Pub Date : 2021-10-11DOI: 10.1108/jopp-04-2020-0031
Sheila Namagembe, Joseph Ntayi Mpeera, Awad Kalid
Purpose This study aims to examine the influence of market logics on tendering capabilities and small and medium enterprise (SME) involvement in public procurement, the influence of SME governance mechanisms on tendering capabilities and SME involvement in public procurement and the influence of tendering capabilities on SME involvement in public procurement. Design/methodology/approach Data was collected from owners/managers of SMEs registered by the Public Procurement and Disposal of Public Assets Authority. The SPSS software and CB-SEM software were used to obtain results on the influence of market logics on tendering capabilities and SME involvement in public procurement, the influence of SME governance mechanisms on tendering capabilities and SME involvement in public procurement and the influence of tendering capabilities on SME involvement in public procurement. Findings Findings indicated that SME involvement in public procurement is mainly influenced by their governance mechanisms whilst both market logics and governance mechanisms had a positive influence on tendering capabilities of SME firms. Market logics and tendering capabilities had no effect on SME involvement. Research limitations/implications The study mainly focussed on SMEs’ involvement in public procurement. The research has implications for decision makers in government and SME firms concerned with enhancing levels of SME involvement in public procurement activities. Originality/value Many governments are now focussing on procurement lot sizing so as to increase SME involvement in public procurement. Despite the use of lot sizing, SME involvement in public procurement is still low in many developing countries and also declining in others. Aspects such as market logics and governance mechanisms that may help understand the variations in involvement have not been given significant attention.
{"title":"An examination of SME involvement in public procurement under bid lot sizing","authors":"Sheila Namagembe, Joseph Ntayi Mpeera, Awad Kalid","doi":"10.1108/jopp-04-2020-0031","DOIUrl":"https://doi.org/10.1108/jopp-04-2020-0031","url":null,"abstract":"\u0000Purpose\u0000This study aims to examine the influence of market logics on tendering capabilities and small and medium enterprise (SME) involvement in public procurement, the influence of SME governance mechanisms on tendering capabilities and SME involvement in public procurement and the influence of tendering capabilities on SME involvement in public procurement.\u0000\u0000\u0000Design/methodology/approach\u0000Data was collected from owners/managers of SMEs registered by the Public Procurement and Disposal of Public Assets Authority. The SPSS software and CB-SEM software were used to obtain results on the influence of market logics on tendering capabilities and SME involvement in public procurement, the influence of SME governance mechanisms on tendering capabilities and SME involvement in public procurement and the influence of tendering capabilities on SME involvement in public procurement.\u0000\u0000\u0000Findings\u0000Findings indicated that SME involvement in public procurement is mainly influenced by their governance mechanisms whilst both market logics and governance mechanisms had a positive influence on tendering capabilities of SME firms. Market logics and tendering capabilities had no effect on SME involvement.\u0000\u0000\u0000Research limitations/implications\u0000The study mainly focussed on SMEs’ involvement in public procurement. The research has implications for decision makers in government and SME firms concerned with enhancing levels of SME involvement in public procurement activities.\u0000\u0000\u0000Originality/value\u0000Many governments are now focussing on procurement lot sizing so as to increase SME involvement in public procurement. Despite the use of lot sizing, SME involvement in public procurement is still low in many developing countries and also declining in others. Aspects such as market logics and governance mechanisms that may help understand the variations in involvement have not been given significant attention.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44615893","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-09-13DOI: 10.1108/JOPP-10-2020-0076
Chad Joseph Rutkowski, Karen Eboch, A. Carr, Bertie M. Greer
Purpose This study aims to highlight and validate the importance of strategic procurement and its value to both public and private firms. This study discusses a collaborative private-public partnership (PPP), supply chain advisory committee (SCAC), established during the coronavirus (COVID-19) pandemic to acquire personal protective equipment (PPE) and other critical supplies for a donation center in Toledo, Ohio, USA. This center serves the community and small businesses. This paper discusses the strategies, process and framework that were created to procure the needed items under a short lead time. The process of the partnership and outcomes are transferable and capable of being used by others to benefit society. Design/methodology/approach The case study methodology was used to investigate and summarize the actions and events of the SCAC. The case presented was tracked from the initial call to action from a local emergency response organization, Lucas County Emergency Operation Center (EOC), through the first six months of the committee’s work. Data collection was completed through a triangulation of sources. Findings The findings of this study reveal that public firms are vulnerable in a crisis. A crisis exposes the inequities in the supply chain and the need for public and private collaboration to use innovative procurement strategies. This study suggests that PPP procurement professionals benefit from working together. Both can learn from the limitations and benefits of collaborating. Practical implications This study offers a framework on how PPPs can be established to procure PPE during a crisis. This study has practical implications for private and public firms seeking to collaborate for the good of society. Social implications The findings of the study reveal that public firms are vulnerable in a crisis, which exposes the inequities in their supply chains. Private-public partnership (PPP) procurement professionals mutually benefit from working together as both can learn from each whether it is procuring PPE during a crisis or seeking to team up for the good of society. Society benefits when these organizations share solutions to problems rather than compete against one another during a crisis-situation such as a global pandemic. Supplies get to those who need them the most and information flows amongst the organizations to ensure equity in the availability of the supplies. Originality/value This study contributes to the growing body of literature that argues that public procurement must be innovative and strategic to contribute to socially responsible solutions. Government regulations require public procurement to use competitive bidding for accountability, cost reduction and to reduce fraud. However, emergency situations require innovative procurement strategies. The use of innovative procurement strategies is typical in private procurement. During a crisis, supplier relationships, lead-time management and shared and transfe
{"title":"Strategic procurement collaboration for the common good: private and public procurement relationship duringa pandemic","authors":"Chad Joseph Rutkowski, Karen Eboch, A. Carr, Bertie M. Greer","doi":"10.1108/JOPP-10-2020-0076","DOIUrl":"https://doi.org/10.1108/JOPP-10-2020-0076","url":null,"abstract":"\u0000Purpose\u0000This study aims to highlight and validate the importance of strategic procurement and its value to both public and private firms. This study discusses a collaborative private-public partnership (PPP), supply chain advisory committee (SCAC), established during the coronavirus (COVID-19) pandemic to acquire personal protective equipment (PPE) and other critical supplies for a donation center in Toledo, Ohio, USA. This center serves the community and small businesses. This paper discusses the strategies, process and framework that were created to procure the needed items under a short lead time. The process of the partnership and outcomes are transferable and capable of being used by others to benefit society.\u0000\u0000\u0000Design/methodology/approach\u0000The case study methodology was used to investigate and summarize the actions and events of the SCAC. The case presented was tracked from the initial call to action from a local emergency response organization, Lucas County Emergency Operation Center (EOC), through the first six months of the committee’s work. Data collection was completed through a triangulation of sources.\u0000\u0000\u0000Findings\u0000The findings of this study reveal that public firms are vulnerable in a crisis. A crisis exposes the inequities in the supply chain and the need for public and private collaboration to use innovative procurement strategies. This study suggests that PPP procurement professionals benefit from working together. Both can learn from the limitations and benefits of collaborating.\u0000\u0000\u0000Practical implications\u0000This study offers a framework on how PPPs can be established to procure PPE during a crisis. This study has practical implications for private and public firms seeking to collaborate for the good of society.\u0000\u0000\u0000Social implications\u0000The findings of the study reveal that public firms are vulnerable in a crisis, which exposes the inequities in their supply chains. Private-public partnership (PPP) procurement professionals mutually benefit from working together as both can learn from each whether it is procuring PPE during a crisis or seeking to team up for the good of society. Society benefits when these organizations share solutions to problems rather than compete against one another during a crisis-situation such as a global pandemic. Supplies get to those who need them the most and information flows amongst the organizations to ensure equity in the availability of the supplies.\u0000\u0000\u0000Originality/value\u0000This study contributes to the growing body of literature that argues that public procurement must be innovative and strategic to contribute to socially responsible solutions. Government regulations require public procurement to use competitive bidding for accountability, cost reduction and to reduce fraud. However, emergency situations require innovative procurement strategies. The use of innovative procurement strategies is typical in private procurement. During a crisis, supplier relationships, lead-time management and shared and transfe","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41512491","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-08-27DOI: 10.1108/jopp-01-2019-0002
N. Patil, N. Thounaojam, B. Laishram
Purpose Increasingly adopted by various governments for infrastructure development, public-private partnerships (PPPs) have become a popular procurement delivery system, outperforming other systems. However, PPPs have been especially criticised due to the lack of sustainability aspect during the development and implementation of the projects. In India, similar critiques have been raised, as these qualities have inhibited the development of society and increased the time and cost overrun in the development of PPP projects. This paper, therefore, aims to address the sustainability issues in PPPs and systematically analyses from the perspective of the principles of sustainable development. Design/methodology/approach Based on literature review and focussed interviews with stakeholders in India, a qualitative system dynamics (SD) model using causal loop diagramming is developed to propose the inclusion of various strategies in the PPP procurement process, which can enhance the sustainability of the PPP process. Finally, the integration of these strategies in the current PPP procurement process has been highlighted in the form of the introduction of new mechanisms and policies and modification of the existing mechanism and procurement policies. Findings The paper first highlights key sustainability issues in the PPP procurement process and suggests 34 strategies to address the issues. The modelling approaches and the proposed strategies, along with their interrelationships, could help the PPP decision makers in implementing responsive policies in bringing sustainable development in the PPP procurement process. Research limitations/implications The SD model developed is based on limited data, primarily focussed on PPP procurement practices in the context of infrastructure development in India. Developing the model with the analysis of a wider range of data and constructing a customised model can take broader perspectives into account. Social implications Adoption of the identified strategies can facilitate the inclusion of sustainability practices in the development of infrastructure projects, which are even procured using private finance. Originality/value Studies on how to promote sustainable infrastructure development when procured through the PPP route are in the nascent stage. This study, therefore, extends the current body of knowledge on infrastructure projects implementation through PPPs from financial engineering and risk management to a sustainability perspective.
{"title":"Enhancing sustainability of Indian PPP procurement process using system dynamics model","authors":"N. Patil, N. Thounaojam, B. Laishram","doi":"10.1108/jopp-01-2019-0002","DOIUrl":"https://doi.org/10.1108/jopp-01-2019-0002","url":null,"abstract":"\u0000Purpose\u0000Increasingly adopted by various governments for infrastructure development, public-private partnerships (PPPs) have become a popular procurement delivery system, outperforming other systems. However, PPPs have been especially criticised due to the lack of sustainability aspect during the development and implementation of the projects. In India, similar critiques have been raised, as these qualities have inhibited the development of society and increased the time and cost overrun in the development of PPP projects. This paper, therefore, aims to address the sustainability issues in PPPs and systematically analyses from the perspective of the principles of sustainable development.\u0000\u0000\u0000Design/methodology/approach\u0000Based on literature review and focussed interviews with stakeholders in India, a qualitative system dynamics (SD) model using causal loop diagramming is developed to propose the inclusion of various strategies in the PPP procurement process, which can enhance the sustainability of the PPP process. Finally, the integration of these strategies in the current PPP procurement process has been highlighted in the form of the introduction of new mechanisms and policies and modification of the existing mechanism and procurement policies.\u0000\u0000\u0000Findings\u0000The paper first highlights key sustainability issues in the PPP procurement process and suggests 34 strategies to address the issues. The modelling approaches and the proposed strategies, along with their interrelationships, could help the PPP decision makers in implementing responsive policies in bringing sustainable development in the PPP procurement process.\u0000\u0000\u0000Research limitations/implications\u0000The SD model developed is based on limited data, primarily focussed on PPP procurement practices in the context of infrastructure development in India. Developing the model with the analysis of a wider range of data and constructing a customised model can take broader perspectives into account.\u0000\u0000\u0000Social implications\u0000Adoption of the identified strategies can facilitate the inclusion of sustainability practices in the development of infrastructure projects, which are even procured using private finance.\u0000\u0000\u0000Originality/value\u0000Studies on how to promote sustainable infrastructure development when procured through the PPP route are in the nascent stage. This study, therefore, extends the current body of knowledge on infrastructure projects implementation through PPPs from financial engineering and risk management to a sustainability perspective.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"1 1","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41417107","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-08-17DOI: 10.1108/jopp-07-2020-0058
Daniel M. Sabet
Purpose In addition to lower value for money and the loss of trust in government, procurement corruption threatens to produce a vicious cycle whereby honest firms self-select out of public procurements, further increasing corruption and decreasing value for money. This paper aims to explore this vicious cycle hypothesis. Design/methodology/approach This paper uses a survey of businesses registered with the procurement regulator in Honduras, a country with high grand corruption but low levels of administrative procurement corruption. The study uses the survey to test the effects of experiences and perceptions of corruption and personal connections on perceptions of fairness and intention to bid on future procurements. Findings This study finds that experiences with bribery and the perceived importance of personal and party connections undermine perceptions of fairness, particularly for firms bidding with Honduras’s public works agency. While firms that have not bid recently view the process as less merit-based than those that have, the study does not find that perceptions of fairness influence intention to bid in the future as the vicious cycle hypothesis would suggest. Social implications This research suggests that even firms that are frustrated with procurement irregularities are willing to tolerate them to access government markets. Originality/value The study benefits from a unique survey of businesses on issues of corruption and connections in a challenging procurement environment.
{"title":"Bidding despite corruption: evidence from Honduras","authors":"Daniel M. Sabet","doi":"10.1108/jopp-07-2020-0058","DOIUrl":"https://doi.org/10.1108/jopp-07-2020-0058","url":null,"abstract":"\u0000Purpose\u0000In addition to lower value for money and the loss of trust in government, procurement corruption threatens to produce a vicious cycle whereby honest firms self-select out of public procurements, further increasing corruption and decreasing value for money. This paper aims to explore this vicious cycle hypothesis.\u0000\u0000\u0000Design/methodology/approach\u0000This paper uses a survey of businesses registered with the procurement regulator in Honduras, a country with high grand corruption but low levels of administrative procurement corruption. The study uses the survey to test the effects of experiences and perceptions of corruption and personal connections on perceptions of fairness and intention to bid on future procurements.\u0000\u0000\u0000Findings\u0000This study finds that experiences with bribery and the perceived importance of personal and party connections undermine perceptions of fairness, particularly for firms bidding with Honduras’s public works agency. While firms that have not bid recently view the process as less merit-based than those that have, the study does not find that perceptions of fairness influence intention to bid in the future as the vicious cycle hypothesis would suggest.\u0000\u0000\u0000Social implications\u0000This research suggests that even firms that are frustrated with procurement irregularities are willing to tolerate them to access government markets.\u0000\u0000\u0000Originality/value\u0000The study benefits from a unique survey of businesses on issues of corruption and connections in a challenging procurement environment.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42368106","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-08-16DOI: 10.1108/jopp-11-2019-0078
B. Orser, Xiaolu (Diane) Liao, A. Riding, Q. Duong, Jérôme Catimel
Purpose This paper aims to inform strategies to enhance public procurement opportunities for women-owned small- and medium-sized enterprises (SMEs). To do so, the study examines two research questions: To what extent are women-owned enterprises under-represented among SME suppliers to government; and Do barriers to public procurement – as perceived by SME owners – differ across gender? Design/methodology/approach The study draws on the resource-based view (RBV) of the firm and on theories of role congruity and social feminism to develop the study’s hypotheses. Empirical analyses rely on comparisons of a sample of 1,021 SMEs that had been suppliers to government and 9,376 employer firms that had not been suppliers to government. Data were collected by Statistics Canada and are nationally representative. Logistic regression analysis was used to control for systemic firm and owner differences. Findings Controlling firm and owner attributes, majority women-owned businesses were underrepresented as SME suppliers to government in some, but not all sectors. Women-owned SMEs in Wholesale and Retail and in Other Services were, ceteris paribus, half as likely as to be government suppliers as counterpart SMEs owned by men. Among Goods Producers and for Professional, Scientific and Technical Services SMEs, there were no significant gender differences in the propensity to supply the federal government. “Complexity of the contracting process” and “difficulty finding contract opportunities” were the obstacles to contracting cited most frequently. Research limitations/implications The limitations of using secondary analyses of data are well documented and apply here. The findings reflect only the perspectives of “successful bidders” and do not capture SMEs that submitted bids but were not successful. Furthermore, the survey did not include questions about sub-contractor enterprises, data that would likely provide even more insights about SMEs in government supply chains. Accordingly, the study could not address sub-contracting strategies to increase the number of women-owned businesses on government contracts. Statistics Canada’s privacy protocols also limited the extent to which the research team could examine sub-groups of small business owners, such as visible minorities and Indigenous/Aboriginal persons. It is also notable that much of the SME literature, as well as this study, define gender as a dichotomous (women/female, men/male) attribute. Comparing women/female and men/males implicitly assumes within group homogeneity. Future research should use a more inclusive definition of gender. Research is also required to inform about the obstacles to government procurement among the population of SMEs that were unsuccessful in their bids. Practical implications The study provides benchmarks on, and directions to, enhance the participation of women-owned SMEs or enterprises in public procurement. Strategies to support women-owned small businesses that co
{"title":"Gender-responsive public procurement: strategies to support women-owned enterprises","authors":"B. Orser, Xiaolu (Diane) Liao, A. Riding, Q. Duong, Jérôme Catimel","doi":"10.1108/jopp-11-2019-0078","DOIUrl":"https://doi.org/10.1108/jopp-11-2019-0078","url":null,"abstract":"\u0000Purpose\u0000This paper aims to inform strategies to enhance public procurement opportunities for women-owned small- and medium-sized enterprises (SMEs). To do so, the study examines two research questions: To what extent are women-owned enterprises under-represented among SME suppliers to government; and Do barriers to public procurement – as perceived by SME owners – differ across gender?\u0000\u0000\u0000Design/methodology/approach\u0000The study draws on the resource-based view (RBV) of the firm and on theories of role congruity and social feminism to develop the study’s hypotheses. Empirical analyses rely on comparisons of a sample of 1,021 SMEs that had been suppliers to government and 9,376 employer firms that had not been suppliers to government. Data were collected by Statistics Canada and are nationally representative. Logistic regression analysis was used to control for systemic firm and owner differences.\u0000\u0000\u0000Findings\u0000Controlling firm and owner attributes, majority women-owned businesses were underrepresented as SME suppliers to government in some, but not all sectors. Women-owned SMEs in Wholesale and Retail and in Other Services were, ceteris paribus, half as likely as to be government suppliers as counterpart SMEs owned by men. Among Goods Producers and for Professional, Scientific and Technical Services SMEs, there were no significant gender differences in the propensity to supply the federal government. “Complexity of the contracting process” and “difficulty finding contract opportunities” were the obstacles to contracting cited most frequently.\u0000\u0000\u0000Research limitations/implications\u0000The limitations of using secondary analyses of data are well documented and apply here. The findings reflect only the perspectives of “successful bidders” and do not capture SMEs that submitted bids but were not successful. Furthermore, the survey did not include questions about sub-contractor enterprises, data that would likely provide even more insights about SMEs in government supply chains. Accordingly, the study could not address sub-contracting strategies to increase the number of women-owned businesses on government contracts. Statistics Canada’s privacy protocols also limited the extent to which the research team could examine sub-groups of small business owners, such as visible minorities and Indigenous/Aboriginal persons. It is also notable that much of the SME literature, as well as this study, define gender as a dichotomous (women/female, men/male) attribute. Comparing women/female and men/males implicitly assumes within group homogeneity. Future research should use a more inclusive definition of gender. Research is also required to inform about the obstacles to government procurement among the population of SMEs that were unsuccessful in their bids.\u0000\u0000\u0000Practical implications\u0000The study provides benchmarks on, and directions to, enhance the participation of women-owned SMEs or enterprises in public procurement. Strategies to support women-owned small businesses that co","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46271586","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-07-16DOI: 10.1108/jopp-04-2021-0025
B. Allen
Purpose The purpose of this paper is to investigate how the underpinning ideas of public procurement allowed for broader outcomes – a more strategic form of public procurement – to emerge. The paper contributes to the literature on public procurement by empirically addressing the evolution of procurement as a government policy lever in New Zealand so as to demonstrate how policy pragmatism can ensure a shift without a complete overhaul of a complex system. Design/methodology/approach The paper has used a single country case study to examine a recent development in procurement policy. The objectives of the paper are achieved by adopting a unique conceptual framework connecting ideas, sensemaking and bricolage. Findings The paper provides empirical and conceptual insights about how bricolage, or policy pragmatism, aids in dealing with the constraints of ideational legacies. It demonstrates a particular form of targeting in procurement, common in public administration but not well understood in the procurement field. Research limitations/implications Single country case studies lack scientific generalizability. However, they add to the canon of knowledge that is lacking in the field of public procurement in this case. They also provide a stronger starting point for further research especially with respect to comparative studies. Practical implications The paper provides an excellent example of the development of procurement policy that is useful for procurement officials from other countries undergoing change or looking to update or create procurement policies. It shows a high-level process of implementation for government priority outcomes from a country well-known for its quality of public management and governance. Social implications New Zealand has significant equity issues especially as related to its indigenous population. Procurement is being used increasingly as a lever to improve equity. This article includes information about New Zealand's uptake of social procurement. Originality/value This paper fulfils a need for greater understanding of how policy is “put together” and the dynamics at major points of change or the implications of policy changes. To the best of the author’s knowledge, this case study of procurement policy in New Zealand is original, and the author is aware of no other similar work emanating from New Zealand in the academic journals.
{"title":"Broader outcomes in procurement policy – a case of New Zealand pragmatism","authors":"B. Allen","doi":"10.1108/jopp-04-2021-0025","DOIUrl":"https://doi.org/10.1108/jopp-04-2021-0025","url":null,"abstract":"\u0000Purpose\u0000The purpose of this paper is to investigate how the underpinning ideas of public procurement allowed for broader outcomes – a more strategic form of public procurement – to emerge. The paper contributes to the literature on public procurement by empirically addressing the evolution of procurement as a government policy lever in New Zealand so as to demonstrate how policy pragmatism can ensure a shift without a complete overhaul of a complex system.\u0000\u0000\u0000Design/methodology/approach\u0000The paper has used a single country case study to examine a recent development in procurement policy. The objectives of the paper are achieved by adopting a unique conceptual framework connecting ideas, sensemaking and bricolage.\u0000\u0000\u0000Findings\u0000The paper provides empirical and conceptual insights about how bricolage, or policy pragmatism, aids in dealing with the constraints of ideational legacies. It demonstrates a particular form of targeting in procurement, common in public administration but not well understood in the procurement field.\u0000\u0000\u0000Research limitations/implications\u0000Single country case studies lack scientific generalizability. However, they add to the canon of knowledge that is lacking in the field of public procurement in this case. They also provide a stronger starting point for further research especially with respect to comparative studies.\u0000\u0000\u0000Practical implications\u0000The paper provides an excellent example of the development of procurement policy that is useful for procurement officials from other countries undergoing change or looking to update or create procurement policies. It shows a high-level process of implementation for government priority outcomes from a country well-known for its quality of public management and governance.\u0000\u0000\u0000Social implications\u0000New Zealand has significant equity issues especially as related to its indigenous population. Procurement is being used increasingly as a lever to improve equity. This article includes information about New Zealand's uptake of social procurement.\u0000\u0000\u0000Originality/value\u0000This paper fulfils a need for greater understanding of how policy is “put together” and the dynamics at major points of change or the implications of policy changes. To the best of the author’s knowledge, this case study of procurement policy in New Zealand is original, and the author is aware of no other similar work emanating from New Zealand in the academic journals.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44033728","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-06-18DOI: 10.1108/jopp-01-2021-0002
Raúl Aparicio-Arias, Jenny Moreno
Purpose This paper aims to explore public procurement frameworks during disasters in Chile and New Zealand, identifying the factors that affect government procurement performance in disaster response. Design/methodology/approach This research adopted a case study methodology following a qualitative approach. Semi-structured interviews were conducted with government officers from Chile and New Zealand who had practice-relevant knowledge of public procurement and disaster management. Data was complemented by document reviews, including government reports and the records of disaster management organizations. Findings This paper finds public procurement to be negatively affected by several factors during disasters, including celerity and flexibility of response; market and supplier restrictions; pressures over procurement teams; centralism of procurement structures; lack of technical knowledge; competition and crossover of agreements; corruption; and price variations. Practical implications This paper includes policy recommendations on how to increase the effectiveness of disaster management and public procurement systems in countries at high risk of earthquakes and other disasters. Social implications This paper can help public procurement officers to provide a better response during disasters, supplying the goods and services required to the affected population in a timely and effective manner. Originality/value This paper addresses a gap in research by identifying factors which negatively impact government procurement and response during a disaster.
{"title":"Factors influencing public procurement during disasters: the cases of Chile and New Zealand","authors":"Raúl Aparicio-Arias, Jenny Moreno","doi":"10.1108/jopp-01-2021-0002","DOIUrl":"https://doi.org/10.1108/jopp-01-2021-0002","url":null,"abstract":"\u0000Purpose\u0000This paper aims to explore public procurement frameworks during disasters in Chile and New Zealand, identifying the factors that affect government procurement performance in disaster response.\u0000\u0000\u0000Design/methodology/approach\u0000This research adopted a case study methodology following a qualitative approach. Semi-structured interviews were conducted with government officers from Chile and New Zealand who had practice-relevant knowledge of public procurement and disaster management. Data was complemented by document reviews, including government reports and the records of disaster management organizations.\u0000\u0000\u0000Findings\u0000This paper finds public procurement to be negatively affected by several factors during disasters, including celerity and flexibility of response; market and supplier restrictions; pressures over procurement teams; centralism of procurement structures; lack of technical knowledge; competition and crossover of agreements; corruption; and price variations.\u0000\u0000\u0000Practical implications\u0000This paper includes policy recommendations on how to increase the effectiveness of disaster management and public procurement systems in countries at high risk of earthquakes and other disasters.\u0000\u0000\u0000Social implications\u0000This paper can help public procurement officers to provide a better response during disasters, supplying the goods and services required to the affected population in a timely and effective manner.\u0000\u0000\u0000Originality/value\u0000This paper addresses a gap in research by identifying factors which negatively impact government procurement and response during a disaster.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42558625","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-06-16DOI: 10.1108/JOPP-04-2020-0035
Junqi Liu, Yanlin Ma, A. Appolloni, Wenjuan Cheng
Purpose This study aims to uncover the black box of the influence mechanism between external stakeholder drivers and green public procurement practice, and meanwhile to explore the moderating role of administrative level in this process. Green public procurement (GPP) has been widely implemented. Existing literature has found that external stakeholder drivers can affect public sectors' GPP practice, however, the definition of its connotation is still unclear, and how external stakeholders affect GPP practice has remained a black box. Design/methodology/approach After defining the major external stakeholders, this study develops a multiple mediation theoretical model using survey data from 142 Chinese local public sectors. It aims to uncover the black box of the influence mechanism between external stakeholder drivers and GPP practice and meanwhile explore the moderating effect of administrative levels in this process. Findings The results show that external stakeholder drivers have a positive relationship with GPP practices. The knowledge of GPP implementation policies and the knowledge of GPP benefits can both mediate this relationship. This study also finds that the administrative level of public sectors can positively moderate the mediating effect produced by the knowledge of GPP implementation policies and negatively moderate the mediation effect produced by the knowledge of GPP benefits. Social implications Local governments need to better encourage public sectors to implement GPP. Managers of public sectors need to pay attention to organizational learning to acquire relevant knowledge on GPP. Originality/value This study makes a theoretical contribution to a better understanding of the influence mechanism for GPP practice. This study also provides comparisons of GPP implementation policies between China and European Union.
{"title":"How external stakeholders drive the green public procurement practice? An organizational learning perspective","authors":"Junqi Liu, Yanlin Ma, A. Appolloni, Wenjuan Cheng","doi":"10.1108/JOPP-04-2020-0035","DOIUrl":"https://doi.org/10.1108/JOPP-04-2020-0035","url":null,"abstract":"\u0000Purpose\u0000This study aims to uncover the black box of the influence mechanism between external stakeholder drivers and green public procurement practice, and meanwhile to explore the moderating role of administrative level in this process. Green public procurement (GPP) has been widely implemented. Existing literature has found that external stakeholder drivers can affect public sectors' GPP practice, however, the definition of its connotation is still unclear, and how external stakeholders affect GPP practice has remained a black box.\u0000\u0000\u0000Design/methodology/approach\u0000After defining the major external stakeholders, this study develops a multiple mediation theoretical model using survey data from 142 Chinese local public sectors. It aims to uncover the black box of the influence mechanism between external stakeholder drivers and GPP practice and meanwhile explore the moderating effect of administrative levels in this process.\u0000\u0000\u0000Findings\u0000The results show that external stakeholder drivers have a positive relationship with GPP practices. The knowledge of GPP implementation policies and the knowledge of GPP benefits can both mediate this relationship. This study also finds that the administrative level of public sectors can positively moderate the mediating effect produced by the knowledge of GPP implementation policies and negatively moderate the mediation effect produced by the knowledge of GPP benefits.\u0000\u0000\u0000Social implications\u0000Local governments need to better encourage public sectors to implement GPP. Managers of public sectors need to pay attention to organizational learning to acquire relevant knowledge on GPP.\u0000\u0000\u0000Originality/value\u0000This study makes a theoretical contribution to a better understanding of the influence mechanism for GPP practice. This study also provides comparisons of GPP implementation policies between China and European Union.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42371158","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-06-14DOI: 10.1108/JOPP-07-2020-0057
Pricivel M Carrera, S. Katik, F. Schotanus
Purpose Little is known about actual price savings generated by cooperative purchasing and nonmonetary advantages, disadvantages and impediments for the cooperative purchasing of complex or high-risk purchases. This paper aims to explore these topics by studying joint purchasing of pacemakers in The Netherlands. Design/methodology/approach To evaluate the magnitude of price savings, data on individual and collective prices for 18 hospitals was analyzed. In addition, 16 interviews were carried out with representatives of hospitals that participated and did not participate in the joint purchase. Findings Based on quantitative and qualitative data, the authors found large differences in price savings which can be attributed to scale, but mostly to knowledge of the group and renewing a contract in a technology-driven and developing market. Limited product choice – because of an organization joining a cooperative – constrained the attractiveness of cooperative purchasing, as end users may have specific product preferences. The consideration of preferences of end users is important toward successful joint purchasing of complex items. Social implications The authors argue that price savings because of scale are about 7% for smaller organizations and 4% for larger organizations. For smaller organizations with low specific knowledge and capacity for buying complex products, economies of process and knowledge are more important reasons for joining a purchasing group than scale. For large organizations with high specific knowledge and capacity, scale is the most important reason. Originality/value This study combined qualitative and quantitative perspectives, using actual spend data, to investigate cooperative purchasing of high-risk or complex purchases. On the one hand, more insight into the magnitude and reasons for price savings is provided than in earlier literature. On the other hand, more insight is given in qualitative reasons for joining a group and challenges for cooperative purchasing of complex items.
{"title":"Joint procurement of complex products: actual price savings, perceived nonmonetary advantages, disadvantages and impediments","authors":"Pricivel M Carrera, S. Katik, F. Schotanus","doi":"10.1108/JOPP-07-2020-0057","DOIUrl":"https://doi.org/10.1108/JOPP-07-2020-0057","url":null,"abstract":"\u0000Purpose\u0000Little is known about actual price savings generated by cooperative purchasing and nonmonetary advantages, disadvantages and impediments for the cooperative purchasing of complex or high-risk purchases. This paper aims to explore these topics by studying joint purchasing of pacemakers in The Netherlands.\u0000\u0000\u0000Design/methodology/approach\u0000To evaluate the magnitude of price savings, data on individual and collective prices for 18 hospitals was analyzed. In addition, 16 interviews were carried out with representatives of hospitals that participated and did not participate in the joint purchase.\u0000\u0000\u0000Findings\u0000Based on quantitative and qualitative data, the authors found large differences in price savings which can be attributed to scale, but mostly to knowledge of the group and renewing a contract in a technology-driven and developing market. Limited product choice – because of an organization joining a cooperative – constrained the attractiveness of cooperative purchasing, as end users may have specific product preferences. The consideration of preferences of end users is important toward successful joint purchasing of complex items.\u0000\u0000\u0000Social implications\u0000The authors argue that price savings because of scale are about 7% for smaller organizations and 4% for larger organizations. For smaller organizations with low specific knowledge and capacity for buying complex products, economies of process and knowledge are more important reasons for joining a purchasing group than scale. For large organizations with high specific knowledge and capacity, scale is the most important reason.\u0000\u0000\u0000Originality/value\u0000This study combined qualitative and quantitative perspectives, using actual spend data, to investigate cooperative purchasing of high-risk or complex purchases. On the one hand, more insight into the magnitude and reasons for price savings is provided than in earlier literature. On the other hand, more insight is given in qualitative reasons for joining a group and challenges for cooperative purchasing of complex items.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45412778","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2021-06-10DOI: 10.1108/JOPP-07-2020-0061
Carter B. Casady, David Baxter
Purpose The novel coronavirus (COVID-19) pandemic has left nations around the world scrambling to procure emergency healthcare capacity, services and equipment. To meet this unprecedented demand on global healthcare systems, governments are increasingly looking to partner with the private sector via public-private partnerships (PPPs). However, the protracted procedures of traditional PPP procurements are not suitable for times of crisis. This is where unsolicited proposals (USPs) may play a pivotal role. Design/methodology/approach To explore the relevance of USPs for the current pandemic, this Viewpoint paper describes both the advantages and challenges of USPs, discusses the emergence of several PPPs to combat COVID-19 as well as some of the ad hoc processes governing current USP consideration, highlights an example of streamlined USP solicitation from Pennsylvania’s Department of Transportation and articulates a pragmatic and practical approach for encouraging and procuring healthcare USPs. Findings This Viewpoint paper concludes that USPs could play a crucial role in the COVID-19 pandemic as boundary spanners between public agencies and the private sector in the PPP procurement process. Social implications Deploying proactive and strategic healthcare PPPs at speed and scale through digital USP platforms may help mitigate the pandemic’s long-term effects. Digital USP platforms may also serve as crucial tools for effective crisis communication, decision-making and partnership. Originality/value Using the digital USP platforms proposed in this paper, infrastructure organizations can develop and maintain effective partnerships with other sector organizations prior to and during crises like COVID-19.
{"title":"Procuring healthcare public-private partnerships (PPPs) through unsolicited proposals during the COVID-19 pandemic","authors":"Carter B. Casady, David Baxter","doi":"10.1108/JOPP-07-2020-0061","DOIUrl":"https://doi.org/10.1108/JOPP-07-2020-0061","url":null,"abstract":"\u0000Purpose\u0000The novel coronavirus (COVID-19) pandemic has left nations around the world scrambling to procure emergency healthcare capacity, services and equipment. To meet this unprecedented demand on global healthcare systems, governments are increasingly looking to partner with the private sector via public-private partnerships (PPPs). However, the protracted procedures of traditional PPP procurements are not suitable for times of crisis. This is where unsolicited proposals (USPs) may play a pivotal role.\u0000\u0000\u0000Design/methodology/approach\u0000To explore the relevance of USPs for the current pandemic, this Viewpoint paper describes both the advantages and challenges of USPs, discusses the emergence of several PPPs to combat COVID-19 as well as some of the ad hoc processes governing current USP consideration, highlights an example of streamlined USP solicitation from Pennsylvania’s Department of Transportation and articulates a pragmatic and practical approach for encouraging and procuring healthcare USPs.\u0000\u0000\u0000Findings\u0000This Viewpoint paper concludes that USPs could play a crucial role in the COVID-19 pandemic as boundary spanners between public agencies and the private sector in the PPP procurement process.\u0000\u0000\u0000Social implications\u0000Deploying proactive and strategic healthcare PPPs at speed and scale through digital USP platforms may help mitigate the pandemic’s long-term effects. Digital USP platforms may also serve as crucial tools for effective crisis communication, decision-making and partnership.\u0000\u0000\u0000Originality/value\u0000Using the digital USP platforms proposed in this paper, infrastructure organizations can develop and maintain effective partnerships with other sector organizations prior to and during crises like COVID-19.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":2.5,"publicationDate":"2021-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45533802","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}