43% of defective units. Enhanced quality control measures for raw materials prior to their utilization within the production process were recommended to minimize product defects. Keywords: Epodion, rh-Erythropoietin Alfa, syringes, FMEA, quality control.
本研究旨在调查导致 Epodion® rh-Erythropoietin Alfa 注射器出现缺陷的关键因素,尤其侧重于减少生产过程中的裂纹。我们采用了失效模式和影响分析 (FMEA) 方法来确定失效的主要原因,结果发现裂纹是影响 43% 缺陷产品的主要问题。为了减少这一问题,我们计算出的风险优先值 (RPN) 为 162,突出了解决材料相关问题的重要性。通过建议在生产过程中使用原材料之前加强对原材料的质量控制措施,我们的研究结果表明了提高材料强度的可能性,从而最大限度地减少产品缺陷。 该研究旨在调查造成 Epodion® rh-Erythropoietin Alfa 注射器缺陷的因素,重点是减少生产过程中的裂纹。研究采用了失效模式和影响分析 (FMEA) 方法来确定失效的主要原因,结果发现裂纹是主要问题,影响了 43% 的缺陷产品。建议在生产过程中使用原材料之前加强质量控制措施,以尽量减少产品缺陷。 关键词Epodion、rh-促红细胞生成素α、注射器、FMEA、质量控制。
{"title":"Quality Control Analysis Using the Failure Mode and Effect Analysis Method","authors":"Muchammad Lukman Hakim, A. S. Cahyana","doi":"10.21070/pels.v7i0.1589","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1589","url":null,"abstract":"This study aimed to investigate critical factors contributing to defective Epodion® rh-Erythropoietin Alfa syringes, specifically focusing on reducing cracks during manufacturing. A Failure Mode and Effect Analysis (FMEA) approach was employed to identify the primary causes of failure, revealing cracking as the predominant issue affecting 43% of defective units. To mitigate this concern, we calculated a Risk Priority Number (RPN) of 162, highlighting the significance of addressing material-related issues. By recommending enhanced quality control measures for raw materials prior to their utilization within the production process, our findings suggest potential improvements in material strength, thereby minimizing product defects \u0000Highlight : \u0000 \u0000The study aimed to investigate factors contributing to defective Epodion® rh-Erythropoietin Alfa syringes, with a focus on reducing cracks during manufacturing. \u0000A Failure Mode and Effect Analysis (FMEA) approach was used to identify the primary causes of failure, revealing cracking as the predominant issue affecting 43% of defective units. \u0000Enhanced quality control measures for raw materials prior to their utilization within the production process were recommended to minimize product defects. \u0000 \u0000Keywords: Epodion, rh-Erythropoietin Alfa, syringes, FMEA, quality control.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"7 5","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140445607","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Accu Scrap Raw Material Inventorycontrol Using the Min- Max Method 使用最小-最大法对 Accu 废料原材料进行库存控制
Pub Date : 2024-02-21 DOI: 10.21070/pels.v7i0.1590
Muhammad Nur Faizin, R. B. Jakaria
To address stockouts and overstock concerns in Accu scrap processing, this research introduces the application of the Min-Max method to enhance inventory control performance. Implementing this approach on bullion and ingot products resulted in a 33% improvement in inventory management effectiveness. The Min-Max method facilitated the determination of safe stock levels, minimal order quantities, and reorder points, thereby promoting efficient resource allocation and supply chain optimization. Consequently, manufacturers experienced reduced operating expenses while maintaining competitive edge and responsiveness to market dynamics Highlight : The Min-Max method improved inventory management effectiveness by 33%. This approach facilitated the determination of safe stock levels, minimal order quantities, and reorder points. Manufacturers experienced reduced operating expenses while maintaining competitive edge and responsiveness to market dynamics. Keywords: Accu scrap processing, Min-Max method, inventory control, supply chain optimization, resource allocation
为解决 Accu 废料加工过程中的缺货和超储问题,本研究介绍了最小最大法的应用,以提高库存控制绩效。在金块和金锭产品中采用这种方法后,库存管理效率提高了 33%。Min-Max 法有助于确定安全库存水平、最小订货量和再订货点,从而促进有效的资源分配和供应链优化。因此,制造商降低了运营成本,同时保持了竞争优势和对市场动态的反应能力 亮点:Min-Max 法使库存管理效率提高了 33%。这种方法有助于确定安全库存水平、最小订货量和再订货点。制造商在保持竞争优势和应对市场动态的能力的同时,也降低了运营成本。 关键词Accu 废料处理、最小最大法、库存控制、供应链优化、资源分配
{"title":"Accu Scrap Raw Material Inventorycontrol Using the Min- Max Method","authors":"Muhammad Nur Faizin, R. B. Jakaria","doi":"10.21070/pels.v7i0.1590","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1590","url":null,"abstract":"To address stockouts and overstock concerns in Accu scrap processing, this research introduces the application of the Min-Max method to enhance inventory control performance. Implementing this approach on bullion and ingot products resulted in a 33% improvement in inventory management effectiveness. The Min-Max method facilitated the determination of safe stock levels, minimal order quantities, and reorder points, thereby promoting efficient resource allocation and supply chain optimization. Consequently, manufacturers experienced reduced operating expenses while maintaining competitive edge and responsiveness to market dynamics \u0000Highlight : \u0000 \u0000The Min-Max method improved inventory management effectiveness by 33%. \u0000This approach facilitated the determination of safe stock levels, minimal order quantities, and reorder points. \u0000Manufacturers experienced reduced operating expenses while maintaining competitive edge and responsiveness to market dynamics. \u0000 \u0000Keywords: Accu scrap processing, Min-Max method, inventory control, supply chain optimization, resource allocation","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"90 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140444213","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Chicken Sausage Production Process At PT. Charoen Pokphand Indonesia Food Division, Ngoro Unit PT.Charoen Pokphand Indonesia 食品部恩戈罗分部
Pub Date : 2024-02-20 DOI: 10.21070/pels.v7i0.1494
Irma Kiranti, L. Hudi, Rifky Pradiko
This study investigated the chicken sausage production process and explored problem-solving strategies using fishbone diagrams. The analysis identified key stages, including raw material preparation, grinding, mixing, molding, cooking, cooling, cutting, and packaging. Fishbone diagrams were employed to systematically dissect process issues, revealing root causes related to personnel, methods, machines, materials, and environment. The findings highlight the effectiveness of fishbone diagrams for identifying and addressing production bottlenecks, paving the way for optimized efficiency and quality control in sausage manufacturing. Highlight : Process breakdown: The study identified key stages in chicken sausage production (preparation, grinding, mixing, etc.) using fishbone diagrams. Root cause analysis: Fishbone diagrams helped pinpoint root causes of process issues across various factors (personnel, methods, machines, etc.). Quality improvement: The findings suggest fishbone diagrams as an effective tool for identifying and addressing bottlenecks, leading to optimized efficiency and quality control. Keywords: chicken sausage, production process, fishbone diagrams, problem-solving, quality control
本研究调查了鸡肉香肠的生产过程,并利用鱼骨图探讨了解决问题的策略。分析确定了关键阶段,包括原料准备、研磨、混合、成型、烹饪、冷却、切割和包装。利用鱼骨图系统地剖析了流程问题,揭示了与人员、方法、机器、材料和环境有关的根本原因。研究结果凸显了鱼骨图在识别和解决生产瓶颈方面的有效性,为优化香肠生产的效率和质量控制铺平了道路。亮点:流程分解:研究利用鱼骨图确定了鸡肉香肠生产的关键阶段(准备、研磨、混合等)。根本原因分析:鱼骨图有助于找出各种因素(人员、方法、机器等)造成工艺问题的根本原因。质量改进:研究结果表明,鱼骨图是识别和解决瓶颈问题的有效工具,可优化效率和质量控制。 关键词:鸡肉香肠、生产流程、鱼骨图、问题解决、质量控制
{"title":"Chicken Sausage Production Process At PT. Charoen Pokphand Indonesia Food Division, Ngoro Unit","authors":"Irma Kiranti, L. Hudi, Rifky Pradiko","doi":"10.21070/pels.v7i0.1494","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1494","url":null,"abstract":"This study investigated the chicken sausage production process and explored problem-solving strategies using fishbone diagrams. The analysis identified key stages, including raw material preparation, grinding, mixing, molding, cooking, cooling, cutting, and packaging. Fishbone diagrams were employed to systematically dissect process issues, revealing root causes related to personnel, methods, machines, materials, and environment. The findings highlight the effectiveness of fishbone diagrams for identifying and addressing production bottlenecks, paving the way for optimized efficiency and quality control in sausage manufacturing. \u0000Highlight : \u0000 \u0000Process breakdown: The study identified key stages in chicken sausage production (preparation, grinding, mixing, etc.) using fishbone diagrams. \u0000Root cause analysis: Fishbone diagrams helped pinpoint root causes of process issues across various factors (personnel, methods, machines, etc.). \u0000Quality improvement: The findings suggest fishbone diagrams as an effective tool for identifying and addressing bottlenecks, leading to optimized efficiency and quality control. \u0000 \u0000Keywords: chicken sausage, production process, fishbone diagrams, problem-solving, quality control","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"39 25","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140449251","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Maintenance, OEE, Effectiveness Roving Machine Maintenance Using the Overall Equipment Effectiveness (OEE) Method at PT. Mertex Indoensia 维护, OEE, 效率 PT.Mertex Indoensia
Pub Date : 2024-02-20 DOI: 10.21070/pels.v7i0.1593
Alfien Ramadhan Syach Putera, Inggit Marodiyah
This study investigates the efficiency of roving machines at PT. Mertex Indonesia, revealing elevated downtime as a critical impediment impacting production flow and leading to decreased Overall Equipment Effectiveness (OEE) levels below industry benchmarks. By employing the OEE framework, we quantified the current state's performance at 66.92%, highlighting substantial room for improvement. Our findings underscore the need for targeted interventions aimed at reducing unplanned stoppages and enhancing equipment reliability, ultimately driving towards compliance with globally recognized best practices. Highlight : Elevated downtime significantly impacts production flow and leads to low OEE levels. The current OEE level stands at 66.92% indicating significant potential for improvement. Targeted interventions aim to reduce unplanned stoppages and enhance equipment reliability, aligning with global best practices. Keywords: PT. Mertex Indonesia, roving machines, downtime, Overall Equipment Effectiveness (OEE), production flow.
本研究调查了 PT.Mertex Indonesia 公司粗纱机的效率。Mertex Indonesia 公司的粗纱机效率进行了调查,发现停机时间过长是影响生产流程的关键因素,并导致整体设备效率 (OEE) 水平下降,低于行业基准。通过采用 OEE 框架,我们将目前的绩效水平量化为 66.92%,凸显了巨大的改进空间。我们的研究结果表明,有必要采取有针对性的干预措施,以减少意外停机,提高设备可靠性,最终达到全球公认的最佳实践标准。亮点:停机时间过长严重影响生产流程,导致 OEE 水平低下。目前的 OEE 水平为 66.92%,显示出巨大的改进潜力。有针对性的干预措施旨在减少计划外停机,提高设备可靠性,与全球最佳实践保持一致。 关键词:PT:PT.Mertex Indonesia、粗纱机、停机时间、整体设备效率(OEE)、生产流程。
{"title":"Maintenance, OEE, Effectiveness Roving Machine Maintenance Using the Overall Equipment Effectiveness (OEE) Method at PT. Mertex Indoensia","authors":"Alfien Ramadhan Syach Putera, Inggit Marodiyah","doi":"10.21070/pels.v7i0.1593","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1593","url":null,"abstract":"This study investigates the efficiency of roving machines at PT. Mertex Indonesia, revealing elevated downtime as a critical impediment impacting production flow and leading to decreased Overall Equipment Effectiveness (OEE) levels below industry benchmarks. By employing the OEE framework, we quantified the current state's performance at 66.92%, highlighting substantial room for improvement. Our findings underscore the need for targeted interventions aimed at reducing unplanned stoppages and enhancing equipment reliability, ultimately driving towards compliance with globally recognized best practices. \u0000Highlight : \u0000 \u0000Elevated downtime significantly impacts production flow and leads to low OEE levels. \u0000The current OEE level stands at 66.92% indicating significant potential for improvement. \u0000Targeted interventions aim to reduce unplanned stoppages and enhance equipment reliability, aligning with global best practices. \u0000 \u0000Keywords: PT. Mertex Indonesia, roving machines, downtime, Overall Equipment Effectiveness (OEE), production flow.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"254 15","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140448363","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Periodic Maintenance Analysis of Diesel Motor Generator Set 900 kVA Power as Backup Energy 作为备用能源的 900 千伏安柴油机发电机组的定期维护分析
Pub Date : 2024-02-20 DOI: 10.21070/pels.v7i0.1597
Rois Nur Rofiq Salam, E. Widodo
This study aims to evaluate the efficiency of generators as backup power sources through daily, monthly, and annual routine maintenance analysis to improve their reliability, availability, and operational health. The study was conducted in compliance with regulations related to electrical maintenance of aviation facilities and power plants. The methods used to determine the efficiency of generators include Mean Time Between Failures (MTBF), Actual Operating Time (AOT), Specified Operating Time (SOT), Probability, and Availability. The results show that the availability and average compliance of each generator can be determined through these calculations. The implication of this study is that it provides a framework for evaluating the efficiency and reliability of generators, which can be used to improve the performance of backup power sources. Highlight : Regular maintenance analysis is crucial for improving the efficiency and reliability of generators. Mean Time Between Failures (MTBF) and Actual Operating Time (AOT) are important metrics for evaluating the performance of generators. The study provides a framework for determining the availability and compliance of each generator, which can be used to improve their operational health. Keywords: generators, backup power sources, maintenance analysis, reliability, availability.
本研究旨在通过每日、每月和每年的例行维护分析,评估发电机作为备用电源的效率,以提高其可靠性、可用性和运行健康状况。这项研究是根据航空设施和发电厂电气维护相关规定进行的。用于确定发电机效率的方法包括平均故障间隔时间 (MTBF)、实际运行时间 (AOT)、规定运行时间 (SOT)、概率和可用性。结果表明,通过这些计算可以确定每台发电机的可用性和平均合规性。这项研究的意义在于,它为评估发电机的效率和可靠性提供了一个框架,可用于提高备用电源的性能。亮点:定期维护分析对提高发电机的效率和可靠性至关重要。平均故障间隔时间(MTBF)和实际运行时间(AOT)是评估发电机性能的重要指标。这项研究为确定每台发电机的可用性和合规性提供了一个框架,可用于改善其运行健康状况。 关键词: 发电机、备用电源、维护分析、可靠性、可用性。
{"title":"Periodic Maintenance Analysis of Diesel Motor Generator Set 900 kVA Power as Backup Energy","authors":"Rois Nur Rofiq Salam, E. Widodo","doi":"10.21070/pels.v7i0.1597","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1597","url":null,"abstract":"This study aims to evaluate the efficiency of generators as backup power sources through daily, monthly, and annual routine maintenance analysis to improve their reliability, availability, and operational health. The study was conducted in compliance with regulations related to electrical maintenance of aviation facilities and power plants. The methods used to determine the efficiency of generators include Mean Time Between Failures (MTBF), Actual Operating Time (AOT), Specified Operating Time (SOT), Probability, and Availability. The results show that the availability and average compliance of each generator can be determined through these calculations. The implication of this study is that it provides a framework for evaluating the efficiency and reliability of generators, which can be used to improve the performance of backup power sources. \u0000Highlight : \u0000 \u0000Regular maintenance analysis is crucial for improving the efficiency and reliability of generators. \u0000Mean Time Between Failures (MTBF) and Actual Operating Time (AOT) are important metrics for evaluating the performance of generators. \u0000The study provides a framework for determining the availability and compliance of each generator, which can be used to improve their operational health. \u0000 \u0000Keywords: generators, backup power sources, maintenance analysis, reliability, availability.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"484 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140446643","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Title In English 英文标题
Pub Date : 2024-02-20 DOI: 10.21070/pels.v7i0.1596
Akbar Rayhan Hasfi, Syamsudduha Syahrorini
Protection and maintenance of electric motors in industrial environments that are susceptible to overloading has an important role. Overloading occurs when an electric motor is used with a load exceeding its normal capacity, which can cause damage and increase the risk of fire. To overcome this problem, maintenance is needed which aims to implement and maintain the electric motor protection system. This method includes theoretical and practical sessions, where knowledge will be provided about basic protection concepts, protection system components, as well as how to organize and apply protection to electric motors. By following these directions you can improve your in- depth understanding of electric motor protection, develop skills in implementing protection systems, and gain the necessary maintenance capabilities. Positive impacts of this industrial internship include the ability to identify overload risks and implement appropriate protection systems. This not only helps optimize energy use, but also increases the company's operational efficiency and reduces damage and production disruptions. Thus, this program has a crucial role in maintaining the sustainability and operational safety of electric motors in an industrial context that is vulnerable to overloading.
在容易发生过载的工业环境中,保护和维护电动机具有重要作用。当电动机的负载超过其正常容量时,就会出现过载,从而造成损坏并增加起火的风险。为了解决这个问题,需要进行维护,目的是实施和维护电动机保护系统。该方法包括理论和实践课程,将提供有关基本保护概念、保护系统组件以及如何组织和应用电动机保护的知识。通过这些指导,您可以提高对电机保护的深入理解,培养实施保护系统的技能,并获得必要的维护能力。本工业实习的积极影响包括识别过载风险和实施适当保护系统的能力。这不仅有助于优化能源使用,还能提高公司的运营效率,减少损失和生产中断。因此,在易受过载影响的工业环境中,该计划对于维护电机的可持续性和运行安全具有至关重要的作用。
{"title":"Title In English","authors":"Akbar Rayhan Hasfi, Syamsudduha Syahrorini","doi":"10.21070/pels.v7i0.1596","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1596","url":null,"abstract":"Protection and maintenance of electric motors in industrial environments that are susceptible to overloading has an important role. Overloading occurs when an electric motor is used with a load exceeding its normal capacity, which can cause damage and increase the risk of fire. To overcome this problem, maintenance is needed which aims to implement and maintain the electric motor protection system. This method includes theoretical and practical sessions, where knowledge will be provided about basic protection concepts, protection system components, as well as how to organize and apply protection to electric motors. By following these directions you can improve your in- depth understanding of electric motor protection, develop skills in implementing protection systems, and gain the necessary maintenance capabilities. Positive impacts of this industrial internship include the ability to identify overload risks and implement appropriate protection systems. This not only helps optimize energy use, but also increases the company's operational efficiency and reduces damage and production disruptions. Thus, this program has a crucial role in maintaining the sustainability and operational safety of electric motors in an industrial context that is vulnerable to overloading.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"12 5","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139958416","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Application of the AHP Method to Assesment of Performance Levels of Production Employees of the Zenbo Division of PT. Mertex Indonesia 应用 AHP 方法评估印度尼西亚 PT.Mertex 公司 Zenbo 分部生产员工的绩效水平印度尼西亚 Mertex 公司
Pub Date : 2024-02-20 DOI: 10.21070/pels.v7i0.1594
Doni Prasetyo, Inggit Marodiyah
This research aims to address the absence of an employee performance assessment system at a company by designing and implementing a system using the Analytical Hierarchy Process (AHP) method. The goal is to support decision-making and evaluate employee productivity, ultimately maintaining high company productivity. The AHP method was utilized to determine the level of productivity of each existing employee, leading to changes in ranking positions for certain operators. The results highlight the effectiveness of the AHP-based assessment system in enhancing employee productivity and its potential implications for decision support in performance evaluation. Highlight : The research aims to design and implement an employee performance assessment system using the AHP method. The AHP method was effective in determining the level of productivity of each employee and led to changes in ranking positions for certain operators. The results highlight the potential implications of the AHP-based assessment system for decision support in performance evaluation. Keywords: employee performance assessment, Analytical Hierarchy Process (AHP), decision-making, productivity, performance evaluation
本研究旨在利用层次分析法(AHP)设计并实施一套系统,以解决公司缺乏员工绩效评估系统的问题。目的是支持决策和评估员工的生产率,最终保持公司的高生产率。利用 AHP 方法确定了每个现有员工的生产率水平,从而改变了某些操作员的排名位置。研究结果凸显了基于 AHP 的评估系统在提高员工生产率方面的有效性,及其对绩效评估决策支持的潜在影响。亮点:本研究旨在利用 AHP 方法设计和实施员工绩效评估系统。AHP 方法能有效确定每位员工的生产率水平,并导致某些操作员的排名位置发生变化。结果凸显了基于 AHP 的评估系统对绩效评估决策支持的潜在影响。 关键词:员工绩效评估、分析层次过程(AHP)、决策、生产率、绩效评估
{"title":"Application of the AHP Method to Assesment of Performance Levels of Production Employees of the Zenbo Division of PT. Mertex Indonesia","authors":"Doni Prasetyo, Inggit Marodiyah","doi":"10.21070/pels.v7i0.1594","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1594","url":null,"abstract":"This research aims to address the absence of an employee performance assessment system at a company by designing and implementing a system using the Analytical Hierarchy Process (AHP) method. The goal is to support decision-making and evaluate employee productivity, ultimately maintaining high company productivity. The AHP method was utilized to determine the level of productivity of each existing employee, leading to changes in ranking positions for certain operators. The results highlight the effectiveness of the AHP-based assessment system in enhancing employee productivity and its potential implications for decision support in performance evaluation. \u0000Highlight : \u0000 \u0000The research aims to design and implement an employee performance assessment system using the AHP method. \u0000The AHP method was effective in determining the level of productivity of each employee and led to changes in ranking positions for certain operators. \u0000The results highlight the potential implications of the AHP-based assessment system for decision support in performance evaluation. \u0000 \u0000Keywords: employee performance assessment, Analytical Hierarchy Process (AHP), decision-making, productivity, performance evaluation","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"917 ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140446251","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Procedia of Engineering and Life Science
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1