首页 > 最新文献

Organization Technology and Management in Construction最新文献

英文 中文
Optimization of shoring/reshoring levels in high-rise building construction 高层建筑施工中支撑/回支撑水平的优化
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-10-01 DOI: 10.2478/otmcj-2018-0009
Prachi Sohoni, Abdul Ghaffar, V. Matsagar, K. N. Jha
Abstract Formwork system is a significant constituent and a basic requirement for high-rise cast-in-place reinforced concrete buildings. Usually, the builders are confronted with the decision to choose the safe, optimum number of levels of shores/reshores for a predetermined safety factor and given grade of concrete, giving due consideration to the cost of formwork system. In this study, MATLAB program is developed to calculate the load distribution between the interconnected slabs and levels of shore/reshore of a slab formwork based on a simplified method. This program is further modified by incorporating genetic algorithm for the optimization of cost of construction for high-rise building. The cost of level of shores and reshores per floor is defined as a function of cycle time which directly reflects the increase in the cost of construction. Various combinations of shore and reshore levels with several grades of concrete for various safety factors are checked to minimize the cost of construction. The optimization equation is solved using genetic algorithm considering appropriate constraints to practically ensure feasible solutions. The case of one level of shores and numerous levels of reshores is better than one level of reshores and numerous levels of shores. The result of certain combination of shore and reshore levels is not the same when the level numbers are reversed. A comparative study is carried out to check the optimum cost for various safety factors. The program is useful for the designers to decide the levels of shores and reshores with minimized cost without compromising the safety of construction.
摘要模板体系是高层现浇钢筋混凝土建筑的重要组成部分和基本要求。通常,建筑商面临的决定是,在适当考虑模板系统成本的情况下,为预先确定的安全系数和给定的混凝土等级选择安全、最佳的支撑/再浇筑水平。在这项研究中,开发了MATLAB程序,以基于简化方法计算互连板和板模板的海岸/再海岸水平之间的载荷分布。结合遗传算法对该程序进行了进一步的改进,用于高层建筑施工成本的优化。每层海岸和再矿石的水平成本被定义为周期时间的函数,周期时间直接反映了施工成本的增加。为了最大限度地降低施工成本,对不同安全系数的海岸和重砂水平与不同等级混凝土的各种组合进行了检查。在考虑适当约束的情况下,使用遗传算法求解优化方程,以实际确保可行的解。一级海岸和多级再矿石的情况比一级再矿石和多级海岸要好。当水位数字颠倒时,岸水位和再水位的某些组合的结果是不一样的。进行了比较研究,以检查各种安全因素的最佳成本。该程序有助于设计师在不影响施工安全的情况下,以最低成本决定海岸和再矿石的水平。
{"title":"Optimization of shoring/reshoring levels in high-rise building construction","authors":"Prachi Sohoni, Abdul Ghaffar, V. Matsagar, K. N. Jha","doi":"10.2478/otmcj-2018-0009","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0009","url":null,"abstract":"Abstract Formwork system is a significant constituent and a basic requirement for high-rise cast-in-place reinforced concrete buildings. Usually, the builders are confronted with the decision to choose the safe, optimum number of levels of shores/reshores for a predetermined safety factor and given grade of concrete, giving due consideration to the cost of formwork system. In this study, MATLAB program is developed to calculate the load distribution between the interconnected slabs and levels of shore/reshore of a slab formwork based on a simplified method. This program is further modified by incorporating genetic algorithm for the optimization of cost of construction for high-rise building. The cost of level of shores and reshores per floor is defined as a function of cycle time which directly reflects the increase in the cost of construction. Various combinations of shore and reshore levels with several grades of concrete for various safety factors are checked to minimize the cost of construction. The optimization equation is solved using genetic algorithm considering appropriate constraints to practically ensure feasible solutions. The case of one level of shores and numerous levels of reshores is better than one level of reshores and numerous levels of shores. The result of certain combination of shore and reshore levels is not the same when the level numbers are reversed. A comparative study is carried out to check the optimum cost for various safety factors. The program is useful for the designers to decide the levels of shores and reshores with minimized cost without compromising the safety of construction.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1803 - 1826"},"PeriodicalIF":2.1,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43380740","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Analysis of rework risk triggers in the Nigerian construction industry 尼日利亚建筑业返工风险触发因素分析
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-08-01 DOI: 10.2478/otmcj-2018-0008
E. Eze, J. E. Idiake, B. O. Ganiyu
Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes.
摘要建筑业在许多国家的基础设施发展中发挥着重要作用。尽管技术和专业水平都很先进,但建筑项目却遭遇了很多挫折。因此,这项研究评估了尼日利亚建筑业中引发返工的因素以及消除此类因素所带来的好处。该研究采用了定量调查方法,采用结构化问卷作为研究工具。采用主成分分析法进行因素分析,以确定引发返工的因素以及这些因素之间存在的关系模式;相对重要性指数(RII)用于评估消除返工触发因素的益处。该研究得出结论,引发返工的因素包括遗漏和规划问题、变更问题、资金和沟通问题,以及工人和资源控制不力。重复光顾,提高生产力,缩短交货时间,减少返工和浪费,提高员工工作满意度和士气;它们是从消除返工触发因素中获得的好处。建议在设计阶段,项目参与者以及承包商、分包商和其他利益相关者之间需要明确、有效和及时的指示和信息传播,以避免遗漏和施工变更。
{"title":"Analysis of rework risk triggers in the Nigerian construction industry","authors":"E. Eze, J. E. Idiake, B. O. Ganiyu","doi":"10.2478/otmcj-2018-0008","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0008","url":null,"abstract":"Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and professionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was adopted to determine the factors that triggered the rework and the pattern of relationship that existed amongst the factors; relative importance index (RII) was used to assess the benefits of eliminating rework triggers. The study concluded that the factors that triggered the emergence of rework were omission and planning issues, change issues, funding and communication issues, and poor workers and resource control. Repeat patronage, higher productivity, and reduced delivery time reduced the rework and waste and improved the employee job satisfaction and morale; they were the benefits derived from eliminating rework triggers. It was recommended that there is a need for clarity, effectiveness, and timeliness of instruction and information dissemination amongst project participants and the participation of contractors, subcontractors, and other stakeholders at the design stages to avoid omissions and construction changes.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1778 - 1793"},"PeriodicalIF":2.1,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49539623","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Identification and evaluation of criteria for selecting contractors using a risk management approach 识别和评估使用风险管理方法选择承包商的标准
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-07-01 DOI: 10.2478/otmcj-2018-0004
E. Mousakhani, Shirzad Ranjbar, Taha Ashoori
Abstract Transferring all or some parts of the engineering activities or supply of goods to third persons or companies is one of the adopted methods that transfer a significant part of the likely risks to the concerned side. Outsourcing activities are followed by many benefits, such as reducing overhead and operational costs, increasing efficiency, reducing risk, and so on; however, if this is not done carefully, not only is no benefit gained, but also new risks are imposed on the organization. Considering that waste of time and cost diversions of projects stem from the selection of inappropriate contractors, risk assessment is important in outsourcing. Using a risk-oriented approach based on software toward outsourcing, the present study aims to identify and rate the factors affecting the selection of contractors and to finally provide a method to evaluate and select the proper way for the selection of contractors. This method is not just based on the lowest price, but it also includes several factors that influence the selection of contractors, which is achieved by applying the Expert Choice software. At first, the most important risk factors in the selection of contractors were identified according to the conducted research. Then, the factors that had the greatest risk potential for achieving the project goals were chosen from among them. The opinions of experts were obtained in the next phase to determine the importance of various factors in the process of contractor selection, which was achieved by the distribution of a questionnaire. Subsequently, the most important factors chosen by the experts were specified, and their relationship with the contractor’s risk management was found.
摘要将工程活动或货物供应的全部或部分转移给第三方或公司,是将很大一部分可能存在的风险转移给相关方的一种方法。外包活动带来了许多好处,例如减少开销和操作成本、提高效率、降低风险等等;然而,如果不小心这样做,不仅没有获得任何好处,而且还会给组织带来新的风险。考虑到项目的时间浪费和成本转移源于选择不合适的承包商,风险评估在外包中很重要。本研究采用基于软件的外包风险导向方法,旨在识别和评价影响承包商选择的因素,并最终提供一种评估和选择承包商选择方式的方法。该方法不仅基于最低价格,而且还包括影响承包商选择的几个因素,这是通过应用Expert Choice软件实现的。首先,根据所进行的研究,确定了承包商选择中最重要的风险因素。然后,从其中选择实现项目目标具有最大风险潜力的因素。下一阶段通过发放调查问卷的方式,收集专家的意见,确定承包商选择过程中各因素的重要性。随后,明确了专家选择的最重要因素,并找出了它们与承包商风险管理的关系。
{"title":"Identification and evaluation of criteria for selecting contractors using a risk management approach","authors":"E. Mousakhani, Shirzad Ranjbar, Taha Ashoori","doi":"10.2478/otmcj-2018-0004","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0004","url":null,"abstract":"Abstract Transferring all or some parts of the engineering activities or supply of goods to third persons or companies is one of the adopted methods that transfer a significant part of the likely risks to the concerned side. Outsourcing activities are followed by many benefits, such as reducing overhead and operational costs, increasing efficiency, reducing risk, and so on; however, if this is not done carefully, not only is no benefit gained, but also new risks are imposed on the organization. Considering that waste of time and cost diversions of projects stem from the selection of inappropriate contractors, risk assessment is important in outsourcing. Using a risk-oriented approach based on software toward outsourcing, the present study aims to identify and rate the factors affecting the selection of contractors and to finally provide a method to evaluate and select the proper way for the selection of contractors. This method is not just based on the lowest price, but it also includes several factors that influence the selection of contractors, which is achieved by applying the Expert Choice software. At first, the most important risk factors in the selection of contractors were identified according to the conducted research. Then, the factors that had the greatest risk potential for achieving the project goals were chosen from among them. The opinions of experts were obtained in the next phase to determine the importance of various factors in the process of contractor selection, which was achieved by the distribution of a questionnaire. Subsequently, the most important factors chosen by the experts were specified, and their relationship with the contractor’s risk management was found.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1747 - 1760"},"PeriodicalIF":2.1,"publicationDate":"2018-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.2478/otmcj-2018-0004","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42068660","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Life cycle management in upgrade and renewal of civil infrastructures 民用基础设施升级更新中的生命周期管理
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-06-01 DOI: 10.2478/otmcj-2018-0005
M. Hertogh, J. Bakker, M. J. van der Vlist, A. S. Barneveld
Abstract In the forthcoming decades, many objects in transport infrastructure networks will come to the end of their technical, economical or functional lifespan. The replacement and renovation will require substantial budgets and a timely start to secure the current functionalities. These challenges are a main concern for asset managers. However, the replacement programmes also have the opportunity not only to maintain the currently needed functionalities and quality but also for the timely adaptation of infrastructure networks to changing demands, because these will determine the value of these networks in the future. This will give added value not only to asset managers, but also to users (e.g. increased functionality), enterprises (e.g. new business opportunities), stakeholders (e.g. increase of liveability) and society as a whole (e.g. increased sustainability). Each replacement and renovation is an opportunity to make infrastructure networks more fit for future economic and environmental needs. This means a shift in thinking for asset managers to a broader view. This paper proposes strategies for asset managers to cope with the challenges and opportunities. The traditional approach focuses on the delivery, but the key for the replacement and renovation programme is to focus on the whole life cycle through life cycle management (LCM). From the LCM-approach, four perspectives are presented to strategic decision-making on replacements and renovations: (1) broadening towards a network approach as an opportunity for redesign, (2) developing innovations for increasing requirements and budget restrictions, (3) realizing adaptive networks to cope with future challenges and (4) combining functionalities to increase added value. Ultimately the goal is to maximize value for society.
在未来的几十年里,交通基础设施网络中的许多对象将达到其技术、经济或功能寿命的终点。更换和翻新将需要大量预算和及时启动,以确保目前的功能。这些挑战是资产管理公司的主要担忧。但是,替代方案不仅有机会维持目前所需的功能和质量,而且有机会及时调整基础设施网络以适应不断变化的需求,因为这将决定这些网络今后的价值。这不仅会给资产管理公司带来附加值,也会给用户(如增加功能)、企业(如新的商业机会)、利益相关者(如提高宜居性)和整个社会(如提高可持续性)带来附加值。每一次更换和翻新都是一个机会,使基础设施网络更适合未来的经济和环境需求。这意味着资产管理公司的思维转变为更广阔的视野。本文提出了资产管理公司应对挑战和机遇的策略。传统的方法侧重于交付,但更换和翻新计划的关键是通过生命周期管理(LCM)关注整个生命周期。从lcm方法出发,提出了替换和翻新战略决策的四个视角:(1)向网络方法扩展,作为重新设计的机会;(2)为不断增加的需求和预算限制开发创新;(3)实现自适应网络以应对未来挑战;(4)结合功能以增加附加值。最终的目标是使社会价值最大化。
{"title":"Life cycle management in upgrade and renewal of civil infrastructures","authors":"M. Hertogh, J. Bakker, M. J. van der Vlist, A. S. Barneveld","doi":"10.2478/otmcj-2018-0005","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0005","url":null,"abstract":"Abstract In the forthcoming decades, many objects in transport infrastructure networks will come to the end of their technical, economical or functional lifespan. The replacement and renovation will require substantial budgets and a timely start to secure the current functionalities. These challenges are a main concern for asset managers. However, the replacement programmes also have the opportunity not only to maintain the currently needed functionalities and quality but also for the timely adaptation of infrastructure networks to changing demands, because these will determine the value of these networks in the future. This will give added value not only to asset managers, but also to users (e.g. increased functionality), enterprises (e.g. new business opportunities), stakeholders (e.g. increase of liveability) and society as a whole (e.g. increased sustainability). Each replacement and renovation is an opportunity to make infrastructure networks more fit for future economic and environmental needs. This means a shift in thinking for asset managers to a broader view. This paper proposes strategies for asset managers to cope with the challenges and opportunities. The traditional approach focuses on the delivery, but the key for the replacement and renovation programme is to focus on the whole life cycle through life cycle management (LCM). From the LCM-approach, four perspectives are presented to strategic decision-making on replacements and renovations: (1) broadening towards a network approach as an opportunity for redesign, (2) developing innovations for increasing requirements and budget restrictions, (3) realizing adaptive networks to cope with future challenges and (4) combining functionalities to increase added value. Ultimately the goal is to maximize value for society.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1735 - 1746"},"PeriodicalIF":2.1,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45068941","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Power spectral and bispectral study of factors affecting employee turnover 员工离职影响因素的功率谱与双谱研究
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-06-01 DOI: 10.2478/otmcj-2018-0006
V. Tam, K. Le
Abstract Voluntary employee turnover can cause organizations to lose profits and competitiveness. Unexpected employee turnover may also result in project delay and reduction in project quality. It is important to control employee turnover rate and maintain good employees within an organization. This paper investigates the major causes of voluntary employee turnover in engineering industries. Australia, Mainland China, and Taiwan were selected for the investigation. Questionnaires were administered, and structured interviews were conducted. Power spectrum was used for the analysis. It was found that “Good physical working environment”, “Receiving advanced training”, and “Short travel distance between home and work” are the major job-related ideal factors for the Australian, Mainland China, and Taiwan respondents, respectively. However, “Far distance between work and home” and “Dislike the colleague relationships” are found as the major factors for leaving jobs for the Australian/Taiwan and Mainland China respondents, respectively. Recommendations to improve and to control employee turnover rate are also discussed.
员工自愿离职会造成企业利润和竞争力的损失。意外的员工流失也可能导致项目延迟,降低项目质量。控制员工流动率,在组织中保持优秀的员工是很重要的。本文研究了工程行业员工自愿离职的主要原因。澳大利亚、中国大陆和台湾被选为调查对象。进行问卷调查和结构化访谈。采用功率谱进行分析。调查发现,“良好的工作环境”、“接受高级培训”和“家和工作地点之间的交通距离短”分别是澳大利亚、中国大陆和台湾受访者的主要工作理想因素。然而,澳大利亚/台湾和中国大陆受访者分别发现“工作和家庭距离太远”和“不喜欢同事关系”是离职的主要因素。并对如何提高和控制员工流失率提出了建议。
{"title":"Power spectral and bispectral study of factors affecting employee turnover","authors":"V. Tam, K. Le","doi":"10.2478/otmcj-2018-0006","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0006","url":null,"abstract":"Abstract Voluntary employee turnover can cause organizations to lose profits and competitiveness. Unexpected employee turnover may also result in project delay and reduction in project quality. It is important to control employee turnover rate and maintain good employees within an organization. This paper investigates the major causes of voluntary employee turnover in engineering industries. Australia, Mainland China, and Taiwan were selected for the investigation. Questionnaires were administered, and structured interviews were conducted. Power spectrum was used for the analysis. It was found that “Good physical working environment”, “Receiving advanced training”, and “Short travel distance between home and work” are the major job-related ideal factors for the Australian, Mainland China, and Taiwan respondents, respectively. However, “Far distance between work and home” and “Dislike the colleague relationships” are found as the major factors for leaving jobs for the Australian/Taiwan and Mainland China respondents, respectively. Recommendations to improve and to control employee turnover rate are also discussed.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1727 - 1734"},"PeriodicalIF":2.1,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.2478/otmcj-2018-0006","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"69243198","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Adaptive reuse: an innovative approach for generating sustainable values for historic buildings in developing countries 适应性再利用:为发展中国家历史建筑创造可持续价值的创新方法
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-05-01 DOI: 10.2478/otmcj-2018-0002
A. Othman, Heba Elsaay
Abstract Sustainable development has become a goal for all countries seeking a balance between social, environmental and economic needs. The principal vision of a sustainable built future is about developing creative designs that utilize energy and materials effectively. However, this vision should consider historic buildings that were built centuries ago. Although many of these buildings are standing in a stable state, they are obsolete and their values are not fully utilized. Towards revitalizing and generating sustainable values of these buildings, adaptive reuse is adopted as a process of modifying, adapting and reusing obsolete buildings with their existing structures to extend their life cycle whilst performing a new function. This is currently practiced worldwide, specifically when a building has a unique architectural character and is in a stable condition. The adaptive reuse of a historic building should have minimal impact on the heritage significance of the building and its setting. This paper aims to investigate the effectiveness of adaptive reuse as an innovative approach for generating sustainable values of historic buildings in developing countries. To achieve this aim, a research strategy is designed to accomplish four objectives: first, literature related to sustainable development, sustainable values, adaptive reuse and developing countries is reviewed; second, two case studies are presented and analysed to investigate the role of adaptive reuse towards increasing the sustainable value of heritage buildings; third, a strategy with its action plan is developed for facilitating adaptive reuse of historic buildings in developing countries and finally, research conclusions are outlined and recommendations useful to professionals concerned with adaptive reuse of historic buildings are proposed.
摘要可持续发展已成为各国在社会、环境和经济需求之间寻求平衡的目标。可持续建筑未来的主要愿景是开发有效利用能源和材料的创造性设计。然而,这一愿景应该考虑几个世纪前建造的历史建筑。尽管这些建筑中有许多处于稳定状态,但它们已经过时,其价值没有得到充分利用。为了振兴和创造这些建筑的可持续价值,采用适应性再利用是一种对废弃建筑及其现有结构进行改造、改造和再利用的过程,以延长其生命周期,同时发挥新的功能。目前,这在世界各地都有实施,特别是当一座建筑具有独特的建筑特征并处于稳定状态时。历史建筑的适应性再利用应该对建筑及其环境的遗产意义产生最小的影响。本文旨在研究适应性再利用作为一种创新方法在发展中国家产生历史建筑可持续价值的有效性。为了实现这一目标,设计了一项研究战略,以实现四个目标:首先,审查与可持续发展、可持续价值、适应性再利用和发展中国家有关的文献;其次,介绍并分析了两个案例研究,以探讨适应性再利用在提高遗产建筑可持续价值方面的作用;第三,为促进发展中国家历史建筑的适应性再利用,制定了一项战略及其行动计划。最后,概述了研究结论,并提出了有益于历史建筑适应性再利用专业人员的建议。
{"title":"Adaptive reuse: an innovative approach for generating sustainable values for historic buildings in developing countries","authors":"A. Othman, Heba Elsaay","doi":"10.2478/otmcj-2018-0002","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0002","url":null,"abstract":"Abstract Sustainable development has become a goal for all countries seeking a balance between social, environmental and economic needs. The principal vision of a sustainable built future is about developing creative designs that utilize energy and materials effectively. However, this vision should consider historic buildings that were built centuries ago. Although many of these buildings are standing in a stable state, they are obsolete and their values are not fully utilized. Towards revitalizing and generating sustainable values of these buildings, adaptive reuse is adopted as a process of modifying, adapting and reusing obsolete buildings with their existing structures to extend their life cycle whilst performing a new function. This is currently practiced worldwide, specifically when a building has a unique architectural character and is in a stable condition. The adaptive reuse of a historic building should have minimal impact on the heritage significance of the building and its setting. This paper aims to investigate the effectiveness of adaptive reuse as an innovative approach for generating sustainable values of historic buildings in developing countries. To achieve this aim, a research strategy is designed to accomplish four objectives: first, literature related to sustainable development, sustainable values, adaptive reuse and developing countries is reviewed; second, two case studies are presented and analysed to investigate the role of adaptive reuse towards increasing the sustainable value of heritage buildings; third, a strategy with its action plan is developed for facilitating adaptive reuse of historic buildings in developing countries and finally, research conclusions are outlined and recommendations useful to professionals concerned with adaptive reuse of historic buildings are proposed.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1704 - 1718"},"PeriodicalIF":2.1,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47988010","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 34
Appraising the use of labour-only procurement system for building construction in Nigeria 评估尼日利亚建筑施工中仅使用劳动力采购系统的情况
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-05-01 DOI: 10.2478/otmcj-2018-0003
O. Akinkunmi, D. Aghimien, O. Awodele
Abstract Labour-only procurement system is gaining fast popularity among construction clients who want to make savings by procuring materials themselves, leaving the contractor to provide only the labour needed. This study, therefore, appraised this procurement system by assessing its cost performance, its suitability, construction participant’s willingness to use it for subsequent projects and its merits and demerits. Using a survey design approach through the use of questionnaire and a pro forma, data were gathered from a total of 98 construction professionals and contractors who have been involved in the use of this procurement system. Analyses of data were done using percentage, mean item score, Mann–Whitney U test and paired samples t-test. The study revealed that this procurement system is best for procuring residential buildings and minor alteration works. Construction participants who have used this system before are willing to still use it for subsequent works, as it delivers projects within budget and discourages short-changing of specifications and standard by contractors. However, the need for the time commitment and reduction in contractor’s profit are its major disadvantages. For its cost performance, an overall cost saving of about 2% was discovered for the assessed 32 projects. The findings of this study will be beneficial to various interest groups such as clients and estate developers in selecting the right procurement option to use.
摘要仅限劳动力的采购系统在建筑客户中迅速流行起来,他们希望通过自己采购材料来节省开支,让承包商只提供所需的劳动力。因此,本研究通过评估该采购系统的性价比、适用性、施工参与者在后续项目中使用该系统的意愿及其优缺点来评估该系统。采用调查设计方法,通过使用问卷和形式,从参与使用该采购系统的总共98名建筑专业人员和承包商那里收集了数据。使用百分比、平均项目得分、Mann-Whitney U检验和配对样本t检验对数据进行分析。研究显示,这种采购制度最适合采购住宅和小型改建工程。以前使用过该系统的施工参与者仍愿意在后续工程中使用该系统,因为它在预算范围内交付项目,不鼓励承包商短期更改规范和标准。然而,需要时间承诺和减少承包商的利润是其主要缺点。就其性价比而言,在评估的32个项目中,发现总体成本节省了约2%。这项研究的结果将有利于客户和房地产开发商等各种利益集团选择正确的采购方案。
{"title":"Appraising the use of labour-only procurement system for building construction in Nigeria","authors":"O. Akinkunmi, D. Aghimien, O. Awodele","doi":"10.2478/otmcj-2018-0003","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0003","url":null,"abstract":"Abstract Labour-only procurement system is gaining fast popularity among construction clients who want to make savings by procuring materials themselves, leaving the contractor to provide only the labour needed. This study, therefore, appraised this procurement system by assessing its cost performance, its suitability, construction participant’s willingness to use it for subsequent projects and its merits and demerits. Using a survey design approach through the use of questionnaire and a pro forma, data were gathered from a total of 98 construction professionals and contractors who have been involved in the use of this procurement system. Analyses of data were done using percentage, mean item score, Mann–Whitney U test and paired samples t-test. The study revealed that this procurement system is best for procuring residential buildings and minor alteration works. Construction participants who have used this system before are willing to still use it for subsequent works, as it delivers projects within budget and discourages short-changing of specifications and standard by contractors. However, the need for the time commitment and reduction in contractor’s profit are its major disadvantages. For its cost performance, an overall cost saving of about 2% was discovered for the assessed 32 projects. The findings of this study will be beneficial to various interest groups such as clients and estate developers in selecting the right procurement option to use.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1719 - 1726"},"PeriodicalIF":2.1,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41963741","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Genetic algorithm optimization for dynamic construction site layout planning 遗传算法优化动态施工场地布局规划
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-02-16 DOI: 10.1515/OTMCJ-2016-0026
M. Panagiotis, P. Athanasios
The dynamic construction site layout planning (DCSLP) problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time)- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.
动态施工现场布局规划(DCSLP)问题是指在动态变化的施工现场环境中,考虑到设施和工作相互关系的特点、施工现场的形状和地形以及随时间变化的工程需求,对临时施工设施进行有效的安置和搬迁。针对这一问题,建立了一个多目标动态优化模型,该模型考虑了设施的建设和搬迁成本、资源从一个设施转移到另一个设施或工作场所的运输成本,以及设施运行和互联所产生的安全和环境考虑。后一种考虑的形式是对特定设施与其他设施或工作区域的接近或遥远程度的偏好或限制。对多个项目阶段的分析和从一个阶段到另一个阶段的动态设施迁移极大地增加了问题的规模,即使在其静态形式下,也属于NP(非确定性多项式时间)-组合优化问题的困难类。因此,由于遗传算法具有在大解空间内进行鲁棒搜索的能力,因此对该解实现了遗传算法。几个案例研究和操作场景已经通过Palisade的Evolver软件实现,用于模型测试和评估。结果表明,在求解质量和计算时间方面,模型对时变输入数据的响应是满意的。该模型可以为站点管理人员提供决策支持,允许他们通过在决策过程中引入理想的偏好或约束,检查备选方案并根据他们的经验微调最佳解决方案。
{"title":"Genetic algorithm optimization for dynamic construction site layout planning","authors":"M. Panagiotis, P. Athanasios","doi":"10.1515/OTMCJ-2016-0026","DOIUrl":"https://doi.org/10.1515/OTMCJ-2016-0026","url":null,"abstract":"The dynamic construction site layout planning (DCSLP) problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time)- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1655-1664"},"PeriodicalIF":2.1,"publicationDate":"2018-02-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1515/OTMCJ-2016-0026","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"67253623","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 13
Nigerian Professional Female Construction Workers in Vocational Occupations: Diversification or Deviation? 尼日利亚职业女性建筑工人的职业生涯:多样化还是偏差?
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-02-01 DOI: 10.2478/otmcj-2018-0001
T. B. Odubiyi
Abstract The construction industry did not just evolve on its own. It is a product of the conscious efforts of several individuals called construction workers. In Nigeria, it is a large employer of the population, skilled, unskilled, and professional. However, the Nigerian construction industry, similar to other industries, is currently in a phase of economic reform. This is largely attributed to the present economic situation. The current recession condition of the Nigerian economy has an adverse effect on the income of the citizenry. This implies that other sources of income alongside the basic firsthand means of income generation have to be sourced. This dilemma is more prominent among women. Considering the construction industry, professional female construction workers have been observed to join the league of those involved in ancillary income generation occupations. It is worth noting, however, that there are few professional female construction workers in the first place. This paper addresses whether this drift is a diversification or deviation of Nigerian professional female construction workers to vocational occupations, by a rigorous review of related literature. The result shows that this new trend among professional female construction workers is a welcome one if it is diversification because this will improve the productiveness of the individual involved and, in the long run, better the economy. On the other hand, this work finds that if these vocational occupations make professional female construction workers leave their construction field totally or almost totally, then there is a threat to female population in the construction industry. However, diversification is encouraged.
建筑行业并不是自己发展起来的。它是几个被称为建筑工人的个人有意识努力的产物。在尼日利亚,它是人口的大雇主,有技术的、无技术的和专业的。然而,尼日利亚建筑业与其他行业一样,目前正处于经济改革阶段。这在很大程度上归因于目前的经济形势。尼日利亚经济目前的衰退状况对公民的收入产生了不利影响。这意味着除了产生收入的基本第一手手段外,还必须寻找其他收入来源。这种困境在女性中更为突出。就建筑行业而言,观察到专业女性建筑工人加入了辅助创收职业的联盟。然而,值得注意的是,首先,职业女性建筑工人很少。本文通过对相关文献的严格回顾,探讨了这种漂移是尼日利亚职业女性建筑工人向职业的多样化还是偏离。结果表明,在职业女性建筑工人中出现的这种新趋势是受欢迎的,如果它是多样化的话,因为这将提高相关个人的生产力,从长远来看,有利于经济发展。另一方面,本研究发现,如果这些职业使职业女性建筑工人完全或几乎完全离开其建筑领域,那么建筑业中的女性人口就会受到威胁。不过,鼓励多样化。
{"title":"Nigerian Professional Female Construction Workers in Vocational Occupations: Diversification or Deviation?","authors":"T. B. Odubiyi","doi":"10.2478/otmcj-2018-0001","DOIUrl":"https://doi.org/10.2478/otmcj-2018-0001","url":null,"abstract":"Abstract The construction industry did not just evolve on its own. It is a product of the conscious efforts of several individuals called construction workers. In Nigeria, it is a large employer of the population, skilled, unskilled, and professional. However, the Nigerian construction industry, similar to other industries, is currently in a phase of economic reform. This is largely attributed to the present economic situation. The current recession condition of the Nigerian economy has an adverse effect on the income of the citizenry. This implies that other sources of income alongside the basic firsthand means of income generation have to be sourced. This dilemma is more prominent among women. Considering the construction industry, professional female construction workers have been observed to join the league of those involved in ancillary income generation occupations. It is worth noting, however, that there are few professional female construction workers in the first place. This paper addresses whether this drift is a diversification or deviation of Nigerian professional female construction workers to vocational occupations, by a rigorous review of related literature. The result shows that this new trend among professional female construction workers is a welcome one if it is diversification because this will improve the productiveness of the individual involved and, in the long run, better the economy. On the other hand, this work finds that if these vocational occupations make professional female construction workers leave their construction field totally or almost totally, then there is a threat to female population in the construction industry. However, diversification is encouraged.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1696 - 1703"},"PeriodicalIF":2.1,"publicationDate":"2018-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48069856","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Control panel and indicators for production control in building projects 用于建筑项目生产控制的控制面板和指示器
IF 2.1 Q3 MANAGEMENT Pub Date : 2018-01-01 DOI: 10.1515/otmcj-2016-0027
P. Orihuela, Santiago Pacheco, J. Orihuela
Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.
一般来说,每个项目都应该有指标来监控是否符合既定目标。在建设项目中,许多研究者提出了大量的指标;然而,对现状的分析表明,结果、过程和领先指标之间经常存在混淆。本文是同一作者在2017年创意建筑会议上提交的论文的扩展版本,并发表在procdia Engineering (DOI: 10.1016/j.p proeng.2017.07.230)上,提出了住房项目设计、供应和组装阶段的这三种指标的建议。因此,所有的项目干系人都可以有一个控制面板,如果指标超过了限制,就可以进行监控,从而允许及时有效地采取纠正措施。
{"title":"Control panel and indicators for production control in building projects","authors":"P. Orihuela, Santiago Pacheco, J. Orihuela","doi":"10.1515/otmcj-2016-0027","DOIUrl":"https://doi.org/10.1515/otmcj-2016-0027","url":null,"abstract":"Abstract In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1665 - 1673"},"PeriodicalIF":2.1,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48743353","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Organization Technology and Management in Construction
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1