首页 > 最新文献

Journal of Public Procurement最新文献

英文 中文
Innovation for hire: a descriptive study of federal acquisitions and contractor R&D 雇佣式创新:联邦采购与承包商研发的描述性研究
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-11-13 DOI: 10.1108/jopp-10-2019-0071
Stephen C. Hansen, Judith Hermis

Purpose

This paper aims to investigate the extent to which federal acquisitions motivate private-sector partner firms’ investment in innovation.

Design/methodology/approach

Archival, Empirical.

Findings

This study finds that federal acquisitions are positively associated with contractors’ R&D spending but that the intensity of R&D spending is indistinguishable between firms’ government and private sectors (non-government) contracts. This study also develops a novel measure of the intensity of contractor R&D spending on public sector relative to private-sector clients and assesses construct validity of the measure.

Research limitations/implications

Cultivating innovation is an explicit goal of federal procurement. Innovation is critical to addressing the nation’s collective problems. The results should be of interest to scholars and practitioners, particularly acquisition personnel, one of whose responsibilities is to efficiently steward tax revenues to the most productive (contracting) use.

Originality/value

This study is descriptive in nature and helps to illuminate the extent and conditions under which federal acquisition activity motivates investment in innovation by private-sector partners. These results speak to how effectively government contracting motivates private-sector innovation, which clearly has implications for fiscal stewardship. Additionally, private-sector innovation affects stock price formation. Collectively, these results imply that the extent to which acquisitions motivate innovation has material implications on our country’s fiscal health.

本文旨在探讨联邦收购在多大程度上激励私营部门合作伙伴公司的创新投资。设计/方法/ approachArchival经验。本研究发现,联邦采购与承包商的研发支出呈正相关,但研发支出的强度在公司的政府和私营部门(非政府)合同之间没有区别。本研究还开发了一个衡量承包商在公共部门相对于私营部门客户的研发支出强度的新方法,并评估了该方法的构造效度。研究局限/启示培养创新是联邦采购的明确目标。创新是解决国家集体问题的关键。研究结果应该引起学者和实践者的兴趣,特别是采办人员,他们的职责之一是有效地管理税收,使其最具生产力(承包)。原创性/价值本研究本质上是描述性的,有助于阐明联邦收购活动激励私营部门合作伙伴对创新进行投资的程度和条件。这些结果说明了政府承包如何有效地激励私营部门的创新,这显然对财政管理有影响。此外,私营部门的创新影响股价的形成。总的来说,这些结果意味着收购激励创新的程度对我国的财政健康有重大影响。
{"title":"Innovation for hire: a descriptive study of federal acquisitions and contractor R&D","authors":"Stephen C. Hansen, Judith Hermis","doi":"10.1108/jopp-10-2019-0071","DOIUrl":"https://doi.org/10.1108/jopp-10-2019-0071","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This paper aims to investigate the extent to which federal acquisitions motivate private-sector partner firms’ investment in innovation.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Archival, Empirical.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>This study finds that federal acquisitions are positively associated with contractors’ R&amp;D spending but that the intensity of R&amp;D spending is indistinguishable between firms’ government and private sectors (non-government) contracts. This study also develops a novel measure of the intensity of contractor R&amp;D spending on public sector relative to private-sector clients and assesses construct validity of the measure.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>Cultivating innovation is an explicit goal of federal procurement. Innovation is critical to addressing the nation’s collective problems. The results should be of interest to scholars and practitioners, particularly acquisition personnel, one of whose responsibilities is to efficiently steward tax revenues to the most productive (contracting) use.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study is descriptive in nature and helps to illuminate the extent and conditions under which federal acquisition activity motivates investment in innovation by private-sector partners. These results speak to how effectively government contracting motivates private-sector innovation, which clearly has implications for fiscal stewardship. Additionally, private-sector innovation affects stock price formation. Collectively, these results imply that the extent to which acquisitions motivate innovation has material implications on our country’s fiscal health.</p><!--/ Abstract__block -->","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"22 1","pages":""},"PeriodicalIF":2.5,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138518711","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A systematic review of barriers impeding the implementation of government green procurement 阻碍政府绿色采购实施的障碍的系统审查
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-10-14 DOI: 10.1108/jopp-02-2020-0013
Navarani Vejaratnam, Z. Mohamad, S. Chenayah
Government green procurement (GGP) is becoming a popular environmental policy instrument to spur the economy whilst protecting the environment. However, the implementation of GGP is impeded by various barriers. This paper aims to analyse the existing literature on barriers impeding GGP.,This systematic literature review was guided by the PRISMA Statement (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) review method. A total of 29 articles from the Scopus and Web of Science databases were selected for the review.,Five themes, i.e. finance, legal, people, knowledge and organisation, emerged from this review, which further produced 16 sub-themes. Lack of knowledge and awareness were the major barriers for GGP, while financial constraint was not the major barrier for GGP, as previously perceived. Barriers related to organisation were the most complex. Certain barriers were found more in developed or developing countries.,Only article journals with empirical data were selected. Review articles, book series, books, chapters in books and conference proceedings were excluded.,Public managers should place highest priority to enhance knowledge and awareness of procurers on GGP. Other important initiatives to be undertaken include emulating best practices, implementing change management and incentivising suppliers to tackle the prevalent barriers of GGP. Finally, with increasing evidences on barriers related to GGP, public managers should consider mapping and analysing specific barriers hindering GGP in their organisation/country.,A less challenging and efficient implementation of GGP contributes to a cleaner environment.,This article will be the first to systematically review the barriers of GGP.
政府绿色采购(GGP)正在成为一种流行的环境政策工具,以刺激经济,同时保护环境。然而,GGP的实施受到各种障碍的阻碍。本文旨在分析现有文献中阻碍GGP的障碍。本系统文献综述采用PRISMA (Preferred Reporting Items for systematic Reviews and meta - analysis)综述方法。共从Scopus和Web of Science数据库中选择了29篇文章进行审查。本次审查产生了五个主题,即金融、法律、人、知识和组织,并进一步产生了16个分主题。缺乏知识和认识是GGP的主要障碍,而财政限制并不是以前认为的GGP的主要障碍。与组织相关的障碍最为复杂。某些障碍更多地出现在发达国家或发展中国家。,仅选取具有实证数据的文章期刊。综述文章、丛书、书籍、书籍章节和会议论文集被排除在外。,公共管理人员应优先提高采购人员对全球生产总值的认识和认识。要采取的其他重要举措包括模仿最佳做法,实施变革管理和激励供应商解决普遍存在的GGP障碍。最后,随着越来越多的证据表明与GGP相关的障碍,公共管理者应该考虑绘制和分析阻碍其组织/国家GGP的具体障碍。减少挑战和有效地实施GGP有助于更清洁的环境。本文将首次系统地回顾GGP的障碍。
{"title":"A systematic review of barriers impeding the implementation of government green procurement","authors":"Navarani Vejaratnam, Z. Mohamad, S. Chenayah","doi":"10.1108/jopp-02-2020-0013","DOIUrl":"https://doi.org/10.1108/jopp-02-2020-0013","url":null,"abstract":"Government green procurement (GGP) is becoming a popular environmental policy instrument to spur the economy whilst protecting the environment. However, the implementation of GGP is impeded by various barriers. This paper aims to analyse the existing literature on barriers impeding GGP.,This systematic literature review was guided by the PRISMA Statement (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) review method. A total of 29 articles from the Scopus and Web of Science databases were selected for the review.,Five themes, i.e. finance, legal, people, knowledge and organisation, emerged from this review, which further produced 16 sub-themes. Lack of knowledge and awareness were the major barriers for GGP, while financial constraint was not the major barrier for GGP, as previously perceived. Barriers related to organisation were the most complex. Certain barriers were found more in developed or developing countries.,Only article journals with empirical data were selected. Review articles, book series, books, chapters in books and conference proceedings were excluded.,Public managers should place highest priority to enhance knowledge and awareness of procurers on GGP. Other important initiatives to be undertaken include emulating best practices, implementing change management and incentivising suppliers to tackle the prevalent barriers of GGP. Finally, with increasing evidences on barriers related to GGP, public managers should consider mapping and analysing specific barriers hindering GGP in their organisation/country.,A less challenging and efficient implementation of GGP contributes to a cleaner environment.,This article will be the first to systematically review the barriers of GGP.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"451-471"},"PeriodicalIF":2.5,"publicationDate":"2020-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-02-2020-0013","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46933437","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 26
Stakeholders’ categorization of the sustainable public procurement system: the case of Brazil 可持续公共采购系统的利益相关者分类:以巴西为例
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-08-13 DOI: 10.1108/jopp-09-2018-0031
Marcus Vinicius de Souza Silva Oliveira, João Batista Pavesi Simão, S. Caeiro
Encouraged by the State, the Brazilian public organizations practice sustainable procurement as one of the strategies to promote sustainable development. Performing them requires understanding to manage stakeholders. The purpose of this study is to identify and categorize the stakeholders of Brazilian public organizations’ sustainable procurement system.5,Preliminarily, the stakeholders were identified in the literature and by interviews with experts. Later, in a multi-case study, it was categorized by the model of stakeholder salience.,In general, governmental and intra-organizational stakeholders were classified as more salient. However, some stakeholders considered important by literature and experts have been categorized as less salient by organizations.,The proposed categorization is useful for the system comprehension and will serve as a basis for the development of future works, notably those who propose to understand or evaluate the sustainable public procurement (SPP). Additionally, this work aims to enlarge the knowledge and the better practices of SPP in a large emerging South American country, giving its contribution to the transition to more sustainable societies.
在国家的鼓励下,巴西公共组织将可持续采购作为促进可持续发展的战略之一。执行它们需要理解以管理利益相关者。本研究的目的是确定和分类巴西公共组织可持续采购系统的利益相关者。5,首先,通过文献和专家访谈确定了利益相关者的身份。后来,在一个多案例研究中,它被利益相关者显著性模型分类。,一般来说,政府和组织内部的利益攸关方被归类为更突出的利益攸关者。然而,一些文献和专家认为重要的利益相关者被组织归类为不那么突出的利益相关方。,拟议的分类有助于系统理解,并将作为未来工作发展的基础,特别是那些建议理解或评估可持续公共采购(SPP)的工作。此外,这项工作的目的是在一个新兴的南美大国扩大SPP的知识和更好的做法,为向更可持续的社会过渡做出贡献。
{"title":"Stakeholders’ categorization of the sustainable public procurement system: the case of Brazil","authors":"Marcus Vinicius de Souza Silva Oliveira, João Batista Pavesi Simão, S. Caeiro","doi":"10.1108/jopp-09-2018-0031","DOIUrl":"https://doi.org/10.1108/jopp-09-2018-0031","url":null,"abstract":"Encouraged by the State, the Brazilian public organizations practice sustainable procurement as one of the strategies to promote sustainable development. Performing them requires understanding to manage stakeholders. The purpose of this study is to identify and categorize the stakeholders of Brazilian public organizations’ sustainable procurement system.5,Preliminarily, the stakeholders were identified in the literature and by interviews with experts. Later, in a multi-case study, it was categorized by the model of stakeholder salience.,In general, governmental and intra-organizational stakeholders were classified as more salient. However, some stakeholders considered important by literature and experts have been categorized as less salient by organizations.,The proposed categorization is useful for the system comprehension and will serve as a basis for the development of future works, notably those who propose to understand or evaluate the sustainable public procurement (SPP). Additionally, this work aims to enlarge the knowledge and the better practices of SPP in a large emerging South American country, giving its contribution to the transition to more sustainable societies.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"423-449"},"PeriodicalIF":2.5,"publicationDate":"2020-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-09-2018-0031","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42524418","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Public procurement performance and the challenge of service complexity – the case of pre-hospital healthcare 公共采购绩效和服务复杂性的挑战——以院前保健为例
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-07-02 DOI: 10.1108/jopp-01-2020-0002
I. Pettersen, K. Nyland, Geraldine B. Robbins
PurposeThe purpose of this paper is to study the links between contextual changes, contract arrangements and resultant problems when changes in outsourcing regulatory requirements are applied to complex pre-hospital services previously characterized by relational contracting.Design/methodology/approachThe study deployed a qualitative design based on interviews with key informants and extensive studies of documents. It is a longitudinal study of a procurement process taking place in a regional health authority covering the period 2006 to 2017.FindingsA complex and longitudinal public procurement process where pre-hospital (ambulance) services are transformed from relational and outsourced governance to more formal arrangements based on legal and transactional controls, is described in detail. After several years, the process collapsed due to challenges following public scrutiny, legal actions and administrative staff resignations. The public body lacked procurement competencies and the learning process following the regulations was lengthy. In the end, the services were in-sourced.Research limitations/implicationsThis study is based on one case and it should, therefore, not be generalized without limitations.Practical implicationsOne practical implication of this study is that transactional contracts are not optimal when core and complex services are produced in inter-organizational settings. In public sector health-care contexts, the role of informal and social controls based on relational exchanges are particularly applicable.Social implicationsAcute health-care services essential to citizens’ security and health imply high asset specificity, frequency and uncertainty. Such transactions should according to theory be produced in-house because of high agency costs in the procurement process.Originality/valueThe paper contributes to the understanding of how the public procurement process can itself be complex, as managerial challenges and solutions vary along several dimensions and are contingent upon external factors. In particular, the study increases knowledge of why the design and implementation of outsourcing models may create problems that impede and obstruct control in a particular public sector context.
本文的目的是研究当外包监管要求的变化应用于复杂的院前服务时,背景变化、合同安排和由此产生的问题之间的联系,这些服务以前以关系合同为特征。设计/方法/方法本研究采用定性设计,基于对关键信息提供者的访谈和对文献的广泛研究。这是对2006年至2017年期间在地区卫生当局进行的采购过程进行的纵向研究。研究结果详细描述了一个复杂的纵向公共采购过程,其中院前(救护车)服务从关系和外包治理转变为基于法律和交易控制的更正式安排。几年后,由于公众监督、法律诉讼和行政人员辞职等挑战,这一进程崩溃了。该公共机构缺乏采购能力,遵循条例的学习过程很长。最后,这些服务都是内包的。研究的局限性/意义本研究基于一个病例,因此不应一概而论。实际意义本研究的一个实际意义是,当核心和复杂服务在组织间环境中产生时,交易契约不是最优的。在公共部门保健方面,以关系交流为基础的非正式控制和社会控制的作用特别适用。社会影响对公民安全和健康至关重要的紧急保健服务意味着高资产专用性、频率和不确定性。根据理论,这种交易应该在内部进行,因为采购过程中的代理成本很高。原创性/价值本文有助于理解公共采购过程本身是如何复杂的,因为管理挑战和解决方案在几个方面各不相同,并取决于外部因素。特别是,该研究增加了对为什么外包模式的设计和实施可能在特定公共部门环境中产生阻碍和阻碍控制的问题的认识。
{"title":"Public procurement performance and the challenge of service complexity – the case of pre-hospital healthcare","authors":"I. Pettersen, K. Nyland, Geraldine B. Robbins","doi":"10.1108/jopp-01-2020-0002","DOIUrl":"https://doi.org/10.1108/jopp-01-2020-0002","url":null,"abstract":"\u0000Purpose\u0000The purpose of this paper is to study the links between contextual changes, contract arrangements and resultant problems when changes in outsourcing regulatory requirements are applied to complex pre-hospital services previously characterized by relational contracting.\u0000\u0000\u0000Design/methodology/approach\u0000The study deployed a qualitative design based on interviews with key informants and extensive studies of documents. It is a longitudinal study of a procurement process taking place in a regional health authority covering the period 2006 to 2017.\u0000\u0000\u0000Findings\u0000A complex and longitudinal public procurement process where pre-hospital (ambulance) services are transformed from relational and outsourced governance to more formal arrangements based on legal and transactional controls, is described in detail. After several years, the process collapsed due to challenges following public scrutiny, legal actions and administrative staff resignations. The public body lacked procurement competencies and the learning process following the regulations was lengthy. In the end, the services were in-sourced.\u0000\u0000\u0000Research limitations/implications\u0000This study is based on one case and it should, therefore, not be generalized without limitations.\u0000\u0000\u0000Practical implications\u0000One practical implication of this study is that transactional contracts are not optimal when core and complex services are produced in inter-organizational settings. In public sector health-care contexts, the role of informal and social controls based on relational exchanges are particularly applicable.\u0000\u0000\u0000Social implications\u0000Acute health-care services essential to citizens’ security and health imply high asset specificity, frequency and uncertainty. Such transactions should according to theory be produced in-house because of high agency costs in the procurement process.\u0000\u0000\u0000Originality/value\u0000The paper contributes to the understanding of how the public procurement process can itself be complex, as managerial challenges and solutions vary along several dimensions and are contingent upon external factors. In particular, the study increases knowledge of why the design and implementation of outsourcing models may create problems that impede and obstruct control in a particular public sector context.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"403-421"},"PeriodicalIF":2.5,"publicationDate":"2020-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-01-2020-0002","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44999352","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The impact of e-procurement on institutional quality 电子采购对机构质量的影响
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-06-16 DOI: 10.1108/jopp-07-2019-0050
L. Mélon, Rock Spruk
PurposeBecause of the renewed interest in public purchasing and the strategic use of public funds under the requirements of sustainable development, the question arose once again as to how to curb the fall of institutional quality once criteria other than price are inserted into the decision-making in public purchasing. E-procurement has been repeatedly named as one of the most efficient tools to that effect and the present paper sets out to discover whether the implementation of e-procurement in a particular country per se entails also higher institutional quality, allowing for a wider implementation of green and sustainable procurement at the national, regional and municipal level without the fear of worsening the country’s institutional quality. By analyzing the implementation of e-procurement in Denmark, the Netherlands and in Portugal, this paper aims to verify the hypothesis that the implementation of e-procurement implies better institutions in terms of public purchasing. As such, the conclusions will be used in further research on the prerequisites for a successful implementation of green public procurement across the European Union.Design/methodology/approachGathering data on institutional quality of three early e-procurement adopters (Denmark, the Netherlands and Portugal) allows for comparison of institutional quality pre- and post-e-procurement implementation. By using difference-in-differences comparison the paper seeks to answer the question how doesmandatory e-procurement influence institutional quality on the national level.FindingsThe paper finds that the reform is generally associated with a relatively stronger control of corruption in the Netherlands and Denmark, while a similar reform in Portugal failed to translate into a stronger control of corruption. Furthermore, while using the quality of regulation as a dependent variable, a positive and robust effect on the quality of regulation in Denmark was shown, while the quality of reputation in the Netherlands and Portugal declined in the post-reform period, with the drop in the quality of regulation in Portugal being considerably greater, a two-fold higher amount than the estimated drop in the Netherlands. The paper suggests that in spite of the same aims, the reform yielded substantially different or even opposing effects compared to Denmark.Research limitations/implicationsBy examining three examples of early adopters, further research with broader impact is needed to deduce general implications for e-procurement implementation. Furthermore, implementation of e-procurement at the regional or local level can also yield distinct results.Social implicationsUnderstanding the actual impact of e-procurement on institutional quality is indispensable for further study on the matter. The present study argues that e-procurement needs to be accompanied by additional measures or variables to yield a positive impact on institutional quality in public procurement.Originality/valueAs to orig
目的由于人们对公共采购重新产生兴趣,并在可持续发展的要求下战略性地使用公共资金,一旦将价格以外的标准纳入公共采购决策,如何遏制制度质量下降的问题再次出现。电子采购被反复称为实现这一目标的最有效工具之一,本文件旨在了解在特定国家实施电子采购本身是否也需要更高的制度质量,从而在国家、地区和地区更广泛地实施绿色和可持续采购,区域和市政层面,而不必担心国家的制度质量恶化。通过分析丹麦、荷兰和葡萄牙实施电子采购的情况,本文旨在验证这样一种假设,即实施电子采购意味着在公共采购方面有更好的制度。因此,这些结论将用于进一步研究在整个欧盟成功实施绿色公共采购的先决条件。设计/方法/方法收集三个早期电子采购采用者(丹麦、荷兰和葡萄牙)的机构质量数据,可以比较电子采购实施前后的机构质量。通过差异中的差异比较,本文试图回答强制性电子采购如何影响国家层面的制度质量的问题。论文发现,荷兰和丹麦的改革通常与相对更有力的腐败控制有关,而葡萄牙的类似改革未能转化为对腐败的更有力控制。此外,虽然将监管质量作为因变量,但丹麦的监管质量受到了积极而有力的影响,而荷兰和葡萄牙的声誉质量在改革后时期有所下降,葡萄牙的监管质量下降幅度更大,比荷兰估计的下降幅度高出两倍。该文件表明,尽管目标相同,但与丹麦相比,改革产生了明显不同甚至相反的效果。研究局限性/含义通过考察早期采用者的三个例子,需要进行具有更广泛影响的进一步研究,以推断电子采购实施的一般含义。此外,在区域或地方一级实施电子采购也可以产生不同的结果。社会含义了解电子采购对制度质量的实际影响对于进一步研究这一问题至关重要。本研究认为,电子采购需要伴随额外的措施或变量,才能对公共采购的机构质量产生积极影响。独创性/价值关于独创性,本文采用了法律和经济学方法,源自或更好地说是从绿色公共采购问题中汲取动机,试图在实施绿色公共采购实践时,提供一种可以用来消除对制度质量问题的工具。
{"title":"The impact of e-procurement on institutional quality","authors":"L. Mélon, Rock Spruk","doi":"10.1108/jopp-07-2019-0050","DOIUrl":"https://doi.org/10.1108/jopp-07-2019-0050","url":null,"abstract":"PurposeBecause of the renewed interest in public purchasing and the strategic use of public funds under the requirements of sustainable development, the question arose once again as to how to curb the fall of institutional quality once criteria other than price are inserted into the decision-making in public purchasing. E-procurement has been repeatedly named as one of the most efficient tools to that effect and the present paper sets out to discover whether the implementation of e-procurement in a particular country per se entails also higher institutional quality, allowing for a wider implementation of green and sustainable procurement at the national, regional and municipal level without the fear of worsening the country’s institutional quality. By analyzing the implementation of e-procurement in Denmark, the Netherlands and in Portugal, this paper aims to verify the hypothesis that the implementation of e-procurement implies better institutions in terms of public purchasing. As such, the conclusions will be used in further research on the prerequisites for a successful implementation of green public procurement across the European Union.Design/methodology/approachGathering data on institutional quality of three early e-procurement adopters (Denmark, the Netherlands and Portugal) allows for comparison of institutional quality pre- and post-e-procurement implementation. By using difference-in-differences comparison the paper seeks to answer the question how doesmandatory e-procurement influence institutional quality on the national level.FindingsThe paper finds that the reform is generally associated with a relatively stronger control of corruption in the Netherlands and Denmark, while a similar reform in Portugal failed to translate into a stronger control of corruption. Furthermore, while using the quality of regulation as a dependent variable, a positive and robust effect on the quality of regulation in Denmark was shown, while the quality of reputation in the Netherlands and Portugal declined in the post-reform period, with the drop in the quality of regulation in Portugal being considerably greater, a two-fold higher amount than the estimated drop in the Netherlands. The paper suggests that in spite of the same aims, the reform yielded substantially different or even opposing effects compared to Denmark.Research limitations/implicationsBy examining three examples of early adopters, further research with broader impact is needed to deduce general implications for e-procurement implementation. Furthermore, implementation of e-procurement at the regional or local level can also yield distinct results.Social implicationsUnderstanding the actual impact of e-procurement on institutional quality is indispensable for further study on the matter. The present study argues that e-procurement needs to be accompanied by additional measures or variables to yield a positive impact on institutional quality in public procurement.Originality/valueAs to orig","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"1 1","pages":""},"PeriodicalIF":2.5,"publicationDate":"2020-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-07-2019-0050","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43961899","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Unravelling SMEs’ participation and success in public procurement 破解中小企业在公共采购中的参与与成功
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-06-06 DOI: 10.1108/jopp-03-2018-0013
C. Mauro, A. Ancarani, Tara Hartley
PurposeThis paper aims to investigate the role of micro, small and medium enterprises (MSMEs) within the Canadian public procurement, by seeking to identify barriers and supporting factors of MSMEs’ participation and success in public tenders.Design/methodology/approachThe empirical analysis builds on a unique survey run by the Canadian federal government, which addressed firms either participating or not participating in public tenders. Model estimation on the survey data relies on sample selection methodologies, which allow separating determinants of MSMEs’ decision to participate from determinants of success.FindingsResults provide evidence that costs stemming from asset specificity and uncertainty (e.g. costs of bidding, requirements for participation, bundling of contracts and award rules based on minimum price) affect participation in public procurement. Within MSMEs, micro-firms are the most discouraged from participating. However, after controlling for factors affecting participation, micro-firms emerge as having a higher success rate, possibly because of high specialization and joint participation with larger firms.Research limitations/implicationsBecause of the cross-sectional nature of the data used for hypotheses testing, endogeneity may arise if ex post variables affect ex ante decisions. This may apply if participation in procurement feeds on success in past tenders.Social implicationsFindings may inform policies for the inclusion of smaller firms in the public marketplace.Originality/valueTo the best of the authors’ knowledge, this study is the first attempting to disentangle determinants of participation in public tenders from determinants of success. Separating the two aspects helps fine-tune SME-friendly public procurement policies, by identifying actions that effectively facilitate success of MSMEs in public tenders.
本文旨在通过寻找中小微企业参与和成功参与公共招标的障碍和支持因素,研究中小微企业(MSMEs)在加拿大公共采购中的作用。设计/方法/方法实证分析建立在加拿大联邦政府开展的一项独特调查的基础上,该调查针对参与或不参与公开招标的公司。对调查数据的模型估计依赖于样本选择方法,该方法允许将中小微企业参与决策的决定因素与成功决定因素分开。研究结果提供了证据,表明由资产特殊性和不确定性(如投标成本、参与要求、合同捆绑和基于最低价格的奖励规则)产生的成本会影响公共采购的参与。在微型中小企业中,微型企业最不愿意参与。然而,在控制了影响参与的因素后,微型企业出现了更高的成功率,可能是因为高度专业化和与大企业的联合参与。研究限制/意义由于用于假设检验的数据的横断面性质,如果事后变量影响事前决策,可能会产生内生性。如果参与采购依赖于过去投标的成功,这可能适用。社会影响研究结果可能为将小型企业纳入公共市场的政策提供信息。原创性/价值据作者所知,这项研究是第一次试图将参与公开招标的决定因素与成功的决定因素区分开来。通过确定有效促进中小微企业在公开招标中取得成功的行动,将这两个方面分开有助于调整有利于中小微企业的公共采购政策。
{"title":"Unravelling SMEs’ participation and success in public procurement","authors":"C. Mauro, A. Ancarani, Tara Hartley","doi":"10.1108/jopp-03-2018-0013","DOIUrl":"https://doi.org/10.1108/jopp-03-2018-0013","url":null,"abstract":"\u0000Purpose\u0000This paper aims to investigate the role of micro, small and medium enterprises (MSMEs) within the Canadian public procurement, by seeking to identify barriers and supporting factors of MSMEs’ participation and success in public tenders.\u0000\u0000\u0000Design/methodology/approach\u0000The empirical analysis builds on a unique survey run by the Canadian federal government, which addressed firms either participating or not participating in public tenders. Model estimation on the survey data relies on sample selection methodologies, which allow separating determinants of MSMEs’ decision to participate from determinants of success.\u0000\u0000\u0000Findings\u0000Results provide evidence that costs stemming from asset specificity and uncertainty (e.g. costs of bidding, requirements for participation, bundling of contracts and award rules based on minimum price) affect participation in public procurement. Within MSMEs, micro-firms are the most discouraged from participating. However, after controlling for factors affecting participation, micro-firms emerge as having a higher success rate, possibly because of high specialization and joint participation with larger firms.\u0000\u0000\u0000Research limitations/implications\u0000Because of the cross-sectional nature of the data used for hypotheses testing, endogeneity may arise if ex post variables affect ex ante decisions. This may apply if participation in procurement feeds on success in past tenders.\u0000\u0000\u0000Social implications\u0000Findings may inform policies for the inclusion of smaller firms in the public marketplace.\u0000\u0000\u0000Originality/value\u0000To the best of the authors’ knowledge, this study is the first attempting to disentangle determinants of participation in public tenders from determinants of success. Separating the two aspects helps fine-tune SME-friendly public procurement policies, by identifying actions that effectively facilitate success of MSMEs in public tenders.\u0000","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"377-401"},"PeriodicalIF":2.5,"publicationDate":"2020-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-03-2018-0013","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47834161","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
Compliance mediating role within road construction regulatory framework 道路建设监管框架内的合规中介作用
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-05-01 DOI: 10.1108/jopp-12-2018-0052
Noah Mwelu, P. Davis, Yongjian Ke, Susan Watundu
The propose of this study is to focus on the mediating role of compliance with procurement regulatory frameworks in implementing public road construction projects.,A cross-sectional research design was adopted. Structured questionnaires were developed in a three-step process including generating items, purifying measurement items and validating measurement items. Variables were anchored on a five-point Likert scale because it is an efficient unidimensional scale that ensures all items measure the same thing and widely applicable in construction research.,The findings show that compliance with a public procurement regulatory framework significantly mediates the relationship between familiarity with a public procurement regulatory framework, monitoring activities, sanction on staff and contractors’ resistance to non-compliance and public road construction project success. However, compliance with a public procurement regulatory framework does not mediate the relationship between the professionalism of staff and perceived inefficiency with public road construction projects’ success.,Limited mediation studies and examples in the public road construction subsector affected this study to comprehensively investigate and compare study findings. Furthermore, the study adopted a cross-sectional research design that limits responses to one point in time. Finally, the study missed out other participants in different organizations and departments that could have had relevant information.,The study contributes to public procurement and construction management research fields by uncovering this strong mediating role of compliance with a public procurement regulatory framework that collectively would help the government to implement public road construction projects successfully. Because no single factor can reliably attain objectives, blending these factors through a hybrid governance system would enable the government to achieve value for money, increase the quality and quantity of paved roads and save funds that can be channeled to other priority sectors for economic development.,Despite scholarly efforts to establish project success factors, studies have been limited to factors directly impacting the project success without considering a mediating effect among the factors that affect the success of these projects.
本研究的建议是集中在遵守采购监管框架在实施公共道路建设项目中的中介作用。采用横断面研究设计。结构化问卷的开发分为三个步骤,包括生成项目、净化测量项目和验证测量项目。变量被固定在五点李克特量表上,因为它是一种有效的单维量表,确保所有项目测量相同的东西,广泛适用于建筑研究。研究结果表明,遵守公共采购监管框架在熟悉公共采购监管框架、监测活动、对工作人员的制裁和承包商对不遵守规定的抵制与公共道路建设项目成功之间的关系中起着显著的中介作用。然而,遵守公共采购监管框架并不能调解工作人员的专业精神与公共道路建设项目成功之间的关系。,有限的调解研究和公共道路建设分行业的例子影响了本研究,以全面调查和比较研究结果。此外,该研究采用了横断面研究设计,将反应限制在一个时间点。最后,该研究忽略了来自不同组织和部门的其他参与者,他们可能有相关的信息。该研究通过揭示公共采购监管框架的合规性这一强大的中介作用,有助于政府成功实施公共道路建设项目,从而为公共采购和建设管理研究领域做出了贡献。由于没有任何单一因素可以可靠地实现目标,因此通过混合治理系统将这些因素混合在一起,将使政府能够实现物有所值,提高铺设道路的质量和数量,并节省资金,这些资金可以用于经济发展的其他优先部门。尽管学术界努力建立项目成功因素,但研究仅限于直接影响项目成功的因素,而没有考虑影响这些项目成功的因素之间的中介作用。
{"title":"Compliance mediating role within road construction regulatory framework","authors":"Noah Mwelu, P. Davis, Yongjian Ke, Susan Watundu","doi":"10.1108/jopp-12-2018-0052","DOIUrl":"https://doi.org/10.1108/jopp-12-2018-0052","url":null,"abstract":"The propose of this study is to focus on the mediating role of compliance with procurement regulatory frameworks in implementing public road construction projects.,A cross-sectional research design was adopted. Structured questionnaires were developed in a three-step process including generating items, purifying measurement items and validating measurement items. Variables were anchored on a five-point Likert scale because it is an efficient unidimensional scale that ensures all items measure the same thing and widely applicable in construction research.,The findings show that compliance with a public procurement regulatory framework significantly mediates the relationship between familiarity with a public procurement regulatory framework, monitoring activities, sanction on staff and contractors’ resistance to non-compliance and public road construction project success. However, compliance with a public procurement regulatory framework does not mediate the relationship between the professionalism of staff and perceived inefficiency with public road construction projects’ success.,Limited mediation studies and examples in the public road construction subsector affected this study to comprehensively investigate and compare study findings. Furthermore, the study adopted a cross-sectional research design that limits responses to one point in time. Finally, the study missed out other participants in different organizations and departments that could have had relevant information.,The study contributes to public procurement and construction management research fields by uncovering this strong mediating role of compliance with a public procurement regulatory framework that collectively would help the government to implement public road construction projects successfully. Because no single factor can reliably attain objectives, blending these factors through a hybrid governance system would enable the government to achieve value for money, increase the quality and quantity of paved roads and save funds that can be channeled to other priority sectors for economic development.,Despite scholarly efforts to establish project success factors, studies have been limited to factors directly impacting the project success without considering a mediating effect among the factors that affect the success of these projects.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"209-233"},"PeriodicalIF":2.5,"publicationDate":"2020-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-12-2018-0052","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48235923","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Drivers and differentiators: a grounded theory study of procurement in public and private organizations 驱动因素和差异化因素:公共和私人组织采购的接地理论研究
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-05-01 DOI: 10.1108/jopp-10-2019-0068
Dolores Kuchina‐Musina, John C. Morris, Joshua Steinfeld
The purpose of this study is to examine procurement professionals’ perceptions of public-private partnerships in contract arrangements and to explore decision-making that takes place in the contracting process.,A grounded theory approach is applied to Simon’s (1947) model of decision-making to better understand the perceptions of procurement professionals, especially because it pertains to public vs private sector contexts. The researchers collected data by conducting interviews and observing a compliance webinar of federal contracting employees.,The results show that in the decision-making process, Simon’s illustration of a means-end hierarchy is applicable for procurement decision-making because it is driven by activities that are evaluated using aims established by the organization.,The implications are that, in the procurement decision-making process, a means-end hierarchy is driven by the activities that are evaluated using aims established by the organization. Essentially, the activities are associated to a mean, a mean is associated to a sub-goal and the sub-goal supports the main aim of the organization.,This study supports the notion that training, information and procedures are a way for organizations to control behaviors and promote consistent results from their subordinates.,This study contributes by examining the drivers of procurement decision-making. Despite previous literature that focuses on practitioner discretion or emphasizes on socio-economic factors, this study highlights the linkages between practitioner decision-making and organizational aims and objectives. As such, the paper serves to illustrate the vital connection between procurement activities and outputs.
本研究的目的是检查采购专业人员对合同安排中的公私伙伴关系的看法,并探讨在合同过程中发生的决策。西蒙(1947)的决策模型采用扎根理论方法,以更好地理解采购专业人员的看法,特别是因为它涉及公共部门与私营部门的背景。研究人员通过采访和观察联邦合同雇员的合规性网络研讨会来收集数据。结果表明,在决策过程中,西蒙的手段-目的层次结构的说明适用于采购决策,因为它是由活动驱动的,这些活动是用组织建立的目标来评估的。其含义是,在采购决策过程中,手段-目的层次结构是由使用组织建立的目标进行评估的活动驱动的。从本质上讲,这些活动与一个平均值相关联,一个平均值与一个子目标相关联,子目标支持组织的主要目标。本研究支持这样一种观点,即培训、信息和程序是组织控制下属行为和促进其一致结果的一种方式。本研究通过审查采购决策的驱动因素作出贡献。尽管以前的文献关注从业者的自由裁量权或强调社会经济因素,但本研究强调了从业者决策与组织目标和目标之间的联系。因此,该文件有助于说明采购活动与产出之间的重要联系。
{"title":"Drivers and differentiators: a grounded theory study of procurement in public and private organizations","authors":"Dolores Kuchina‐Musina, John C. Morris, Joshua Steinfeld","doi":"10.1108/jopp-10-2019-0068","DOIUrl":"https://doi.org/10.1108/jopp-10-2019-0068","url":null,"abstract":"The purpose of this study is to examine procurement professionals’ perceptions of public-private partnerships in contract arrangements and to explore decision-making that takes place in the contracting process.,A grounded theory approach is applied to Simon’s (1947) model of decision-making to better understand the perceptions of procurement professionals, especially because it pertains to public vs private sector contexts. The researchers collected data by conducting interviews and observing a compliance webinar of federal contracting employees.,The results show that in the decision-making process, Simon’s illustration of a means-end hierarchy is applicable for procurement decision-making because it is driven by activities that are evaluated using aims established by the organization.,The implications are that, in the procurement decision-making process, a means-end hierarchy is driven by the activities that are evaluated using aims established by the organization. Essentially, the activities are associated to a mean, a mean is associated to a sub-goal and the sub-goal supports the main aim of the organization.,This study supports the notion that training, information and procedures are a way for organizations to control behaviors and promote consistent results from their subordinates.,This study contributes by examining the drivers of procurement decision-making. Despite previous literature that focuses on practitioner discretion or emphasizes on socio-economic factors, this study highlights the linkages between practitioner decision-making and organizational aims and objectives. As such, the paper serves to illustrate the vital connection between procurement activities and outputs.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"265-285"},"PeriodicalIF":2.5,"publicationDate":"2020-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-10-2019-0068","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47216343","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
A systems approach for green public procurement implementation 实施绿色公共采购的系统方法
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-05-01 DOI: 10.1108/jopp-03-2019-0017
Conghu Wang, Yuhua Qiao, Xiaoming Li
This paper aims to identify important factors in green public procurement (GPP) implementation and then to clarify how these factors affect GPP implementation.,The authors applied the Delphi method first and then conducted a focused and constrained multiple case study at 18 government procurement centers across China.,The authors identified four clusters of factors for successful GPP implementation: more clear, consistent and operational policy goals; a nation-wide green procurement campaign to enhance social capital and cultural resources; promoting staff’s ethics, professionalism, capacity and knowledge; and establishing checks and balances among organizations involved in the whole purchasing process.,GPP can significantly improve environmental protection and sustainable development.,Based on key insights from systems theory and agency theory, the authors emphasize that GPP implementation must take down its own functional silos and adopt a process approach across organizational tiers to synchronize human resource based and inter-organizational capabilities into a unified whole through information sharing, communications and collaboration.
本文旨在确定绿色公共采购(GPP)实施中的重要因素,然后阐明这些因素如何影响GPP的实施。,作者首先应用德尔菲方法,然后在中国18个政府采购中心进行了重点和约束的多案例研究。,作者确定了成功实施GPP的四组因素:更明确、一致和可操作的政策目标;开展全国范围的绿色采购活动,以增强社会资本和文化资源;促进工作人员的道德操守、专业精神、能力和知识;以及在参与整个采购过程的组织之间建立制衡机制。,GPP可以显著改善环境保护和可持续发展。,基于系统理论和代理理论的关键见解,作者强调,GPP的实施必须打破其自身的功能筒仓,并采用跨组织层的流程方法,通过信息共享、沟通和协作,将基于人力资源的组织间能力同步为一个统一的整体。
{"title":"A systems approach for green public procurement implementation","authors":"Conghu Wang, Yuhua Qiao, Xiaoming Li","doi":"10.1108/jopp-03-2019-0017","DOIUrl":"https://doi.org/10.1108/jopp-03-2019-0017","url":null,"abstract":"This paper aims to identify important factors in green public procurement (GPP) implementation and then to clarify how these factors affect GPP implementation.,The authors applied the Delphi method first and then conducted a focused and constrained multiple case study at 18 government procurement centers across China.,The authors identified four clusters of factors for successful GPP implementation: more clear, consistent and operational policy goals; a nation-wide green procurement campaign to enhance social capital and cultural resources; promoting staff’s ethics, professionalism, capacity and knowledge; and establishing checks and balances among organizations involved in the whole purchasing process.,GPP can significantly improve environmental protection and sustainable development.,Based on key insights from systems theory and agency theory, the authors emphasize that GPP implementation must take down its own functional silos and adopt a process approach across organizational tiers to synchronize human resource based and inter-organizational capabilities into a unified whole through information sharing, communications and collaboration.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"287-311"},"PeriodicalIF":2.5,"publicationDate":"2020-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-03-2019-0017","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42913345","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry 确定加纳建筑业在实现物有所值方面的潜在缺点
IF 2.5 Q3 PUBLIC ADMINISTRATION Pub Date : 2020-04-25 DOI: 10.1108/jopp-11-2019-0075
E. Kissi, T. Adjei-Kumi, Samuel Twum-Ampofo, C. Debrah
The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry.,From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry.,A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings.,The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability.,This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.
没有实现最有价值的项目仍然是建筑业的一个长期问题。本文旨在找出影响加纳建筑业实现物有所值(VfM)的潜在缺陷。,通过全面的文献综述和试点调查,确定了18个导致VfM未实现的变量。通过有目的和滚雪球式的抽样技术,对目标专业人员进行了问卷调查。因子分析用于确定加纳建筑业VfM成就相同维度背后的潜在缺陷。,共有六个组成部分被确定并解释为外部因素;制度文化和政策制约;技术和决策因素;与人有关的因素以及问责制和透明度方面的制约因素。相对重要性指数用于分析解决不足的策略。,项目交付不佳的普遍情况和VfM的持续运动需要进行研究,以解释加纳建筑业在实现VfM方面的潜在缺陷。建议政府对公共项目中的VfM给予高度重视。这将有助于在不影响质量的情况下降低建筑项目的总体成本。当VfM得到认真对待时,政府可以节省更多的资金,承担更多的项目,并在透明度和问责制方面获得公众的认可。,这项研究确定了其他发展中国家可以效仿的潜在缺陷,为VfM分析的进一步研究奠定了基础。
{"title":"Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry","authors":"E. Kissi, T. Adjei-Kumi, Samuel Twum-Ampofo, C. Debrah","doi":"10.1108/jopp-11-2019-0075","DOIUrl":"https://doi.org/10.1108/jopp-11-2019-0075","url":null,"abstract":"The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry.,From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry.,A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings.,The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability.,This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"313-330"},"PeriodicalIF":2.5,"publicationDate":"2020-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-11-2019-0075","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43140780","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 18
期刊
Journal of Public Procurement
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1