首页 > 最新文献

Métier : responsable bureau d’étude/conception最新文献

英文 中文
Estimer les coûts 估计成本
Pub Date : 2020-10-01 DOI: 10.51257/f-1697
Jean-Pierre Payre
{"title":"Estimer les coûts","authors":"Jean-Pierre Payre","doi":"10.51257/f-1697","DOIUrl":"https://doi.org/10.51257/f-1697","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"4 6","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"120821233","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
L'organigramme des tâches OT ou WBS OT或WBS任务的流程图
Pub Date : 2020-10-01 DOI: 10.51257/f-1698
Jean-Pierre Payre
{"title":"L'organigramme des tâches OT ou WBS","authors":"Jean-Pierre Payre","doi":"10.51257/f-1698","DOIUrl":"https://doi.org/10.51257/f-1698","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125575138","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La courbe en S 当然是
Pub Date : 2020-10-01 DOI: 10.51257/f-1688
Jean-Pierre Payre
{"title":"La courbe en S","authors":"Jean-Pierre Payre","doi":"10.51257/f-1688","DOIUrl":"https://doi.org/10.51257/f-1688","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116516081","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Les parties prenantes et le management du projet 涉众和项目管理
Pub Date : 2020-08-01 DOI: 10.51257/f-1696
Jean-Pierre Payre
{"title":"Les parties prenantes et le management du projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1696","DOIUrl":"https://doi.org/10.51257/f-1696","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"65 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125130464","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le contrat et ses spécificités 合同及其细节
Pub Date : 2020-08-01 DOI: 10.51257/f-1686
Jean-Pierre Payre
{"title":"Le contrat et ses spécificités","authors":"Jean-Pierre Payre","doi":"10.51257/f-1686","DOIUrl":"https://doi.org/10.51257/f-1686","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"138 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133764227","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La fonction contract manager 职能合同经理
Pub Date : 2020-08-01 DOI: 10.51257/f-1685
J. Payre
{"title":"La fonction contract manager","authors":"J. Payre","doi":"10.51257/f-1685","DOIUrl":"https://doi.org/10.51257/f-1685","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"89 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130849047","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
L’élaboration du planning projet 制定项目计划
Pub Date : 2020-08-01 DOI: 10.51257/f-1687
Jean-Pierre Payre
{"title":"L’élaboration du planning projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1687","DOIUrl":"https://doi.org/10.51257/f-1687","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115583943","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le management visuel Le管理可视化
Pub Date : 2020-08-01 DOI: 10.51257/f-1695
Jean-Pierre Payre
{"title":"Le management visuel","authors":"Jean-Pierre Payre","doi":"10.51257/f-1695","DOIUrl":"https://doi.org/10.51257/f-1695","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114230775","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le cycle complet du projet 整个项目周期
Pub Date : 2020-05-26 DOI: 10.51257/f-1682
Jean-Pierre Payre
Le cycle du projet debute par une phase d’offre et de negociation commerciale avec le client, bien souvent de clarifications pour aboutir a la selection d’un fournisseur et un contrat qui demarre la phase d’execution du projet. Cette fiche a pour objectif de decrire ce cycle et les differentes etapes associees. L’entreprise met en place des ressources ciblees pour manager ces phases successives.
项目周期从报价和与客户的商业谈判阶段开始,通常是澄清,最终选择供应商和合同,开始项目的执行阶段。这张卡片的目的是描述这个循环和相关的各个阶段。公司建立有针对性的资源来管理这些连续的阶段。
{"title":"Le cycle complet du projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1682","DOIUrl":"https://doi.org/10.51257/f-1682","url":null,"abstract":"Le cycle du projet debute par une phase d’offre et de negociation commerciale avec le client, bien souvent de clarifications pour aboutir a la selection d’un fournisseur et un contrat qui demarre la phase d’execution du projet. Cette fiche a pour objectif de decrire ce cycle et les differentes etapes associees. L’entreprise met en place des ressources ciblees pour manager ces phases successives.","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"100 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134278445","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La fonction de site manager dans les projets 项目中的站点经理功能
Pub Date : 2020-05-26 DOI: 10.51257/f-1684
Jean-Pierre Payre
Dans un grand projet, les activites qui se deroulent sur le site client, tant pour la construction que pour la mise en service, necessitent un management local fort, expose directement au client et ses representants locaux et pilotant la base avancee de l’entreprise. C’est le role du site manager, bras droit du directeur de projet qui intervient sur le site des les premieres activites, prenant le relais du preparateur site qui, en amont, a securise la preparation des activites site avant la nomination du site manager et l’ouverture du site. Le preparateur site assiste pendant les travaux le site manager. Le site manager represente l’entreprise sur le site client et devant les autorites locales.
在一个大型项目中,在客户现场进行的活动,无论是施工还是调试,都需要强有力的当地管理,直接接触客户及其当地代表,并推动公司的先进基础。这是现场经理的角色,他是项目经理的得力助手,负责第一次活动的现场,接替现场准备人员,后者在现场经理任命和现场开放之前确保现场活动的准备工作。现场准备人员协助现场经理进行工作。现场经理代表公司在客户现场和地方当局面前。
{"title":"La fonction de site manager dans les projets","authors":"Jean-Pierre Payre","doi":"10.51257/f-1684","DOIUrl":"https://doi.org/10.51257/f-1684","url":null,"abstract":"Dans un grand projet, les activites qui se deroulent sur le site client, tant pour la construction que pour la mise en service, necessitent un management local fort, expose directement au client et ses representants locaux et pilotant la base avancee de l’entreprise. C’est le role du site manager, bras droit du directeur de projet qui intervient sur le site des les premieres activites, prenant le relais du preparateur site qui, en amont, a securise la preparation des activites site avant la nomination du site manager et l’ouverture du site. Le preparateur site assiste pendant les travaux le site manager. Le site manager represente l’entreprise sur le site client et devant les autorites locales.","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"65 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121919419","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Métier : responsable bureau d’étude/conception
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1