Factors Influencing Stakeholder Management in Building Projects Procured by Private Corporate Organisations 影响私营企业建筑项目利益相关者管理的因素
Q2 Business, Management and Accounting Pub Date : 2020-09-08 DOI: 10.2478/jeppm-2021-0002
N. Olatunde, H. Odeyinka
Abstract Stakeholder management (SM) is of utmost importance in ensuring timely project delivery, delivery within budget, to the right quality level and to client’s satisfaction. Private corporate organizations have limited resources and so could not afford project cost or time overrun and other issues that could impact project success. While studies are available that examined factors impacting stakeholder management in public building projects, there is a paucity of research on factors influencing stakeholder management in building projects procured by private corporate organizations; hence this study. The objective of the reported study is to assess the factors influencing SM in building projects procured by private corporate organizations in Southwestern Nigeria with a view to enhancing project delivery. The data for the study were collected using a structured questionnaire survey. Purposive sampling technique was used to select project managers (PMs) and client representatives (CRs) that were involved in the management of building projects procured by private corporate organizations between 2008 and 2017. A total of 106 questionnaires were received from PMs and CRs that responded to the questionnaire survey. The data collected were analysed using mean score (MS) analysis, Student’s t-test and factor analysis. The result shows that the most important factors influencing SM comprise of ‘maintaining good relationships with stakeholders’, ‘addressing stakeholders’ concerns and needs’ and ‘avenue for communicating project impacts’. The further result using factor analysis shows that the factors influencing SM could be categorized into six component groupings of - project relationship, information input, stakeholder estimation, decision-making, sustainable support and external project relationship awareness. The study concluded that project managers need to pay attention to the identified topranking factors in order to achieve improved project delivery.
摘要干系人管理(SM)对于确保项目按时交付、在预算范围内交付、达到适当的质量水平和客户满意度至关重要。私人公司组织的资源有限,因此无法承担项目成本或时间超支以及其他可能影响项目成功的问题。虽然已有研究考察了公共建筑项目中影响利益相关者管理的因素,但对私营企业组织采购的建筑项目中影响利益相关者管理的因素的研究较少;因此进行了这项研究。报告的研究目的是评估影响尼日利亚西南部私营企业组织采购的建筑项目中SM的因素,以期加强项目交付。该研究的数据是通过结构化问卷调查收集的。采用有目的抽样技术选择2008年至2017年期间参与私营企业组织采购的建筑项目管理的项目经理(pm)和客户代表(cr)。共有106份问卷来自pm和cr,他们对问卷调查做出了回应。采用均分(MS)分析、学生t检验和因子分析对收集到的数据进行分析。结果表明,影响SM的最重要因素包括“与利益相关者保持良好的关系”、“解决利益相关者的关注和需求”和“沟通项目影响的途径”。因子分析结果表明,影响项目管理的因素可分为项目关系、信息输入、利益相关者评估、决策、可持续支持和外部项目关系意识六个组成部分。该研究得出结论,项目经理需要关注已确定的排名因素,以实现改进的项目交付。
{"title":"Factors Influencing Stakeholder Management in Building Projects Procured by Private Corporate Organisations","authors":"N. Olatunde, H. Odeyinka","doi":"10.2478/jeppm-2021-0002","DOIUrl":"https://doi.org/10.2478/jeppm-2021-0002","url":null,"abstract":"Abstract Stakeholder management (SM) is of utmost importance in ensuring timely project delivery, delivery within budget, to the right quality level and to client’s satisfaction. Private corporate organizations have limited resources and so could not afford project cost or time overrun and other issues that could impact project success. While studies are available that examined factors impacting stakeholder management in public building projects, there is a paucity of research on factors influencing stakeholder management in building projects procured by private corporate organizations; hence this study. The objective of the reported study is to assess the factors influencing SM in building projects procured by private corporate organizations in Southwestern Nigeria with a view to enhancing project delivery. The data for the study were collected using a structured questionnaire survey. Purposive sampling technique was used to select project managers (PMs) and client representatives (CRs) that were involved in the management of building projects procured by private corporate organizations between 2008 and 2017. A total of 106 questionnaires were received from PMs and CRs that responded to the questionnaire survey. The data collected were analysed using mean score (MS) analysis, Student’s t-test and factor analysis. The result shows that the most important factors influencing SM comprise of ‘maintaining good relationships with stakeholders’, ‘addressing stakeholders’ concerns and needs’ and ‘avenue for communicating project impacts’. The further result using factor analysis shows that the factors influencing SM could be categorized into six component groupings of - project relationship, information input, stakeholder estimation, decision-making, sustainable support and external project relationship awareness. The study concluded that project managers need to pay attention to the identified topranking factors in order to achieve improved project delivery.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"18 - 9"},"PeriodicalIF":0.0,"publicationDate":"2020-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45899118","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Bill of Material and Labour Template for Construction Information Management 用于建筑信息管理的材料和人工清单模板
Q2 Business, Management and Accounting Pub Date : 2020-09-08 DOI: 10.2478/jeppm-2021-0006
O. Akinradewo, O. Awodele, O. Akinradewo
Abstract Information and Communication Technology advancement has made the method of practice across different industries and businesses record fundamental changes in various dimensions and levels. The construction industry is determined to measure up with other industries in this and has since embraced the use of computer software to perform most, if not all of its activities. It is generally known that this software is not cheap and they require special skill to use. This research study is aimed at developing a computerised template for material and labour schedules for some selected items of work in construction using Microsoft Excel. This is an inexpensive way of estimating to save cost while eliminating the traditional method. The study adopted a mixed research method that involved observation of labourers on-site and validation through a questionnaire survey. The personal observation was carried out and labour outputs were recorded which was used together with material constants in developing the bill of material and labour template. The template was validated by practising Quantity Surveyors for ongoing projects and an average of 92% accuracy was recorded. It was concluded that the template can enhance the accuracy of Quantity Surveyors’ estimate of materials and labour for construction projects.
摘要信息通信技术的进步,使得各行各业的实践方法在各个维度和层次上都发生了根本性的变化。建筑业决心在这方面与其他行业看齐,并从那时起开始使用计算机软件来执行大部分(如果不是全部的话)活动。众所周知,这种软件并不便宜,需要特殊的技能才能使用。本研究的目的是开发一个电脑化的模板材料和劳动时间表的一些选定项目的工作在建筑使用微软Excel。这是一种廉价的估算方法,可以在消除传统方法的同时节省成本。本研究采用现场观察与问卷调查相结合的研究方法。进行了个人观察并记录了劳动产出,这与材料常数一起用于开发材料清单和劳动模板。该模板由执业工料测量师为进行中的工程进行验证,平均准确率为92%。结果表明,该模板可以提高工料师对建筑工程材料和人工估算的准确性。
{"title":"Bill of Material and Labour Template for Construction Information Management","authors":"O. Akinradewo, O. Awodele, O. Akinradewo","doi":"10.2478/jeppm-2021-0006","DOIUrl":"https://doi.org/10.2478/jeppm-2021-0006","url":null,"abstract":"Abstract Information and Communication Technology advancement has made the method of practice across different industries and businesses record fundamental changes in various dimensions and levels. The construction industry is determined to measure up with other industries in this and has since embraced the use of computer software to perform most, if not all of its activities. It is generally known that this software is not cheap and they require special skill to use. This research study is aimed at developing a computerised template for material and labour schedules for some selected items of work in construction using Microsoft Excel. This is an inexpensive way of estimating to save cost while eliminating the traditional method. The study adopted a mixed research method that involved observation of labourers on-site and validation through a questionnaire survey. The personal observation was carried out and labour outputs were recorded which was used together with material constants in developing the bill of material and labour template. The template was validated by practising Quantity Surveyors for ongoing projects and an average of 92% accuracy was recorded. It was concluded that the template can enhance the accuracy of Quantity Surveyors’ estimate of materials and labour for construction projects.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"52 - 60"},"PeriodicalIF":0.0,"publicationDate":"2020-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"69219520","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Effect of Emotional Intelligence and Leadership Styles on Risk Intelligent Decision Making and Risk Management 情绪智力和领导风格对风险智能决策和风险管理的影响
Q2 Business, Management and Accounting Pub Date : 2020-09-08 DOI: 10.2478/jeppm-2021-0008
Jayet Moon
Abstract In today’s world, uncertainty abounds. It is therefore incumbent on managers to take decisions using unbiased considerations in dealing with organizational risks. Often, risk decisions are replete with assumptions and biases, leading to incorrect decisions. Leaders who apply emotional intelligence (EI) skills are better poised to challenge internal biases and assumptions to improve decision-making, but limited empirical evidence exists that accounts for the nexus between EI, leadership styles and risk perceptions of managers. The purpose of the paper was to explore the relevance of the theory of EI in risk-based decision-making, while comparing various leadership styles. The research adopted a questionnaire survey administered to 173 employed individuals. The research hypotheses analyzed the mediating roles of EI and leadership styles in risk perceptions using ‘t’ statistic and where applicable, Chi-square testing. The results of the analysis confirmed the role of EI in filtering deleterious internal biases and confirmed EI’s presence as a success factor in leadership and decision-making. Transformational leaders are, however, more emotionally intelligent and less biased. These attributes allow for the generation of a suitable risk attitude and enhance risk-intelligent decisions as compared to transactional leaders. This study, while being descriptive, is exploratory in nature and opens pathways for further targeted research based on specific EI abilities or traits and various situational risk attitudes.
当今世界充满了不确定性。因此,在处理组织风险时,管理人员有责任使用公正的考虑来做出决策。通常,风险决策充满了假设和偏见,导致了不正确的决策。运用情商(EI)技能的领导者能够更好地挑战内部偏见和假设,以改善决策,但有限的经验证据可以解释EI、领导风格和管理者风险感知之间的联系。本文的目的是探讨EI理论在风险决策中的相关性,同时比较不同的领导风格。本研究采用问卷调查法对173名在职人员进行调查。研究假设分析了EI和领导风格在风险感知中的中介作用,使用“t”统计和适用的卡方检验。分析结果证实了EI在过滤有害的内部偏见方面的作用,并证实了EI在领导和决策中作为成功因素的存在。然而,变革型领导者情商更高,偏见更少。与事务型领导者相比,这些属性允许产生适当的风险态度,并增强风险智能决策。这项研究虽然是描述性的,但本质上是探索性的,并为进一步基于特定的EI能力或特征以及各种情境风险态度的针对性研究开辟了道路。
{"title":"Effect of Emotional Intelligence and Leadership Styles on Risk Intelligent Decision Making and Risk Management","authors":"Jayet Moon","doi":"10.2478/jeppm-2021-0008","DOIUrl":"https://doi.org/10.2478/jeppm-2021-0008","url":null,"abstract":"Abstract In today’s world, uncertainty abounds. It is therefore incumbent on managers to take decisions using unbiased considerations in dealing with organizational risks. Often, risk decisions are replete with assumptions and biases, leading to incorrect decisions. Leaders who apply emotional intelligence (EI) skills are better poised to challenge internal biases and assumptions to improve decision-making, but limited empirical evidence exists that accounts for the nexus between EI, leadership styles and risk perceptions of managers. The purpose of the paper was to explore the relevance of the theory of EI in risk-based decision-making, while comparing various leadership styles. The research adopted a questionnaire survey administered to 173 employed individuals. The research hypotheses analyzed the mediating roles of EI and leadership styles in risk perceptions using ‘t’ statistic and where applicable, Chi-square testing. The results of the analysis confirmed the role of EI in filtering deleterious internal biases and confirmed EI’s presence as a success factor in leadership and decision-making. Transformational leaders are, however, more emotionally intelligent and less biased. These attributes allow for the generation of a suitable risk attitude and enhance risk-intelligent decisions as compared to transactional leaders. This study, while being descriptive, is exploratory in nature and opens pathways for further targeted research based on specific EI abilities or traits and various situational risk attitudes.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"71 - 81"},"PeriodicalIF":0.0,"publicationDate":"2020-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45139961","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Disputes in Construction Industry: Owners and Contractors’ Views on Causes and Remedies 建筑业纠纷:业主和承包商对原因和补救的看法
Q2 Business, Management and Accounting Pub Date : 2020-09-08 DOI: 10.2478/jeppm-2021-0005
A. Shash, S. I. Habash
Abstract The construction industry is prone to conflicts and disputes due to complexity, competitive environment, and complicated project documents. In this complex environment, members from various professions, each has their goals and desires to secure the most of his own benefits, work together to build a structure. The objectives of this study were to investigate the frequency, causes, and remedies of disputes in the Central Province of Saudi Arabia. The required data were collected, through a questionnaire survey, from 130 contractors and 54 owners located in the Central Province. This study reveals that disputes in the Saudi construction industry are inevitable with a frequency of occurrence exceeds two disputes per month. Project documents, owners, and contractors to some extent are the sources for such disputes. Project documents are poorly prepared with inaccurate specifications, ambiguity in contract wording, contradictions between project documents, unrealistic project duration, the inaccurate bell of quantities (BOQ), and weakness in contract language. Owners cause great disputes through sizable variation orders exceeding allowable limits, changing item descriptions and quantities in BOQ, interfering in the execution of the contract, and delaying responses to requested information/approvals. Contractors cause disputes through poor contract administration. Contractors follow a combined strategy (mitigating disputes and holding only the disputed work area only) and owners either mitigate disputes or hold disputed scopes. Government owners mostly mitigating disputes and, conversely, private owners hold the disputed scope and continue with the rest of the project. This study is believed to contribute to the current body of knowledge in disputes and contractors and owners by providing effective mitigation techniques that will assist them in minimizing the negative impacts of disputes.
摘要建筑业因其复杂性、竞争环境和复杂的工程文件而容易发生冲突和纠纷。在这种复杂的环境中,来自不同职业的成员,每个人都有自己的目标和愿望,以确保自己的最大利益,共同努力建立一个结构。本研究的目的是调查沙特阿拉伯中央省争端的频率、原因和补救措施。所需数据是通过问卷调查从位于中部省的130名承包商和54名业主那里收集的。这项研究表明,沙特建筑业的纠纷是不可避免的,每月发生的频率超过两起。项目文件、业主和承包商在某种程度上是此类争议的来源。项目文件编制不善,规范不准确,合同措辞含糊不清,项目文件之间存在矛盾,项目工期不切实际,工程量清单不准确,以及合同语言薄弱。业主通过超出允许范围的大量变更单、更改工程量清单中的项目描述和数量、干扰合同执行以及延迟对所需信息/批准的响应,引发巨大争议。承包商因合同管理不善而引发纠纷。承包商遵循一种综合策略(缓解争议和仅控制有争议的工作区域),业主要么缓解争议,要么控制有争议范围。政府业主大多会减轻争议,相反,私人业主则持有有争议的范围,并继续进行项目的其余部分。据信,这项研究通过提供有效的缓解技术,帮助承包商和业主最大限度地减少纠纷的负面影响,有助于提高当前对纠纷、承包商和业主的认识。
{"title":"Disputes in Construction Industry: Owners and Contractors’ Views on Causes and Remedies","authors":"A. Shash, S. I. Habash","doi":"10.2478/jeppm-2021-0005","DOIUrl":"https://doi.org/10.2478/jeppm-2021-0005","url":null,"abstract":"Abstract The construction industry is prone to conflicts and disputes due to complexity, competitive environment, and complicated project documents. In this complex environment, members from various professions, each has their goals and desires to secure the most of his own benefits, work together to build a structure. The objectives of this study were to investigate the frequency, causes, and remedies of disputes in the Central Province of Saudi Arabia. The required data were collected, through a questionnaire survey, from 130 contractors and 54 owners located in the Central Province. This study reveals that disputes in the Saudi construction industry are inevitable with a frequency of occurrence exceeds two disputes per month. Project documents, owners, and contractors to some extent are the sources for such disputes. Project documents are poorly prepared with inaccurate specifications, ambiguity in contract wording, contradictions between project documents, unrealistic project duration, the inaccurate bell of quantities (BOQ), and weakness in contract language. Owners cause great disputes through sizable variation orders exceeding allowable limits, changing item descriptions and quantities in BOQ, interfering in the execution of the contract, and delaying responses to requested information/approvals. Contractors cause disputes through poor contract administration. Contractors follow a combined strategy (mitigating disputes and holding only the disputed work area only) and owners either mitigate disputes or hold disputed scopes. Government owners mostly mitigating disputes and, conversely, private owners hold the disputed scope and continue with the rest of the project. This study is believed to contribute to the current body of knowledge in disputes and contractors and owners by providing effective mitigation techniques that will assist them in minimizing the negative impacts of disputes.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"37 - 51"},"PeriodicalIF":0.0,"publicationDate":"2020-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44487407","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Strategies for Communicating Health and Safety Information on Construction 建筑健康与安全信息交流策略
Q2 Business, Management and Accounting Pub Date : 2020-09-08 DOI: 10.2478/jeppm-2021-0001
R. T. Adebiyi, A. Rasheed
Abstract Accidents are common problems on construction sites globally. The occurrence of these accidents usually leads to loss of time and productivity of site personnel, payments for treatment of the injured and burial expenses for the dead. Previous studies identified poor communication of information on Health and Safety as one of the major causes of accidents on construction sites. This study examined and analyzed the strategies for communication. Mean and standard deviations were used to analyze the strategies. The opinions of supervisors and operatives were tested through an independent t-test and Spearman’s rank correlation. Findings revealed project briefings, operating procedures, and safety manuals as the most frequently used communication strategies. No significant differences exist between the two groups of respondents in their rankings. The correlation coefficient revealed a positive relationship. In other words, respondents concurred in their opinions regarding these communication strategies. This paper, therefore, recommends the adoption of significant strategies identified in this study. In addition, future research can be conducted in other countries in order to explore the research area globally.
摘要事故是全球建筑工地上常见的问题。这些事故的发生通常会导致现场人员的时间和生产力损失、受伤人员的治疗费用和死者的安葬费用。先前的研究表明,健康与安全信息沟通不畅是建筑工地事故的主要原因之一。本研究对交际策略进行了考察和分析。平均值和标准差用于分析策略。监管人员和操作人员的意见通过独立t检验和Spearman等级相关性进行检验。调查结果显示,项目简报、操作程序和安全手册是最常用的沟通策略。两组受访者的排名没有显著差异。相关系数呈正相关。换言之,受访者同意他们对这些沟通策略的看法。因此,本文建议采用本研究中确定的重要策略。此外,未来的研究可以在其他国家进行,以便在全球范围内探索研究领域。
{"title":"Strategies for Communicating Health and Safety Information on Construction","authors":"R. T. Adebiyi, A. Rasheed","doi":"10.2478/jeppm-2021-0001","DOIUrl":"https://doi.org/10.2478/jeppm-2021-0001","url":null,"abstract":"Abstract Accidents are common problems on construction sites globally. The occurrence of these accidents usually leads to loss of time and productivity of site personnel, payments for treatment of the injured and burial expenses for the dead. Previous studies identified poor communication of information on Health and Safety as one of the major causes of accidents on construction sites. This study examined and analyzed the strategies for communication. Mean and standard deviations were used to analyze the strategies. The opinions of supervisors and operatives were tested through an independent t-test and Spearman’s rank correlation. Findings revealed project briefings, operating procedures, and safety manuals as the most frequently used communication strategies. No significant differences exist between the two groups of respondents in their rankings. The correlation coefficient revealed a positive relationship. In other words, respondents concurred in their opinions regarding these communication strategies. This paper, therefore, recommends the adoption of significant strategies identified in this study. In addition, future research can be conducted in other countries in order to explore the research area globally.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"1 - 8"},"PeriodicalIF":0.0,"publicationDate":"2020-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49595183","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Construction Contract Conversion: An Approach to Resolve Disputes 施工合同转换:解决纠纷的一种途径
Q2 Business, Management and Accounting Pub Date : 2020-06-08 DOI: 10.2478/jeppm-2020-0018
A. Shash, S. I. Habash
Abstract A construction contract is a mechanism to bind a project owner and a contractor in a legal agreement to construct a project against a designated monitory consideration. However, projects are usually assembled over a long period with high uncertainty and complexity. Under such a dynamic business transaction, current static contracts fail to arrange for an appropriate and stable transaction. This paper reveals, through a questionnaire survey that was sent to all grade1 and 2 contractors and all owners in Riyadh-Saudi Arabia, the most common construction contracts in Saudi Arabia and the use, causes and benefits of contract conversion. The lump sum and the unit price are the most dominant type of contracts. Owners who select the former convert them during construction to unit price contracts leading to considerable benefits to contract parties including successful project completion with negligible disputes and better relationship. Owners are advised to include a clause in the construction contract to give them the privilege, not the obligation to convert the contract from one type to another.
摘要施工合同是一种在法律协议中约束项目业主和承包商的机制,以在指定的监督对价下建造项目。然而,项目通常是在很长一段时间内完成的,具有很高的不确定性和复杂性。在这样一个动态的商业交易中,当前的静态合约无法安排一个合适且稳定的交易。本文通过向沙特阿拉伯利雅得的所有一级和二级承包商和所有业主发送的问卷调查,揭示了沙特阿拉伯最常见的建筑合同以及合同转换的用途、原因和好处。总价和单价是最主要的合同类型。选择前者的业主在施工期间将其转换为单价合同,为合同方带来了可观的利益,包括成功完成项目,争议可以忽略不计,关系更好。建议业主在施工合同中加入一项条款,赋予他们特权,而不是将合同从一种类型转换为另一种类型的义务。
{"title":"Construction Contract Conversion: An Approach to Resolve Disputes","authors":"A. Shash, S. I. Habash","doi":"10.2478/jeppm-2020-0018","DOIUrl":"https://doi.org/10.2478/jeppm-2020-0018","url":null,"abstract":"Abstract A construction contract is a mechanism to bind a project owner and a contractor in a legal agreement to construct a project against a designated monitory consideration. However, projects are usually assembled over a long period with high uncertainty and complexity. Under such a dynamic business transaction, current static contracts fail to arrange for an appropriate and stable transaction. This paper reveals, through a questionnaire survey that was sent to all grade1 and 2 contractors and all owners in Riyadh-Saudi Arabia, the most common construction contracts in Saudi Arabia and the use, causes and benefits of contract conversion. The lump sum and the unit price are the most dominant type of contracts. Owners who select the former convert them during construction to unit price contracts leading to considerable benefits to contract parties including successful project completion with negligible disputes and better relationship. Owners are advised to include a clause in the construction contract to give them the privilege, not the obligation to convert the contract from one type to another.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"162 - 169"},"PeriodicalIF":0.0,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44834412","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Investigation and Comparative Analysis of Learning Curve Models on Construction Productivity: The Case of Caisson Fabrication Process 施工生产率学习曲线模型的调查与比较分析——以沉箱制造工艺为例
Q2 Business, Management and Accounting Pub Date : 2020-06-08 DOI: 10.2478/jeppm-2020-0024
Panagiota Ralli, A. Panas, J. Pantouvakis, Dimitrios Karagiannakidis
Abstract Learning curves in construction operations analysis is deemed as one of the main factors that determine the variation of on-site productivity and is always taken into account during the planning and estimation stage. This research attempts the assessment of learning curve models’ suitability for the effective analysis of the learning phenomenon for construction operations that are fairly complicated concerning a floating caisson fabrication process for a large-scale marine project, using productivity data. This paper investigates the role of published learning curve models (i.e. Straightline or Wright; Stanford “B”; Cubic; Piecewise or Stepwise; Exponential) by comparing their outcomes through the use of both unit and cumulative productivity data. There are two main research objectives: first, the model best fitting historical productivity data of construction activities that have been completed are investigated, while secondly, an attempt is made to determine which model better predicts future performance. The less actual construction data deviate from each model’s yielded results, the better their suitability. In the case of unit data, the cubic model fits better historical data, while in the case of future predictions, the Stanford “B” model provides better results. Respectively, the Cubic model yields better results when using cumulative data on historical data and the Straight-line model predicts in a more reliable fashion future performance Possible extensions could be developed in the area of future performance predictions, by adopting different data representation techniques (e.g. moving/exponential weighted average) or by including other (non-classic) learning curve models (e.g. DeJong, Knecht, hyperbolic models).
摘要施工作业分析中的学习曲线被认为是决定现场生产力变化的主要因素之一,在规划和估算阶段总是被考虑在内。本研究试图利用生产力数据,评估学习曲线模型是否适合于有效分析大型海洋项目浮式沉箱制造过程中相当复杂的施工作业的学习现象。本文通过使用单位生产率和累积生产率数据对已发表的学习曲线模型(即直线或赖特;斯坦福“B”;三次;分段或逐步;指数)的结果进行比较,研究了它们的作用。主要有两个研究目标:首先,调查最适合已完成建筑活动的历史生产力数据的模型,其次,尝试确定哪个模型能更好地预测未来的表现。实际施工数据与每个模型得出的结果的偏差越小,其适用性就越好。在单位数据的情况下,三次模型适合更好的历史数据,而在未来预测的情况中,斯坦福“B”模型提供了更好的结果。分别地,当使用历史数据的累积数据时,三次模型产生更好的结果,而直线模型以更可靠的方式预测未来性能。可以在未来性能预测领域开发可能的扩展,通过采用不同的数据表示技术(例如移动/指数加权平均)或通过包括其他(非经典)学习曲线模型(例如DeJong、Knecht、双曲线模型)。
{"title":"Investigation and Comparative Analysis of Learning Curve Models on Construction Productivity: The Case of Caisson Fabrication Process","authors":"Panagiota Ralli, A. Panas, J. Pantouvakis, Dimitrios Karagiannakidis","doi":"10.2478/jeppm-2020-0024","DOIUrl":"https://doi.org/10.2478/jeppm-2020-0024","url":null,"abstract":"Abstract Learning curves in construction operations analysis is deemed as one of the main factors that determine the variation of on-site productivity and is always taken into account during the planning and estimation stage. This research attempts the assessment of learning curve models’ suitability for the effective analysis of the learning phenomenon for construction operations that are fairly complicated concerning a floating caisson fabrication process for a large-scale marine project, using productivity data. This paper investigates the role of published learning curve models (i.e. Straightline or Wright; Stanford “B”; Cubic; Piecewise or Stepwise; Exponential) by comparing their outcomes through the use of both unit and cumulative productivity data. There are two main research objectives: first, the model best fitting historical productivity data of construction activities that have been completed are investigated, while secondly, an attempt is made to determine which model better predicts future performance. The less actual construction data deviate from each model’s yielded results, the better their suitability. In the case of unit data, the cubic model fits better historical data, while in the case of future predictions, the Stanford “B” model provides better results. Respectively, the Cubic model yields better results when using cumulative data on historical data and the Straight-line model predicts in a more reliable fashion future performance Possible extensions could be developed in the area of future performance predictions, by adopting different data representation techniques (e.g. moving/exponential weighted average) or by including other (non-classic) learning curve models (e.g. DeJong, Knecht, hyperbolic models).","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"219 - 230"},"PeriodicalIF":0.0,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46112557","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Labor Productivity Improvement Obtained by Masonry Walls Project Design Implementation 砖墙工程设计实施对劳动生产率的提高
Q2 Business, Management and Accounting Pub Date : 2020-06-08 DOI: 10.2478/jeppm-2020-0022
F. Santos, Livia B. Agostinho, L. Araújo, L. A. Aidar, Ana Beatriz Souza Piña, M. Carvalho
Abstract This paper aims to quantify the labor productivity improvement reached by the implementation of a masonry wall project design to guide field construction. A masonry wall project design is an instrument of rationalization, developed to specify the layout and steps of a masonry walls execution. The methodology is of quantitative nature and involves a practical case. The work of an enterprise in Goiânia (Brazil) was tracked by the collection of productivity data, firstly of a crew that didn’t have access to a masonry wall project design, and then of a crew that had access to the project. The evaluation of the productivity improvement was processed by means of statistical analysis, such as location and dispersion measures, average and variance, T-test, and F-value. Hypothesis tests were also performed to prove that the changes in productivity were caused by the implementation of the masonry project. The results showed that the project deployment optimized the production process in the field. There was a 26% increase in the team average productivity with access to the project design according to the hypothesis tests. The main contribution of this work is to present the beneficial impact of a masonry wall project design tailored for field construction, which allows a formal and rational approach to a heavily artisanal technique.
摘要本文旨在量化某砌体墙体工程设计实施后劳动生产率的提高,以指导现场施工。砌体墙工程设计是一种合理化的工具,用于指定砌体墙施工的布局和步骤。该方法是定量的,并涉及一个实际案例。goi尼亚(巴西)的一家企业的工作是通过收集生产力数据来跟踪的,首先是一个没有接触过砖石墙项目设计的团队,然后是一个接触过项目的团队。采用区位与离散测度、平均与方差、t检验、f值等统计分析方法对生产率改进进行评价。还进行了假设检验,以证明生产力的变化是由砌体工程的实施引起的。结果表明,项目部署优化了该油田的生产流程。根据假设检验,通过访问项目设计,团队的平均生产力提高了26%。这项工作的主要贡献是展示了为现场施工量身定制的砖石墙项目设计的有益影响,它允许正式和合理的方法来处理大量的手工技术。
{"title":"Labor Productivity Improvement Obtained by Masonry Walls Project Design Implementation","authors":"F. Santos, Livia B. Agostinho, L. Araújo, L. A. Aidar, Ana Beatriz Souza Piña, M. Carvalho","doi":"10.2478/jeppm-2020-0022","DOIUrl":"https://doi.org/10.2478/jeppm-2020-0022","url":null,"abstract":"Abstract This paper aims to quantify the labor productivity improvement reached by the implementation of a masonry wall project design to guide field construction. A masonry wall project design is an instrument of rationalization, developed to specify the layout and steps of a masonry walls execution. The methodology is of quantitative nature and involves a practical case. The work of an enterprise in Goiânia (Brazil) was tracked by the collection of productivity data, firstly of a crew that didn’t have access to a masonry wall project design, and then of a crew that had access to the project. The evaluation of the productivity improvement was processed by means of statistical analysis, such as location and dispersion measures, average and variance, T-test, and F-value. Hypothesis tests were also performed to prove that the changes in productivity were caused by the implementation of the masonry project. The results showed that the project deployment optimized the production process in the field. There was a 26% increase in the team average productivity with access to the project design according to the hypothesis tests. The main contribution of this work is to present the beneficial impact of a masonry wall project design tailored for field construction, which allows a formal and rational approach to a heavily artisanal technique.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"200 - 210"},"PeriodicalIF":0.0,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41476659","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Health and Safety in Crowded Large Size Buildings: The Effect of Perceived Safety on User Behaviour in the Holy Mosque 拥挤的大型建筑中的健康与安全:神圣清真寺内感知安全对用户行为的影响
Q2 Business, Management and Accounting Pub Date : 2020-06-08 DOI: 10.2478/jeppm-2020-0019
K. Gidado, Mohammed Alkhadim
Abstract Crowded large space buildings are today becoming highly desirable facilities for communities, towns, and cities. Due to stricter health, safety requirements, and environmental effects, such buildings are of greater interest for research. The buildings are used for a variety of functions, including sporting, entertainment, and religious events. The Holy Mosque in Makkah Saudi Arabia is an excellent example of a crowded large space building with a maximum capacity reaching up to 2 million users, especially at the Hajj and Ramadan periods. Quite often, designer and facility managers of crowded large space buildings pay keen attention to normative and substantive (objective) safety, but research shows that perceived (subjective) safety which should also be important, is clear overlooked. To prove the significance of perceived safety, a theory has been adopted, which states that a reduction in perceived safety (PS) will negatively affect the user behaviour (UB) resulting in the occurrence of a disaster in crowded large size buildings. Initial research undertaken by the authors have identified 10 key factors affecting subjective safety in crowded large space buildings, this stage of the study is an empirical study to aimed at establishing how significant each factor affects PS and the effect of perceived safety on the UB in such types of buildings. The Holy Mosque was used as a case study. The research adopted the quantitative research methodology by collecting primary data using a group-administered questionnaire in electronic devices such as iPad from more than 1,940 Hajj pilgrims coming from 62 countries. This was analysed by SPSS and AMOS 22 for confirmatory factor analysis (CFA) and structural equation modeling (SEM) to test the interrelationships between the 10 identified factors and PS or between PS and UB through several hypotheses. The research has demonstrated that there is a significant influence on PS by most of the established factors and that PS has a significant influence on the behaviour of pilgrims in the Holy Mosque.
如今,拥挤的大空间建筑已成为社区、城镇和城市中非常理想的设施。由于更严格的健康、安全要求和环境影响,这类建筑的研究更有兴趣。这些建筑用于各种功能,包括体育、娱乐和宗教活动。沙特阿拉伯麦加的神圣清真寺是一个拥挤的大空间建筑的绝佳例子,最大容量可达200万用户,特别是在朝觐和斋月期间。很多时候,拥挤的大空间建筑的设计师和设施管理人员非常关注规范和实质性(客观)安全,但研究表明,感知(主观)安全也应该很重要,但显然被忽视了。为了证明感知安全的重要性,采用了一种理论,该理论认为感知安全(PS)的降低会对用户行为(UB)产生负面影响,从而导致拥挤的大型建筑物发生灾难。作者进行的初步研究已经确定了影响拥挤大空间建筑主观安全的10个关键因素,本阶段的研究是一项实证研究,旨在确定每个因素对此类建筑中PS的影响程度以及感知安全对UB的影响程度。圣清真寺被用作案例研究。该研究采用定量研究方法,通过iPad等电子设备对来自62个国家的1,940多名朝觐朝圣者进行小组问卷调查,收集原始数据。通过SPSS和AMOS 22进行验证性因子分析(CFA)和结构方程模型(SEM)分析,通过几个假设检验10个确定的因素与PS之间或PS与UB之间的相互关系。研究表明,大多数既定因素对PS有重大影响,PS对神圣清真寺朝圣者的行为有重大影响。
{"title":"Health and Safety in Crowded Large Size Buildings: The Effect of Perceived Safety on User Behaviour in the Holy Mosque","authors":"K. Gidado, Mohammed Alkhadim","doi":"10.2478/jeppm-2020-0019","DOIUrl":"https://doi.org/10.2478/jeppm-2020-0019","url":null,"abstract":"Abstract Crowded large space buildings are today becoming highly desirable facilities for communities, towns, and cities. Due to stricter health, safety requirements, and environmental effects, such buildings are of greater interest for research. The buildings are used for a variety of functions, including sporting, entertainment, and religious events. The Holy Mosque in Makkah Saudi Arabia is an excellent example of a crowded large space building with a maximum capacity reaching up to 2 million users, especially at the Hajj and Ramadan periods. Quite often, designer and facility managers of crowded large space buildings pay keen attention to normative and substantive (objective) safety, but research shows that perceived (subjective) safety which should also be important, is clear overlooked. To prove the significance of perceived safety, a theory has been adopted, which states that a reduction in perceived safety (PS) will negatively affect the user behaviour (UB) resulting in the occurrence of a disaster in crowded large size buildings. Initial research undertaken by the authors have identified 10 key factors affecting subjective safety in crowded large space buildings, this stage of the study is an empirical study to aimed at establishing how significant each factor affects PS and the effect of perceived safety on the UB in such types of buildings. The Holy Mosque was used as a case study. The research adopted the quantitative research methodology by collecting primary data using a group-administered questionnaire in electronic devices such as iPad from more than 1,940 Hajj pilgrims coming from 62 countries. This was analysed by SPSS and AMOS 22 for confirmatory factor analysis (CFA) and structural equation modeling (SEM) to test the interrelationships between the 10 identified factors and PS or between PS and UB through several hypotheses. The research has demonstrated that there is a significant influence on PS by most of the established factors and that PS has a significant influence on the behaviour of pilgrims in the Holy Mosque.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"170 - 178"},"PeriodicalIF":0.0,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42634893","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Application of African Couchgrass in Manufacturing of Medium Density Fiberboard 非洲沙发草在中密度纤维板生产中的应用
Q2 Business, Management and Accounting Pub Date : 2020-06-08 DOI: 10.2478/jeppm-2020-0023
Leopold Mbereyaho, Line Nzayisenga, Ernest Tuyizere, F. Hagenimana
Abstract Worldwide, the medium density fiberboard (MDF) materials have been extensively used for furniture as well as a normal building material. The MDF production is based on wood materials that are obtained from the tree cutting, and this process may conduct to gradual deforestation. Different works have shown the advantages of using other renewable biomass sources for MDF manufacturing. This study aimed at assessing the potential of using the African couchgrass, as one of worldwide available grass, and which has been one of the most worrying weeds for agriculture areas. The test with the manufactured MDF checked such material properties like density, moisture content, water absorption, and thickness swelling. The established results were 727.143 kg/m3, 5.81%, 9.18%, and 7.6% respectively. All those results are in the range of standard values recommended by ASTM D1037, and they give optimism for the application of couchgrass in the manufacturing of MDF. This new material was planned to be used as a partition component. Therefore, further studies should evaluate other important properties, like fire and sound resistance, while a proposal for potential replacement of the used industrial wood glue is also welcome.
摘要在世界范围内,中密度纤维板(MDF)材料已被广泛用于家具和普通建筑材料。中密度纤维板的生产是基于从树木砍伐中获得的木材材料,这一过程可能会导致逐渐的森林砍伐。不同的工作已经显示了使用其他可再生生物质来源制造MDF的优势。这项研究旨在评估使用非洲沙发草的潜力,非洲沙发草是世界范围内可用的草之一,也是农业地区最令人担忧的杂草之一。用制造的MDF进行的测试检查了材料的密度、含水量、吸水性和厚度膨胀等特性。确定的结果分别为727.143kg/m3、5.81%、9.18%和7.6%。所有这些结果都在ASTM D1037推荐的标准值范围内,它们为沙发草在MDF制造中的应用提供了乐观的结果。这种新材料计划用作隔断组件。因此,进一步的研究应该评估其他重要的性能,如耐火性和隔音性,同时也欢迎提出潜在的替代旧工业木胶的建议。
{"title":"Application of African Couchgrass in Manufacturing of Medium Density Fiberboard","authors":"Leopold Mbereyaho, Line Nzayisenga, Ernest Tuyizere, F. Hagenimana","doi":"10.2478/jeppm-2020-0023","DOIUrl":"https://doi.org/10.2478/jeppm-2020-0023","url":null,"abstract":"Abstract Worldwide, the medium density fiberboard (MDF) materials have been extensively used for furniture as well as a normal building material. The MDF production is based on wood materials that are obtained from the tree cutting, and this process may conduct to gradual deforestation. Different works have shown the advantages of using other renewable biomass sources for MDF manufacturing. This study aimed at assessing the potential of using the African couchgrass, as one of worldwide available grass, and which has been one of the most worrying weeds for agriculture areas. The test with the manufactured MDF checked such material properties like density, moisture content, water absorption, and thickness swelling. The established results were 727.143 kg/m3, 5.81%, 9.18%, and 7.6% respectively. All those results are in the range of standard values recommended by ASTM D1037, and they give optimism for the application of couchgrass in the manufacturing of MDF. This new material was planned to be used as a partition component. Therefore, further studies should evaluate other important properties, like fire and sound resistance, while a proposal for potential replacement of the used industrial wood glue is also welcome.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"211 - 218"},"PeriodicalIF":0.0,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45624140","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
期刊
Journal of Engineering Project and Production Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1