Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90039-6
H.J. Fontein, J.Groot Wassink
A new method to design heat exchangers is proposed, which is based on the process description by Kays and London and lends itself very well to optimization.
The method is described by applying it to the economic optimization of a counter-current exchanger, the extension to other flow configurations being selfexplanatory.
{"title":"The economically optimal design of heat exchangers","authors":"H.J. Fontein, J.Groot Wassink","doi":"10.1016/0377-841X(78)90039-6","DOIUrl":"10.1016/0377-841X(78)90039-6","url":null,"abstract":"<div><p>A new method to design heat exchangers is proposed, which is based on the process description by Kays and London and lends itself very well to optimization.</p><p>The method is described by applying it to the economic optimization of a counter-current exchanger, the extension to other flow configurations being selfexplanatory.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 141-149"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90039-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77770546","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90035-9
R. Scott
Recent increases in costs and continuing inflation have increased working capital requirements beyond the levels commonly referred to in engineering literature. Estimating working capital by reference to fixed capital is no longer tenable. This paper describes an improved estimating method based on categorising the hold-up at six stages during manufacture, distribution and sale using approximate costs. The result is expressed in terms of annual sales value.
For products made and sold in U.K., minimum working capital requirements vary between £ 12 and £ 35 for £ 100 of annual sales according to the nature of the product and process. Values may exceed £ 60 for other markets. Results agree well with company published balance sheets.
The method improves the accuracy of project evaluation where errors in estimating working capital can be as significant as those in fixed capital costs. Some design aspects are listed where engineers may be able to reduce working capital or to optimise it against overall cost.
{"title":"Working capital and its estimation for project evaluation","authors":"R. Scott","doi":"10.1016/0377-841X(78)90035-9","DOIUrl":"10.1016/0377-841X(78)90035-9","url":null,"abstract":"<div><p>Recent increases in costs and continuing inflation have increased working capital requirements beyond the levels commonly referred to in engineering literature. Estimating working capital by reference to fixed capital is no longer tenable. This paper describes an improved estimating method based on categorising the hold-up at six stages during manufacture, distribution and sale using approximate costs. The result is expressed in terms of annual sales value.</p><p>For products made and sold in U.K., minimum working capital requirements vary between £ 12 and £ 35 for £ 100 of annual sales according to the nature of the product and process. Values may exceed £ 60 for other markets. Results agree well with company published balance sheets.</p><p>The method improves the accuracy of project evaluation where errors in estimating working capital can be as significant as those in fixed capital costs. Some design aspects are listed where engineers may be able to reduce working capital or to optimise it against overall cost.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 105-114"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90035-9","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81824280","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90041-4
A. Foord
{"title":"Practical business models","authors":"A. Foord","doi":"10.1016/0377-841X(78)90041-4","DOIUrl":"10.1016/0377-841X(78)90041-4","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 151-152"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90041-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75907783","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90046-3
{"title":"Engineering and process economics","authors":"","doi":"10.1016/0377-841X(78)90046-3","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90046-3","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Page 162"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90046-3","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"136483275","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90044-X
{"title":"Diary of events","authors":"","doi":"10.1016/0377-841X(78)90044-X","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90044-X","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 155-157"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90044-X","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137006235","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90043-8
M.V. Nott
{"title":"Developments in economic geology series, vol. 3. world mineral supplies: assessment and perspectives","authors":"M.V. Nott","doi":"10.1016/0377-841X(78)90043-8","DOIUrl":"10.1016/0377-841X(78)90043-8","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 153-154"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90043-8","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78314910","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-03-01DOI: 10.1016/0377-841X(78)90034-7
John Cran
{"title":"EPE plant cost indices international","authors":"John Cran","doi":"10.1016/0377-841X(78)90034-7","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90034-7","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 2","pages":"Pages 103-104"},"PeriodicalIF":0.0,"publicationDate":"1978-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90034-7","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"136468544","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-01-01DOI: 10.1016/0377-841X(78)90053-0
David C. Wilson, David C. Wilson
The decision to implement a resource recovery system as a method of solid waste disposal must be based on a sound economic evaluation of alternatives. Such evaluation is currently hindered by a lack of comparability between independent cost estimates. This is due both to the use of diverse estimation procedures and to the different assumptions made about the resource recovery systems. From a critical assessment of current practices and potential pitfalls in cost and revenue estimation, conventions are proposed to serve as a guide for future work.
{"title":"The economics of resource recovery from solid waste","authors":"David C. Wilson, David C. Wilson","doi":"10.1016/0377-841X(78)90053-0","DOIUrl":"10.1016/0377-841X(78)90053-0","url":null,"abstract":"<div><p>The decision to implement a resource recovery system as a method of solid waste disposal must be based on a sound economic evaluation of alternatives. Such evaluation is currently hindered by a lack of comparability between independent cost estimates. This is due both to the use of diverse estimation procedures and to the different assumptions made about the resource recovery systems. From a critical assessment of current practices and potential pitfalls in cost and revenue estimation, conventions are proposed to serve as a guide for future work.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 1","pages":"Pages 35-59"},"PeriodicalIF":0.0,"publicationDate":"1978-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90053-0","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79468945","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 1978-01-01DOI: 10.1016/0377-841X(78)90048-7
John Cran
{"title":"EPE plant cost indices international","authors":"John Cran","doi":"10.1016/0377-841X(78)90048-7","DOIUrl":"https://doi.org/10.1016/0377-841X(78)90048-7","url":null,"abstract":"","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 1","pages":"Pages 1-2"},"PeriodicalIF":0.0,"publicationDate":"1978-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90048-7","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"137408582","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}