首页 > 最新文献

Journal of Green Science and Technology最新文献

英文 中文
CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL 苹果医院建设管理分析
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v3i1.2149
Z. Hakim, Saihul Anwar
Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life. Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeks Keyword: Project Management, Bar Chart, S Curve, Critical Path Method. Construction Management Analysis Of Cideres Hospital Journal of Green Science and Technology, Vol. III, No. 1, January 2019 | 174
可靠的基础设施需要从规划、结构、施工、运营和维护阶段到使用寿命结束的有效和高效的管理。良好的民用基础设施管理不仅可以节省资金,还可以合理利用自然资源,从而确保生态的可持续性。施工管理是土木工程科学的一部分,重点是对建筑工程项目进行管理,以实现土木工程科学其他部分产生的技术概念和设计。建筑管理的目的是建立建成的物理设施或基础设施,需要支持人类的生活。建筑项目的管理正变得越来越复杂,因为其中有许多相互作用的各方,对功能、舒适、安全、美观和可持续性的质量要求越来越高。因此,施工管理需要保证施工项目的效率和生产力,以满足各种期望和要求。本文的分析包括体积计算,劳动力,材料和设备的需求,条形图,现金流,S曲线,关键路径法(CPM)是一种识别关键工作路径或项目的方法。向前计算,向后计算,自由浮动和总浮动。根据现金流量计算,完成Kadipaten Dawuan Majalengka项目建设至最后阶段的费用约为90.34亿卢比。这些费用分为两部分,结构和建筑工程,结构的费用为3,64,000,000卢比,建筑的费用为5,390,000,000卢比。从CPM进度分析计算可知,Cideres医院项目开发时间为45周。关键词:项目管理,柱状图,S曲线,关键路径法。《绿色科技杂志》第三卷第1期2019年1月| 174
{"title":"CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL","authors":"Z. Hakim, Saihul Anwar","doi":"10.33603/jgst.v3i1.2149","DOIUrl":"https://doi.org/10.33603/jgst.v3i1.2149","url":null,"abstract":"Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life. Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeks Keyword: Project Management, Bar Chart, S Curve, Critical Path Method. Construction Management Analysis Of Cideres Hospital Journal of Green Science and Technology, Vol. III, No. 1, January 2019 | 174","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126787368","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
COMPARISON OF BORED PILE AXIAL BEARING CAPACITY BASED ON VESIC’S METHOD (1970), STANDARD PENETRATION TEST (SPT), AND LOADING TEST IN THE PROJECT OF ELEVATED TOLL ROAD JAKARTA – CIKAMPEK STA.9+500 – STA.47+000 基于vesic<s:2>方法(1970)、标准贯入试验(spt)和加载试验的雅加达- cikampek sta.9 +500 <e:1> - sta.47 +000高架收费公路工程钻孔桩轴向承载力比较
Pub Date : 2019-04-08 DOI: 10.33603/JGST.V2I3.2147
Sofyan Suri, Martinus Agus Sugianto
As a foundation under the structure can be generally divided into two types, namely the foundation deep and shallow foundation. Selection of the type of foundation depends on the type of structure including the construction load on whether light or heavy loads and also depending on the soil type. For the construction of a light load and soil conditions quite well, usually worn shallow foundation, but the construction of a heavy load is usually the type of deep foundation is the right choice. In general, the more complex the deep foundation of a shallow foundation. To this writer tried to concentrate on planning the foundation of this thesis in which bored pile (Bored Pile Foundations). Bored Pile foundation is a foundation built by drilling the ground first, then filled with steel reinforcement and cast. Bored pile used when soil solid base which has a carrying capacity of it lies very deep, which is approximately 15 m as well as the state of the soil around the many stands a large building and rise to the feared could lead to cracks in the existing building effect vibrations caused by staking activity when administered pile foundation. Carrying capacity of bored pile end bearing capacity is obtained than that obtained from pressure and friction pile tip bearing capacity obtained from carrying friction or adhesion force between the bored pile and the surrounding soil. K e yword :Bored Pile, Axial Bearing Capacity, SPT, Loading Test
作为基础下的结构一般可分为两种类型,即深基础和浅基础。基础类型的选择取决于结构类型,包括建筑荷载,是轻荷载还是重荷载,还取决于土壤类型。对于轻荷载和土质条件相当好的施工,通常磨损浅基础,但施工重荷载通常是深基础的正确选择。一般来说,深基础越复杂,浅基础越好。笔者试图以此为重点来规划本论文的基础,其中钻孔灌注桩(bored pile Foundations)。钻孔灌注桩基础是先在地基上钻孔,再填充钢筋,浇筑而成的基础。钻孔灌注桩使用时,其承载能力的地基是坚实的,它位于非常深的地方,大约是15米,而且周围的土体状态多,并且上升到担心会导致既有建筑物的裂缝效应,引起桩活动时桩基础的震动。钻孔灌注桩的端部承载力比压力和摩擦桩的端部承载力要大得多。关键词:钻孔灌注桩;轴向承载力;SPT
{"title":"COMPARISON OF BORED PILE AXIAL BEARING CAPACITY BASED ON VESIC’S METHOD (1970), STANDARD PENETRATION TEST (SPT), AND LOADING TEST IN THE PROJECT OF ELEVATED TOLL ROAD JAKARTA – CIKAMPEK STA.9+500 – STA.47+000","authors":"Sofyan Suri, Martinus Agus Sugianto","doi":"10.33603/JGST.V2I3.2147","DOIUrl":"https://doi.org/10.33603/JGST.V2I3.2147","url":null,"abstract":"As a foundation under the structure can be generally divided into two types, namely the foundation deep and shallow foundation. Selection of the type of foundation depends on the type of structure including the construction load on whether light or heavy loads and also depending on the soil type. For the construction of a light load and soil conditions quite well, usually worn shallow foundation, but the construction of a heavy load is usually the type of deep foundation is the right choice. In general, the more complex the deep foundation of a shallow foundation. To this writer tried to concentrate on planning the foundation of this thesis in which bored pile (Bored Pile Foundations). Bored Pile foundation is a foundation built by drilling the ground first, then filled with steel reinforcement and cast. Bored pile used when soil solid base which has a carrying capacity of it lies very deep, which is approximately 15 m as well as the state of the soil around the many stands a large building and rise to the feared could lead to cracks in the existing building effect vibrations caused by staking activity when administered pile foundation. Carrying capacity of bored pile end bearing capacity is obtained than that obtained from pressure and friction pile tip bearing capacity obtained from carrying friction or adhesion force between the bored pile and the surrounding soil. K e yword :Bored Pile, Axial Bearing Capacity, SPT, Loading Test","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"75 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114850767","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS STRUCTURE OF BUILDING LOCAL GOVERNMENT 2 KARAWANG WITH CONCRETE STRUCTURE 卡拉旺地方政府二期混凝土结构建筑结构分析
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v2i3.2143
Rio Supriyatna, Ari Firmanto
Desire to have a local government of Karawang office is quite  magnificent service complete with adequate facilities that can support a variety of work activities of Government Officials and employees, it is the hope of the ideal and coveted by all circles. However, of course, in realizing a high desire that must be supported by substantial costs sourced from local revenue sources that in fact the people's money too, would be comparable and parallel with the level of service to thecommunity. However, fears as above hopefully not happen because the purpose 5th floor of building local government 2 Karawang certainly has a good purpose for increased imagery and public services for the people in the city's mayor. Thus will be realized an order of life is getting better with the presence of a complete service of policy makers in the Karawang City, which in turn will encourage improvements in the economy of the community. The building local government 2 using concrete structure. On the basis of the criteria safety and excellent service then loading the planning process should be in accordance with SNI-1727-2013 as well as the structural design of the building should refer to SNI-2847-2013 specification for structural steel buildings, other than that in the calculation of earthquake engineering should also refer to the SNI-1726-2012. Keyword : Analysis structure, Etabs, frame section, deflection .
渴望拥有一个卡拉旺地方政府办公室是相当宏伟的,服务齐全,设施齐全,可以支持各种工作活动的政府官员和员工,这是理想的希望和各界梦寐以求的。然而,当然,在实现高愿望的过程中,必须由当地收入来源(实际上也是人民的钱)的大量成本来支持,这将与对社区的服务水平相当并平行。然而,上述担忧希望不会发生,因为卡拉旺地方政府5楼的目的当然是为了增加形象和为市长提供公共服务。因此,随着卡拉旺市决策者的全面服务的出现,生活秩序将变得更好,这反过来将鼓励社区经济的改善。当地政府大楼2号采用混凝土结构。在安全性和优良服务的基础上,荷载规划过程应按照SNI-1727-2013以及建筑结构设计应参照SNI-2847-2013钢结构建筑规范,除此之外在抗震工程计算中还应参照SNI-1726-2012。关键词:结构分析,Etabs,框架截面,挠度
{"title":"ANALYSIS STRUCTURE OF BUILDING LOCAL GOVERNMENT 2 KARAWANG WITH CONCRETE STRUCTURE","authors":"Rio Supriyatna, Ari Firmanto","doi":"10.33603/jgst.v2i3.2143","DOIUrl":"https://doi.org/10.33603/jgst.v2i3.2143","url":null,"abstract":"Desire to have a local government of Karawang office is quite  magnificent service complete with adequate facilities that can support a variety of work activities of Government Officials and employees, it is the hope of the ideal and coveted by all circles. However, of course, in realizing a high desire that must be supported by substantial costs sourced from local revenue sources that in fact the people's money too, would be comparable and parallel with the level of service to thecommunity. However, fears as above hopefully not happen because the purpose 5th floor of building local government 2 Karawang certainly has a good purpose for increased imagery and public services for the people in the city's mayor. Thus will be realized an order of life is getting better with the presence of a complete service of policy makers in the Karawang City, which in turn will encourage improvements in the economy of the community. The building local government 2 using concrete structure. On the basis of the criteria safety and excellent service then loading the planning process should be in accordance with SNI-1727-2013 as well as the structural design of the building should refer to SNI-2847-2013 specification for structural steel buildings, other than that in the calculation of earthquake engineering should also refer to the SNI-1726-2012. Keyword : Analysis structure, Etabs, frame section, deflection .","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125384321","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA 爪哇中部法城家乐福的项目管理分析
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v2i3.2142
Septi Dwi N.I.S, Saihul Anwar
{"title":"ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA","authors":"Septi Dwi N.I.S, Saihul Anwar","doi":"10.33603/jgst.v2i3.2142","DOIUrl":"https://doi.org/10.33603/jgst.v2i3.2142","url":null,"abstract":"","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"93 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133623498","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF THE SALAMDARMA IRRIGATION AREA PERFORMANCE 菱鲆灌区性能分析
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v3i1.2150
Oky Fajar Rochman, Saihul Anwar
{"title":"ANALYSIS OF THE SALAMDARMA IRRIGATION AREA PERFORMANCE","authors":"Oky Fajar Rochman, Saihul Anwar","doi":"10.33603/jgst.v3i1.2150","DOIUrl":"https://doi.org/10.33603/jgst.v3i1.2150","url":null,"abstract":"","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133274592","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
DESIGN UPPER STRUCTURE OF THE RIVER BAKI BRIDGE USES A STEEL FRAME 巴基河大桥上部结构设计采用钢框架
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v2i3.2146
Tasliyatul Fuadiyah, D. Enda, I. Puluhulawa
In general, the bridge type is a reinforced concrete bridge, composite and steel frame. The Baki River Bridge was originally a 40 m long Wood type bridge connecting the village of Mengkopot Tanjung Pisang because the condition of the Baki river bridge has been damaged especially on bridge floors and girders due to age, so it is planned to re-use the steel frame bridge structure. By using the steel bridge structure, it is expected that later it can be a comparison for the future bridge planning. In this study, the structure of the planned bridge consists of bridge slabs, sidewalk slabs, backrest pipes, longitudinal and transverse girders, steel frames, wind ties, and joints. By following the SNI T-02-2005 bridge loading standard, SNI T-03-2005 for planning steel bridge structures and SNI T-12-2004 for planning concrete structures on bridges. From the planning results obtained thickness 200 mm Bridge Slab and thick sidewalk slab 250 mm with a longitudinal girder profile used WF 600.200.11.17 mm steel with a distance between girders 1.75 m. Transverse girders of steel profiles WF 700,300.13.24 are used with the distance between girders 5 m. Used Steel profiles WF 400,400.13.21 as Main Frame and Steel WF profile 150.150.7.10 as profiles for wind ties.
一般来说,桥梁类型是钢筋混凝土桥、组合式和钢框架桥。巴基河大桥原本是一座40米长的木桥,连接Mengkopot Tanjung Pisang村,因为巴基河大桥的状况已经受损,特别是桥面和大梁,因此计划重新使用钢框架桥梁结构。通过采用钢桥结构,期望以后可以为今后的桥梁规划提供参考。在本研究中,规划桥梁的结构由桥板、人行道板、靠背管、纵、横梁、钢框架、风系、接缝组成。参照SNI T-02-2005桥梁荷载标准、SNI T-03-2005钢桥结构规划标准和SNI T-12-2004桥梁混凝土结构规划标准。从规划结果中得到厚度为200 mm的桥板和厚为250 mm的人行道板,纵梁剖面采用WF 600.200.11.17 mm钢,梁与梁之间的距离为1.75 m。横梁采用wf700,300.13.24型钢,梁间距离为5m。主框架采用WF 400,400.13.21钢型材,风扎采用WF 150.150.7.10钢型材。
{"title":"DESIGN UPPER STRUCTURE OF THE RIVER BAKI BRIDGE USES A STEEL FRAME","authors":"Tasliyatul Fuadiyah, D. Enda, I. Puluhulawa","doi":"10.33603/jgst.v2i3.2146","DOIUrl":"https://doi.org/10.33603/jgst.v2i3.2146","url":null,"abstract":"In general, the bridge type is a reinforced concrete bridge, composite and steel frame. The Baki River Bridge was originally a 40 m long Wood type bridge connecting the village of Mengkopot Tanjung Pisang because the condition of the Baki river bridge has been damaged especially on bridge floors and girders due to age, so it is planned to re-use the steel frame bridge structure. By using the steel bridge structure, it is expected that later it can be a comparison for the future bridge planning. In this study, the structure of the planned bridge consists of bridge slabs, sidewalk slabs, backrest pipes, longitudinal and transverse girders, steel frames, wind ties, and joints. By following the SNI T-02-2005 bridge loading standard, SNI T-03-2005 for planning steel bridge structures and SNI T-12-2004 for planning concrete structures on bridges. From the planning results obtained thickness 200 mm Bridge Slab and thick sidewalk slab 250 mm with a longitudinal girder profile used WF 600.200.11.17 mm steel with a distance between girders 1.75 m. Transverse girders of steel profiles WF 700,300.13.24 are used with the distance between girders 5 m. Used Steel profiles WF 400,400.13.21 as Main Frame and Steel WF profile 150.150.7.10 as profiles for wind ties.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114043527","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PLANNING AND ANALYSIS YOGYA TEGAL TOSERBA STRUCTURE 规划和分析瑜伽的法律结构
Pub Date : 2019-04-08 DOI: 10.33603/jgst.v3i1.2148
G. H. Wibowo, Tira Roesdiana
The strategic geographical location of Tegal City supports the development of business and services. YOGYA Group is a Supermaket and Department Store company. In building construction there is a structural analysis that is used as a method or system to achieve development as planned. The method used in this research is qualitative method. Literature method by collecting data, studying and identifying.Observation method by conducting a survey to the research location. Adhering to the guidelines of SNI 2847: 2013 (Requirements for structural concrete for buildings), SNI 1727: 2013 (Minimum load for building design and other structures), Guidelines for house planning and building loading (PPURG 1987) and SNI 1726: 2012 (earthquake resistance planning procedures for buildings and nonbuilding structures). This analysis obtained a result of dimension data and the number of beam reinforcement, column, plate and the number of pile needs for the YogyaTegal department store building. Keyword : Analysis, Building, Concrete, SNI, Strategic Planning And Analysis Yogya Tegal Toserba Structure Journal of Green Science and Technology, Vol. III, No. 1, January 2019 | 162
法城的战略地理位置支持商业和服务业的发展。YOGYA集团是一家超市和百货公司。在建筑施工中,有一种结构分析,它被用作一种方法或系统,以实现按计划的开发。本研究采用的方法是定性方法。文献法通过收集资料、研究、鉴定。观察法通过对研究地点进行调查。遵守SNI 2847: 2013(建筑结构混凝土要求)、SNI 1727: 2013(建筑设计和其他结构的最小荷载)、房屋规划和建筑荷载指南(PPURG 1987)和SNI 1726: 2012(建筑和非建筑结构的抗震规划程序)的指导方针。通过分析,得到了优格百货大楼所需的尺寸数据和梁配筋数量、柱数量、板数量和桩数量。关键词:分析,建筑,混凝土,SNI,战略规划与分析Yogya legal Toserba结构绿色科技学报,第三卷,第1期,2019年1月| 162
{"title":"PLANNING AND ANALYSIS YOGYA TEGAL TOSERBA STRUCTURE","authors":"G. H. Wibowo, Tira Roesdiana","doi":"10.33603/jgst.v3i1.2148","DOIUrl":"https://doi.org/10.33603/jgst.v3i1.2148","url":null,"abstract":"The strategic geographical location of Tegal City supports the development of business and services. YOGYA Group is a Supermaket and Department Store company. In building construction there is a structural analysis that is used as a method or system to achieve development as planned. The method used in this research is qualitative method. Literature method by collecting data, studying and identifying.Observation method by conducting a survey to the research location. Adhering to the guidelines of SNI 2847: 2013 (Requirements for structural concrete for buildings), SNI 1727: 2013 (Minimum load for building design and other structures), Guidelines for house planning and building loading (PPURG 1987) and SNI 1726: 2012 (earthquake resistance planning procedures for buildings and nonbuilding structures). This analysis obtained a result of dimension data and the number of beam reinforcement, column, plate and the number of pile needs for the YogyaTegal department store building. Keyword : Analysis, Building, Concrete, SNI, Strategic Planning And Analysis Yogya Tegal Toserba Structure Journal of Green Science and Technology, Vol. III, No. 1, January 2019 | 162","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122414822","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA 雅加达法轮城公寓建设项目开发的施工管理分析
Pub Date : 2018-06-29 DOI: 10.33603/JGST.V2I2.1288
Akhmad Jamaludin, Saihul Anwar, Bukhori Bukhori
Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office) Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods. Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats. This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research. With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549 Keywords :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)
Tegal Alur DKI雅加达KSO开发项目的位置。威卡和CAKRA在Lingkungan III legal Alur West Jakarta坐标Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)项目管理是一种尝试,旨在高效、有效地利用有限的资源,并按时完成预定/计划的项目。项目管理的基本职能有三个活动,即计划、实施和控制。在这三种活动中,一个项目的可控资源包括人力、设备、材料、资金和方法。雅加达TegalAlur DKI雅加达项目开发项目施工管理分析包括工作实施方法分析、雅加达TegalAlur DKI雅加达开发项目的体量计算和预算计划、TegalAlur DKI雅加达花屋项目的进度编制、TegalAlur DKI雅加达公寓开发项目的现金流分析。本研究方法由几个主要阶段组成,即准备调查和确定领域,在相关机构和部门寻找完成论文准备所需数据的一手和二手数据,对通过识别问题获得的数据进行分析并制定,从研究结果中得出结论和建议。雅加达平面开发项目TegalAlur DKI雅加达的预算计划成本和工作量计算结果表明,使用CPM调度方法,工作时间计划需要231天,估计成本为Rp. 36.690.228.549关键词:项目管理,条形图,曲线S, CPM(关键路径法)
{"title":"ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA","authors":"Akhmad Jamaludin, Saihul Anwar, Bukhori Bukhori","doi":"10.33603/JGST.V2I2.1288","DOIUrl":"https://doi.org/10.33603/JGST.V2I2.1288","url":null,"abstract":"Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office) Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods. Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats. This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research. With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549 Keywords :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126139948","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA 南雅加达合法街开发项目公寓施工管理分析
Pub Date : 2018-06-29 DOI: 10.33603/JGST.V2I2.1286
Cepi Maulana, Saihul Anwar
Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM ( Critical Path Method ) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
项目管理是所有的计划,实施,控制和协调一个项目从早期(想法)到项目结束,以确保项目适当的时间,金钱和质量。选择方法调度项目也是一个很重要的注意事项,以获得符合原计划的结果。本文具体论述了如何对南雅加达的一所公寓进行项目管理规划。这项研究是通过实地调查和文献研究的方式进行的。本文的分析包括体积计算,劳动力,材料和设备的需求,条形图,现金流,S曲线,关键路径法(CPM)是一种识别关键工作路径或项目的方法。向前计算,向后计算,自由浮动和总浮动。关键词:项目管理,条形图,S曲线,关键路径法。
{"title":"ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA","authors":"Cepi Maulana, Saihul Anwar","doi":"10.33603/JGST.V2I2.1286","DOIUrl":"https://doi.org/10.33603/JGST.V2I2.1286","url":null,"abstract":"Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM ( Critical Path Method ) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"2012 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114752801","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF PLANNING CONSTRUCTION MAIN ROAD DEVELOPMENT PLTU TANJUNG JATI A 丹戎加提主要道路发展规划建设分析
Pub Date : 2018-06-29 DOI: 10.33603/jgst.v2i2.1287
Tubagus CiptaPerdana Harta, Martinus Agus Sugianto
Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality. The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method. Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.
目前正在实施的丹戎加提蒸汽电厂主干道建设还没有铺装结构,由于道路平均日交通量(LHR)并不多,笔者在考虑车辆荷载重复系数的情况下,通过分析刚性铺装厚度规划来确定研究对象。本研究除了对路面厚度规划进行分析外,还将分析唐戎加提PLTU道路施工的施工管理是否高效、有效、有质量。本研究采用的方法是以二次数据为主的定性方法、车辆荷载重复分析、刚性路面厚度分析、体积计算分析、成本分析、条形图法、S曲线法和关键路径法。关键词:高速公路,刚性路面,混凝土路面,项目管理,条形图法,S曲线,CPM
{"title":"ANALYSIS OF PLANNING CONSTRUCTION MAIN ROAD DEVELOPMENT PLTU TANJUNG JATI A","authors":"Tubagus CiptaPerdana Harta, Martinus Agus Sugianto","doi":"10.33603/jgst.v2i2.1287","DOIUrl":"https://doi.org/10.33603/jgst.v2i2.1287","url":null,"abstract":"Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality. The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method. Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133011915","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Journal of Green Science and Technology
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1