The Journal of Modern Project Management最新文献

英文 中文
Governance terminology confusion in management and project management reference documents 管理和项目管理参考文档中的治理术语混淆
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02008
S. Mcgrath, S. Whitty
This paper attempts to reduce confusion in project management practice by applying academic rigor to an evaluation of governance terminology in project and general management practitioner reference documents. It compares definitions in these documents against each other as well as against a set of previously published definitions of governance terms developed using a rigorous definitional refining method. It finds many inconsistencies in governance terminology between the reference documents analysed. These include the relationship with accountability, presumption of the joint-stock company model, inclusion of items considered unwarranted by the reference definitions and the means of handling legitimate inclusions. The existence of these inconsistencies indicates there is a need for general acceptance of a set of internally consistent governance terms and for these to be brought into the various practitioner reference documents. A set of terms is proposed. This paper contributes to the literature reviewing terminology in management and project management as well as the literature reviewing the veracity and interoperability of commercially available project management products. Projects, business and academic research can all benefit from removal of confusion from the definition of governance and related terms. This can potentially avoid waste of time, resources and money, facilitating building social and physical systems and infrastructure, benefitting organisations generally, whether public, charitable or private.
本文试图通过对项目和一般管理从业者参考文档中的治理术语进行学术严谨的评估来减少项目管理实践中的混乱。它将这些文档中的定义相互比较,并与以前发布的一组使用严格的定义精炼方法开发的治理术语定义进行比较。它发现所分析的参考文档之间在治理术语方面存在许多不一致之处。这些问题包括与问责制的关系、股份公司模式的推定、列入参考定义认为不合理的项目以及处理合法列入的方法。这些不一致的存在表明,有必要普遍接受一组内部一致的治理术语,并将这些术语纳入各种实践者参考文档。提出了一组术语。本文对管理和项目管理方面的术语进行了文献综述,并对商业项目管理产品的准确性和互操作性进行了文献综述。项目、商业和学术研究都可以从消除治理定义和相关术语的混淆中受益。这可以潜在地避免浪费时间、资源和金钱,促进建立社会和物理系统和基础设施,使公共、慈善或私人组织普遍受益。
{"title":"Governance terminology confusion in management and project management reference documents","authors":"S. Mcgrath, S. Whitty","doi":"10.19255/JMPM02008","DOIUrl":"https://doi.org/10.19255/JMPM02008","url":null,"abstract":"This paper attempts to reduce confusion in project management practice by applying academic rigor to an evaluation of governance terminology in project and general management practitioner reference documents. It compares definitions in these documents against each other as well as against a set of previously published definitions of governance terms developed using a rigorous definitional refining method. It finds many inconsistencies in governance terminology between the reference documents analysed. These include the relationship with accountability, presumption of the joint-stock company model, inclusion of items considered unwarranted by the reference definitions and the means of handling legitimate inclusions. The existence of these inconsistencies indicates there is a need for general acceptance of a set of internally consistent governance terms and for these to be brought into the various practitioner reference documents. A set of terms is proposed. This paper contributes to the literature reviewing terminology in management and project management as well as the literature reviewing the veracity and interoperability of commercially available project management products. Projects, business and academic research can all benefit from removal of confusion from the definition of governance and related terms. This can potentially avoid waste of time, resources and money, facilitating building social and physical systems and infrastructure, benefitting organisations generally, whether public, charitable or private.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128110910","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model 监督PPP项目的挑战:提出一个概念性的5维KPI模型
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02006
Bruno Lima, C. Cruz
Public-private partnerships (PPPs) have been used worldwide in infrastructure and public service provision as an alternative procurement model to traditional public work contracts. There are several benefits arising from the use of PPPs such as greater efficiency and value for money, but there is a pitfall that has significantly affected its performance: the lack of adequate monitoring by public authorities. This led to excessive renegotiations and problems of information asymmetry. Contract management remains as one of the main challenges in the PPP domain, if not the most relevant. This paper intends to minimize this gap, proposing a framework for key performance indicators (KPIs) categories that should be integrated in these contracts, enabling the grantor to effectively monitor the performance of the projects thus reducing information asymmetry problems. The KPIs category model proposed in this article congregates five groups of KPIs: operational indicators, financial indicators, relational indicators, environmental indicators and social indicators.
公私伙伴关系(ppp)作为一种替代传统公共工程合同的采购模式,已在世界范围内用于基础设施和公共服务提供。使用公私合作伙伴关系可以带来一些好处,例如提高效率和物有所值,但存在一个严重影响其绩效的陷阱:公共当局缺乏充分的监测。这导致了过度的重新谈判和信息不对称问题。合同管理仍然是PPP领域的主要挑战之一,如果不是最相关的。本文旨在最大限度地减少这一差距,提出了一个关键绩效指标(kpi)类别框架,该框架应整合到这些合同中,使授予人能够有效地监控项目的绩效,从而减少信息不对称问题。本文提出的kpi分类模型将kpi分为五组:运营指标、财务指标、关系指标、环境指标和社会指标。
{"title":"The challenge of monitoring PPP projects: Proposal of a conceptual 5-dimension KPI’s model","authors":"Bruno Lima, C. Cruz","doi":"10.19255/JMPM02006","DOIUrl":"https://doi.org/10.19255/JMPM02006","url":null,"abstract":"Public-private partnerships (PPPs) have been used worldwide in infrastructure and public service provision as an alternative procurement model to traditional public work contracts. There are several benefits arising from the use of PPPs such as greater efficiency and value for money, but there is a pitfall that has significantly affected its performance: the lack of adequate monitoring by public authorities. This led to excessive renegotiations and problems of information asymmetry. Contract management remains as one of the main challenges in the PPP domain, if not the most relevant. This paper intends to minimize this gap, proposing a framework for key performance indicators (KPIs) categories that should be integrated in these contracts, enabling the grantor to effectively monitor the performance of the projects thus reducing information asymmetry problems. The KPIs category model proposed in this article congregates five groups of KPIs: operational indicators, financial indicators, relational indicators, environmental indicators and social indicators.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122091413","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Milestone Planning: A Participatory and Visual Approach 里程碑规划:参与式和可视化方法
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02003
Eduardo Miranda
This paper introduces a participatory and visual approach to milestone planning called the Visual Milestone Planning (VMP) Method. VMP promotes involvement and commitment, through the reification of the planning artifacts and their direct manipulation by team members who collectively create the plan. Once a project scope is defined via a work breakdown structure and relevant milestones identified, a novel construct called the milestone planning matrix is used to systematically and visually capture dependencies among milestones and map WBS elements to the milestones they help realize. The milestones due dates are later determined by accommodating sticky notes representing the work to be done on a resource and time scaled milestone scheduling canvas. The method is applicable to traditional as well as to agile projects.
本文介绍了一种参与式和可视化的里程碑规划方法,称为可视化里程碑规划(VMP)方法。VMP通过计划工件的具体化和团队成员共同创建计划的直接操作来促进参与和承诺。一旦通过工作分解结构定义了项目范围,并确定了相关的里程碑,就可以使用一个称为里程碑计划矩阵的新结构来系统地、可视化地捕获里程碑之间的依赖关系,并将WBS元素映射到它们帮助实现的里程碑。里程碑的截止日期稍后通过在资源和时间尺度的里程碑调度画布上容纳代表要完成的工作的便利贴来确定。该方法既适用于传统项目,也适用于敏捷项目。
{"title":"Milestone Planning: A Participatory and Visual Approach","authors":"Eduardo Miranda","doi":"10.19255/JMPM02003","DOIUrl":"https://doi.org/10.19255/JMPM02003","url":null,"abstract":"This paper introduces a participatory and visual approach to milestone planning called the Visual Milestone Planning (VMP) Method. VMP promotes involvement and commitment, through the reification of the planning artifacts and their direct manipulation by team members who collectively create the plan. Once a project scope is defined via a work breakdown structure and relevant milestones identified, a novel construct called the milestone planning matrix is used to systematically and visually capture dependencies among milestones and map WBS elements to the milestones they help realize. The milestones due dates are later determined by accommodating sticky notes representing the work to be done on a resource and time scaled milestone scheduling canvas. The method is applicable to traditional as well as to agile projects.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128955570","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Product Development Cost Management in Aerospace SMEs 航空航天中小企业产品开发成本管理
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02005
Darli Rodrigues Vieira, E. S. Melo, Marcela Pereira dos Santos Silva
Product development in the aerospace industry involves a complex environment that demands a high level of integration to ensure that the final product cost adheres to the business plan. However, in the initial development phases, the work scope is immature and cannot be completely defined a priori. In this context, cost management is a real challenge, particularly for small and medium-sized enterprises (SMEs) that have smaller margins for errors when defining their products’ pricing. This paper proposes a framework to manage costs during product development using a method based on the design structure matrix associated with the design to cost methodology. The analysis is based on the literature and the case study method, which is applied in an aerospace SME. The results indicate positive prospects for the application of the method, which can provide a holistic perspective of the development process while promoting better control of costs.
航空航天工业中的产品开发涉及一个复杂的环境,需要高水平的集成,以确保最终产品成本符合商业计划。然而,在最初的开发阶段,工作范围是不成熟的,不能完全先验地定义。在这种情况下,成本管理是一个真正的挑战,特别是对于中小型企业(SMEs),它们在确定产品定价时犯错的余地较小。本文提出了一个在产品开发过程中管理成本的框架,使用基于与设计到成本方法相关联的设计结构矩阵的方法。本文采用文献法和案例研究法对某航空航天中小企业进行了实证分析。结果表明,该方法的应用前景良好,可以提供一个整体的发展过程的角度,同时促进更好地控制成本。
{"title":"Product Development Cost Management in Aerospace SMEs","authors":"Darli Rodrigues Vieira, E. S. Melo, Marcela Pereira dos Santos Silva","doi":"10.19255/JMPM02005","DOIUrl":"https://doi.org/10.19255/JMPM02005","url":null,"abstract":"Product development in the aerospace industry involves a complex environment that demands a high level of integration to ensure that the final product cost adheres to the business plan. However, in the initial development phases, the work scope is immature and cannot be completely defined a priori. In this context, cost management is a real challenge, particularly for small and medium-sized enterprises (SMEs) that have smaller margins for errors when defining their products’ pricing. This paper proposes a framework to manage costs during product development using a method based on the design structure matrix associated with the design to cost methodology. The analysis is based on the literature and the case study method, which is applied in an aerospace SME. The results indicate positive prospects for the application of the method, which can provide a holistic perspective of the development process while promoting better control of costs.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117184827","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Reflection of Literature on Using Lean Innovation Models For Start-Up Ventures 关于创业企业精益创新模式的文献反思
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02001
B. Galli
This paper discusses lean innovations and lean startup methods for the engineering management field. The aim of the literature review is to explain the methods and processes used in lean startup. First, we discuss the concept of startup and the impact that innovation has on startups and organizations seeking to implement lean innovations models. The assumption made in the hypothesis is that lean startup can be applied to areas outside of high-tech entrepreneurship. This hypothesis is further explored in the research. The findings in this paper suggest that innovation and entrepreneurship are highly influenced by innovation and company cultures. We find that technology transfer plays a key role in fostering innovation. However, there are barriers to public-private innovation partnerships, which is discussed in this paper.
本文讨论了工程管理领域的精益创新和精益启动方法。文献综述的目的是解释精益创业中使用的方法和过程。首先,我们讨论了创业的概念以及创新对创业公司和寻求实施精益创新模式的组织的影响。假设中的假设是精益创业可以应用于高科技创业之外的领域。这一假设在研究中得到了进一步的探讨。本文的研究结果表明,创新和企业家精神受到创新和公司文化的高度影响。我们发现,技术转让在促进创新中起着关键作用。然而,公私创新伙伴关系存在障碍,本文对此进行了讨论。
{"title":"Reflection of Literature on Using Lean Innovation Models For Start-Up Ventures","authors":"B. Galli","doi":"10.19255/JMPM02001","DOIUrl":"https://doi.org/10.19255/JMPM02001","url":null,"abstract":"This paper discusses lean innovations and lean startup methods for the engineering management field. The aim of the literature review is to explain the methods and processes used in lean startup. First, we discuss the concept of startup and the impact that innovation has on startups and organizations seeking to implement lean innovations models. The assumption made in the hypothesis is that lean startup can be applied to areas outside of high-tech entrepreneurship. This hypothesis is further explored in the research. The findings in this paper suggest that innovation and entrepreneurship are highly influenced by innovation and company cultures. We find that technology transfer plays a key role in fostering innovation. However, there are barriers to public-private innovation partnerships, which is discussed in this paper.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"45 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128788649","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Enablers and barriers to customer involvement in agile software projects in Norwegian software industry: The Supplier´s perspective 挪威软件业中客户参与敏捷软件项目的促成因素和障碍:供应商的观点
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02009
Lubna Siddique, Bassam A. Hussein
The purpose of this study is to present the research findings about factors that contribute to making customer involvement work effectively in an agile software project and to explore factors that can provide hindrance to customer involvement. We conducted 24 interviews with practitioners working with agile software projects in Norwegian software industry. Grounded theory was used to analyse the data. Findings suggested a list of factors that can enhance customer involvement and make it more effective. We called these factors enablers to customer involvement. The factors that suppliers use for effective customer involvement are: understanding customer’s perception of success, effective communication, being forthcoming and accommodating, transparency and openness and establishing trust. Factors that suppliers think the customer should pay special attention to are: customer attention, product owner who understands business, good understanding of technical and functional side and persistent cooperation. This study also presents factors that can hinder customer involvement, thus making the customer–supplier relationship less effective. We called these barrier factors. These are: not getting enough customer time, lack of understanding on the customer’s part, people without right skills and lack of communication. Research was carried out in the Norwegian software industry and grounded theory was used for data analysis, therefore this research can be called context-specific. Research participants interviewed were project managers, therefore this study presents project managers’ viewpoints only. Another limitation is that most of the participants were from the supplier side. This study provides a theory/framework of enablers and barriers to customer involvement in agile software projects. Practitioners can use these factors to enhance customer involvement in agile projects.
本研究的目的是提出有关在敏捷软件项目中使客户参与有效工作的因素的研究结果,并探讨可能阻碍客户参与的因素。我们对挪威软件行业从事敏捷软件项目的从业人员进行了24次访谈。根据理论分析了这些数据。调查结果提出了一系列可以提高客户参与并使其更有效的因素。我们称这些因素为客户参与的推动者。供应商有效参与顾客的因素包括:理解顾客对成功的看法、有效的沟通、乐于助人、透明开放、建立信任。供应商认为客户应该特别关注的因素是:客户关注、懂业务的产品负责人、对技术和功能方面的良好理解以及持续的合作。本研究还提出了阻碍顾客参与的因素,从而使顾客与供应商的关系不那么有效。我们称之为势垒因子。这些是:没有足够的客户时间,客户方面缺乏理解,人员没有正确的技能和缺乏沟通。研究是在挪威软件产业中进行的,数据分析使用了扎根理论,因此这项研究可以被称为上下文特定的。被采访的研究参与者是项目经理,因此本研究只提出了项目经理的观点。另一个限制是,大多数参与者来自供应方。本研究为敏捷软件项目中客户参与的促成因素和障碍提供了一个理论/框架。从业者可以使用这些因素来增强客户对敏捷项目的参与。
{"title":"Enablers and barriers to customer involvement in agile software projects in Norwegian software industry: The Supplier´s perspective","authors":"Lubna Siddique, Bassam A. Hussein","doi":"10.19255/JMPM02009","DOIUrl":"https://doi.org/10.19255/JMPM02009","url":null,"abstract":"The purpose of this study is to present the research findings about factors that contribute to making customer involvement work effectively in an agile software project and to explore factors that can provide hindrance to customer involvement. We conducted 24 interviews with practitioners working with agile software projects in Norwegian software industry. Grounded theory was used to analyse the data. Findings suggested a list of factors that can enhance customer involvement and make it more effective. We called these factors enablers to customer involvement. The factors that suppliers use for effective customer involvement are: understanding customer’s perception of success, effective communication, being forthcoming and accommodating, transparency and openness and establishing trust. Factors that suppliers think the customer should pay special attention to are: customer attention, product owner who understands business, good understanding of technical and functional side and persistent cooperation. This study also presents factors that can hinder customer involvement, thus making the customer–supplier relationship less effective. We called these barrier factors. These are: not getting enough customer time, lack of understanding on the customer’s part, people without right skills and lack of communication. Research was carried out in the Norwegian software industry and grounded theory was used for data analysis, therefore this research can be called context-specific. Research participants interviewed were project managers, therefore this study presents project managers’ viewpoints only. Another limitation is that most of the participants were from the supplier side. This study provides a theory/framework of enablers and barriers to customer involvement in agile software projects. Practitioners can use these factors to enhance customer involvement in agile projects.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122580971","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
The Practitioner’s Tapestry: Revealing the epistemological diversity to project management knowledge 实践者的挂毯:揭示项目管理知识的认识论多样性
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02010
Markus Krusi, S. Whitty
This case study investigates how the life experiences of a project manager has influenced their professional practice. The research methodology takes a phenomenological approach to an art therapy technique. We call it the Practitioner’s Tapestry, which comprise narrative with sketching sessions.  The methodology revealed that close relationships with inspirational people in their formative years has influenced their practice, specifically in forming mental models that subsequently structures their behaviour towards others and their approach towards ‘doing things’.  The results align with an important criticism about the epistemological and ontological assumptions of the various project management bodies of knowledge, as mental models and the tacit knowledge they develop do rightly constitute project management knowledge for dealing with the actuality of project work
本案例研究调查了项目经理的生活经历如何影响他们的专业实践。研究方法采用现象学的方法来研究艺术治疗技术。我们称之为实践者的挂毯,它包括叙述和素描会议。该方法显示,在成长期与励志人士的密切关系会影响他们的行为,特别是在形成心理模式方面,这种模式随后会影响他们对他人的行为和“做事”的方法。结果与对各种项目管理知识主体的认识论和本体论假设的重要批评一致,因为心智模型和他们开发的隐性知识正确地构成了处理项目工作现状的项目管理知识
{"title":"The Practitioner’s Tapestry: Revealing the epistemological diversity to project management knowledge","authors":"Markus Krusi, S. Whitty","doi":"10.19255/JMPM02010","DOIUrl":"https://doi.org/10.19255/JMPM02010","url":null,"abstract":"This case study investigates how the life experiences of a project manager has influenced their professional practice. The research methodology takes a phenomenological approach to an art therapy technique. We call it the Practitioner’s Tapestry, which comprise narrative with sketching sessions.  The methodology revealed that close relationships with inspirational people in their formative years has influenced their practice, specifically in forming mental models that subsequently structures their behaviour towards others and their approach towards ‘doing things’.  The results align with an important criticism about the epistemological and ontological assumptions of the various project management bodies of knowledge, as mental models and the tacit knowledge they develop do rightly constitute project management knowledge for dealing with the actuality of project work","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125473511","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A typology of meanings: practitioners views of ‘program' 意义的类型学:实践者对“程序”的看法
Pub Date : 2019-10-16 DOI: 10.19255/JMPM02011
S. Mcgrath, S. Whitty
Previous published work has identified confusion in the definition of the term program. This paper reports on a study investigating the understanding of program terminology within a sample of experienced management and project management practitioners across a range of industries and disciplines. The study was conducted in Australia which is subject to influence by both USA and British practice, without being constrained to favour either, but where any inconsistencies between these influences are potentially problematic. The outcome was that confusion on this issue was found within the practitioner community. Furthermore, this confusion had developed into competition between fields over exclusive usage of the term to the extent that one organization had even attempted to resolve it by attributing different meanings to the two different nationality spellings of the term. No common understanding or definition of the term was articulated and there was contention over whether a program has to be transformational to be labelled as such. The boundaries with the terms project and portfolio were also unclear. The existence of these inconsistencies indicates there is a need for an internally consistent set of definitions of project, program and portfolio to be agreed and adopted across the whole project management field.
先前发表的工作已经确定了术语“程序”定义中的混淆。本文报告了一项研究,调查了一系列行业和学科中经验丰富的管理和项目管理从业人员对计划术语的理解。这项研究是在澳大利亚进行的,它受到美国和英国实践的影响,并不局限于支持任何一方,但这些影响之间的任何不一致都是潜在的问题。结果是在从业者社区中发现了对这个问题的混淆。此外,这种混淆已发展成为各领域之间对该术语专有用法的竞争,以至于有一个组织甚至试图通过赋予该术语的两种不同国籍拼写不同的含义来解决这一问题。对这个术语没有共同的理解或定义,而且对于一个项目是否必须是转型的才被贴上这样的标签存在争议。术语“项目”和“投资组合”之间的界限也不清楚。这些不一致的存在表明需要一套内部一致的项目、规划和组合的定义,以便在整个项目管理领域中得到一致同意和采用。
{"title":"A typology of meanings: practitioners views of ‘program'","authors":"S. Mcgrath, S. Whitty","doi":"10.19255/JMPM02011","DOIUrl":"https://doi.org/10.19255/JMPM02011","url":null,"abstract":"Previous published work has identified confusion in the definition of the term program. This paper reports on a study investigating the understanding of program terminology within a sample of experienced management and project management practitioners across a range of industries and disciplines. The study was conducted in Australia which is subject to influence by both USA and British practice, without being constrained to favour either, but where any inconsistencies between these influences are potentially problematic. The outcome was that confusion on this issue was found within the practitioner community. Furthermore, this confusion had developed into competition between fields over exclusive usage of the term to the extent that one organization had even attempted to resolve it by attributing different meanings to the two different nationality spellings of the term. No common understanding or definition of the term was articulated and there was contention over whether a program has to be transformational to be labelled as such. The boundaries with the terms project and portfolio were also unclear. The existence of these inconsistencies indicates there is a need for an internally consistent set of definitions of project, program and portfolio to be agreed and adopted across the whole project management field.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"87 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114701645","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Audience analysis as organizational change agent: A project management methodology approach 作为组织变革推动者的受众分析:一种项目管理方法论方法
Pub Date : 2019-05-25 DOI: 10.19255/JMPM01904
Emre S. Ozmen
Survival is number one motive of companies today; therefore the majority of necessary changes and related projects within the organizations aim to secure this. However, failing to use a project management methodology may jeopardize an organization’s project management efforts and overall effectiveness, where number one reason of failures with implementing a project management methodology is related to change domain in different audience groups. This paper contributes to name the audience characteristics and relying strategies accordingly.
生存是当今公司的首要动机;因此,组织内大多数必要的变更和相关项目都旨在确保这一点。然而,未能使用项目管理方法可能会危及组织的项目管理工作和整体有效性,其中实施项目管理方法失败的第一个原因与不同受众群体中的变更领域有关。本文有助于确定受众特征和相应的依赖策略。
{"title":"Audience analysis as organizational change agent: A project management methodology approach","authors":"Emre S. Ozmen","doi":"10.19255/JMPM01904","DOIUrl":"https://doi.org/10.19255/JMPM01904","url":null,"abstract":"Survival is number one motive of companies today; therefore the majority of necessary changes and related projects within the organizations aim to secure this. However, failing to use a project management methodology may jeopardize an organization’s project management efforts and overall effectiveness, where number one reason of failures with implementing a project management methodology is related to change domain in different audience groups. This paper contributes to name the audience characteristics and relying strategies accordingly.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"89 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121126569","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Risk and Uncertainty in Engineering Projects: A Survey of Professionals 工程项目中的风险与不确定性:专业人士调查
Pub Date : 2019-05-25 DOI: 10.19255/JMPM01912
T. Silva, Darli Rodrigues Vieira, S. Melhado, M. M. Carvalho
Engineering projects tend to present numerous uncertainties due to a lack of information or unreliable information, new technologies, project complexity or even unpredictable factors. These uncertainties can affect the project´s success. This paper aims to investigate the level of knowledge and adoption of risk management practices in engineering projects. Moreover, the paper aims to explore the perception of the influence of risk management on project success. The methodological approach was a survey-based study with a sample of 596 respondents. The results indicated that most professionals (61.6%) know of the PMBoK® and try to partially or totally apply it, followed by ISO 31000 (24.7%) and ICB/IPMA (13.6%). Considering the success dimensions, the most frequent consequences associated with risk were delayed schedule, increased cost, damaged client reputation, and decreased quality.
由于缺乏信息或不可靠的信息、新技术、项目复杂性甚至不可预测的因素,工程项目往往呈现出许多不确定性。这些不确定性会影响项目的成功。本文旨在调查工程项目中风险管理实践的知识水平和采用情况。此外,本文旨在探讨风险管理对项目成功影响的认知。方法是一项基于调查的研究,共有596名受访者。结果表明,大多数专业人员(61.6%)知道PMBoK®,并试图部分或全部应用它,其次是ISO 31000(24.7%)和ICB/IPMA(13.6%)。考虑到成功的维度,与风险相关的最常见后果是进度延迟、成本增加、客户声誉受损和质量下降。
{"title":"Risk and Uncertainty in Engineering Projects: A Survey of Professionals","authors":"T. Silva, Darli Rodrigues Vieira, S. Melhado, M. M. Carvalho","doi":"10.19255/JMPM01912","DOIUrl":"https://doi.org/10.19255/JMPM01912","url":null,"abstract":"Engineering projects tend to present numerous uncertainties due to a lack of information or unreliable information, new technologies, project complexity or even unpredictable factors. These uncertainties can affect the project´s success. This paper aims to investigate the level of knowledge and adoption of risk management practices in engineering projects. Moreover, the paper aims to explore the perception of the influence of risk management on project success. The methodological approach was a survey-based study with a sample of 596 respondents. The results indicated that most professionals (61.6%) know of the PMBoK® and try to partially or totally apply it, followed by ISO 31000 (24.7%) and ICB/IPMA (13.6%). Considering the success dimensions, the most frequent consequences associated with risk were delayed schedule, increased cost, damaged client reputation, and decreased quality.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126955481","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
The Journal of Modern Project Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1