Pub Date : 2024-02-19DOI: 10.1108/ecam-06-2023-0622
Chunmei Fan, Xiaoyue Li
PurposeThis study reveals the green building development path and analyzes the optimal government subsidy equilibrium through evolutionary game theory and numerical simulation. This was done to explore the feasible measures and optimal incentives to achieve higher levels of green building in China.Design/methodology/approachFirst, the practice of green building in China was analyzed, and the specific influencing factors and incentive measures for green building development were extracted. Second, China-specific evolutionary game models were constructed between developers and homebuyers under the market regulation and government incentive mechanism scenarios, and the evolutionary paths were analyzed. Finally, real-case numerical simulations were conducted, subsidy impacts were mainly analyzed and optimal subsidy equilibriums were solved.Findings(1) Simultaneously subsidizing developers and homebuyers proved to be the most effective measure to promote the sustainability of green buildings. (2) The sensitivity of developers and homebuyers to subsidies varied across scenarios, and the optimal subsidy level diminished marginally as building greenness and public awareness increased. (3) The optimal subsidy level for developers was intricately tied to the building greenness benchmark. A higher benchmark intensified the developer’s responsiveness to losses, at which point increasing subsidies were justified. Conversely, a reduction in subsidy might have been appropriate when the benchmark was set at a lower level.Practical implicationsThe expeditious advancement of green buildings holds paramount importance for the high-quality development of the construction industry. Nevertheless, the pace of green building expansion in China has experienced a recent deceleration. Drawing insights from the practices of green building in China, the exploration of viable strategies and the determination of optimal government subsidies stand as imperative initiatives. These endeavors aim to propel the acceleration of green building proliferation and materialize high-quality development at the earliest juncture possible.Originality/valueThe model is grounded in China’s green building practices, which makes the conclusions drawn more specific. Furthermore, research results provide practical references for governments to formulate green building incentive policies.
{"title":"Exploring effective incentive policies for sustainable development of green buildings in China: based on evolutionary game theory and numerical simulation analysis","authors":"Chunmei Fan, Xiaoyue Li","doi":"10.1108/ecam-06-2023-0622","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0622","url":null,"abstract":"PurposeThis study reveals the green building development path and analyzes the optimal government subsidy equilibrium through evolutionary game theory and numerical simulation. This was done to explore the feasible measures and optimal incentives to achieve higher levels of green building in China.Design/methodology/approachFirst, the practice of green building in China was analyzed, and the specific influencing factors and incentive measures for green building development were extracted. Second, China-specific evolutionary game models were constructed between developers and homebuyers under the market regulation and government incentive mechanism scenarios, and the evolutionary paths were analyzed. Finally, real-case numerical simulations were conducted, subsidy impacts were mainly analyzed and optimal subsidy equilibriums were solved.Findings(1) Simultaneously subsidizing developers and homebuyers proved to be the most effective measure to promote the sustainability of green buildings. (2) The sensitivity of developers and homebuyers to subsidies varied across scenarios, and the optimal subsidy level diminished marginally as building greenness and public awareness increased. (3) The optimal subsidy level for developers was intricately tied to the building greenness benchmark. A higher benchmark intensified the developer’s responsiveness to losses, at which point increasing subsidies were justified. Conversely, a reduction in subsidy might have been appropriate when the benchmark was set at a lower level.Practical implicationsThe expeditious advancement of green buildings holds paramount importance for the high-quality development of the construction industry. Nevertheless, the pace of green building expansion in China has experienced a recent deceleration. Drawing insights from the practices of green building in China, the exploration of viable strategies and the determination of optimal government subsidies stand as imperative initiatives. These endeavors aim to propel the acceleration of green building proliferation and materialize high-quality development at the earliest juncture possible.Originality/valueThe model is grounded in China’s green building practices, which makes the conclusions drawn more specific. Furthermore, research results provide practical references for governments to formulate green building incentive policies.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"2 11","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139958930","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2024-01-30DOI: 10.1108/ecam-10-2023-1050
F. A. Ghansah, Weisheng Lu
PurposeWhile the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.Design/methodology/approachThis is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.FindingsThe study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.Practical implicationsThe findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.Originality/valueThe study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from exper
{"title":"Managerial framework for quality assurance of cross-border construction logistics and supply chain during pandemic and post-pandemic: lessons from COVID-19 in the world’s factory","authors":"F. A. Ghansah, Weisheng Lu","doi":"10.1108/ecam-10-2023-1050","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1050","url":null,"abstract":"PurposeWhile the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.Design/methodology/approachThis is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.FindingsThe study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.Practical implicationsThe findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.Originality/valueThe study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from exper","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"169 ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140484137","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2024-01-26DOI: 10.1108/ecam-07-2023-0688
Kai Liu, Yuming Liu, Y. Kou
PurposeInter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important role in the construction of megaprojects, but the relationship between project governance and organizational collaboration is unclear. The purpose of this study is to explore the role paths of different project governance mechanisms in influencing the collaborative behaviors of stakeholders and collaborative performance and to elucidate the mechanism of project governance on inter-organizational collaboration.Design/methodology/approachA conceptual framework was developed based on a comprehensive literature review, termed the structural equation model (SEM). The hypotheses of the model were tested based on data obtained from a questionnaire survey of 235 experts with experience in megaprojects within the construction industry in China.FindingsThe results show that project governance positively contributes to the collaborative behavior of megaproject stakeholders and the collaborative performance of the project team. Collaborative behavior acts as a partial mediator between project governance and the collaborative performance of the megaproject inter-organization alliance. The complexity of the project modulates the relationship between the governance mechanism of the project and the collaborative behavior of the stakeholders, which affects the collaborative performance of the megaproject inter-organization alliance.Originality/valueThe findings provide theoretical and practical implications for promoting positive collaborative behavior among stakeholders in megaproject selection and improving the collaborative performance of megaproject inter-organization alliances.
{"title":"External drivers of inter-organizational collaboration in megaproject: a perspective based on project governance","authors":"Kai Liu, Yuming Liu, Y. Kou","doi":"10.1108/ecam-07-2023-0688","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0688","url":null,"abstract":"PurposeInter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important role in the construction of megaprojects, but the relationship between project governance and organizational collaboration is unclear. The purpose of this study is to explore the role paths of different project governance mechanisms in influencing the collaborative behaviors of stakeholders and collaborative performance and to elucidate the mechanism of project governance on inter-organizational collaboration.Design/methodology/approachA conceptual framework was developed based on a comprehensive literature review, termed the structural equation model (SEM). The hypotheses of the model were tested based on data obtained from a questionnaire survey of 235 experts with experience in megaprojects within the construction industry in China.FindingsThe results show that project governance positively contributes to the collaborative behavior of megaproject stakeholders and the collaborative performance of the project team. Collaborative behavior acts as a partial mediator between project governance and the collaborative performance of the megaproject inter-organization alliance. The complexity of the project modulates the relationship between the governance mechanism of the project and the collaborative behavior of the stakeholders, which affects the collaborative performance of the megaproject inter-organization alliance.Originality/valueThe findings provide theoretical and practical implications for promoting positive collaborative behavior among stakeholders in megaproject selection and improving the collaborative performance of megaproject inter-organization alliances.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"81 21","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139593487","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2024-01-23DOI: 10.1108/ecam-06-2023-0615
Xiaoxu Dang, Mengying Wang, Xiaopeng Deng, Hongtao Mao, Pengju He
PurposeCorporate social responsibility (CSR) practices frequently result in increased costs for Chinese international contractors (CICs), where profitability is the primary objective; therefore, internal corporate drivers and external pressures play a crucial role in encouraging them to engage in sustainable CSR practices. This study systematically examines the dynamic impact of internal and external stakeholders on the CSR practices of CICs.Design/methodology/approachThis study adopted a structural equation model (SEM) to identify and validate a correlation between stakeholders and CSR practices. Standardized causal coefficients estimated in SEM were used to construct a fuzzy cognitive map (FCM) model to illustrate the effect of stakeholders on CSR practices with linkage direction and weights. Predictive, diagnostic, and hybrid analyses were performed to dynamically model the variation in stakeholders on the evolution of CSR practices.FindingsThe empirical results demonstrate that (1) employee participation in CSR has the greatest impact on CSR practices, followed by CSR strategies, partner and customer expectations, and finally government regulations. (2) In the early stage of CSR fulfillment, CSR strategies have the greatest influence on CSR practices; in the later stage of CSR fulfillment, employee participation in CSR has the greatest influence on CSR practices. (3) In the long run, the most effective and economical integrated interventions are those that address employee participation in CSR, partner expectations and customer expectations, and intervention in CSR strategies is needed if the level of CSR practice needs to be improved in the short term.Originality/valueThis study contributes to the research on the influence mechanisms of CSR practices of CICs and systematically analyzes their dynamic influence on CSR practices of CICs from the perspective of stakeholders.
目的对于以盈利为首要目标的中国国际承包商(CIC)而言,企业社会责任(CSR)实践往往会导致成本增加;因此,企业内部驱动力和外部压力在鼓励其参与可持续的企业社会责任实践方面发挥着至关重要的作用。本研究系统地探讨了内部和外部利益相关者对中国国际承包商企业社会责任实践的动态影响。本研究采用结构方程模型(SEM)来识别和验证利益相关者与企业社会责任实践之间的相关性。利用 SEM 估算的标准化因果系数构建模糊认知图(FCM)模型,说明利益相关者对企业社会责任实践的影响,并标明联系方向和权重。实证结果表明:(1)员工参与企业社会责任对企业社会责任实践的影响最大,其次是企业社会责任战略、合作伙伴和客户期望,最后是政府法规。(2)在履行企业社会责任的早期阶段,企业社会责任战略对企业社会责任实践的影响最大;在履行企业社会责任的后期阶段,员工参与企业社会责任对企业社会责任实践的影响最大。(3)从长远来看,针对员工参与企业社会责任、合作伙伴期望和客户期望的综合干预最为有效和经济,如果需要在短期内提高企业社会责任实践水平,则需要对企业社会责任战略进行干预。
{"title":"What affects the corporate social responsibility practices of Chinese international contractors considering dynamic interactions? A hybrid structural equation modeling–fuzzy cognitive map approach","authors":"Xiaoxu Dang, Mengying Wang, Xiaopeng Deng, Hongtao Mao, Pengju He","doi":"10.1108/ecam-06-2023-0615","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0615","url":null,"abstract":"PurposeCorporate social responsibility (CSR) practices frequently result in increased costs for Chinese international contractors (CICs), where profitability is the primary objective; therefore, internal corporate drivers and external pressures play a crucial role in encouraging them to engage in sustainable CSR practices. This study systematically examines the dynamic impact of internal and external stakeholders on the CSR practices of CICs.Design/methodology/approachThis study adopted a structural equation model (SEM) to identify and validate a correlation between stakeholders and CSR practices. Standardized causal coefficients estimated in SEM were used to construct a fuzzy cognitive map (FCM) model to illustrate the effect of stakeholders on CSR practices with linkage direction and weights. Predictive, diagnostic, and hybrid analyses were performed to dynamically model the variation in stakeholders on the evolution of CSR practices.FindingsThe empirical results demonstrate that (1) employee participation in CSR has the greatest impact on CSR practices, followed by CSR strategies, partner and customer expectations, and finally government regulations. (2) In the early stage of CSR fulfillment, CSR strategies have the greatest influence on CSR practices; in the later stage of CSR fulfillment, employee participation in CSR has the greatest influence on CSR practices. (3) In the long run, the most effective and economical integrated interventions are those that address employee participation in CSR, partner expectations and customer expectations, and intervention in CSR strategies is needed if the level of CSR practice needs to be improved in the short term.Originality/valueThis study contributes to the research on the influence mechanisms of CSR practices of CICs and systematically analyzes their dynamic influence on CSR practices of CICs from the perspective of stakeholders.","PeriodicalId":504601,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"76 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139603690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}