Abstrak: Hinggan saat ini jaringan pipa Perumda Air Minum Tirta Jam Gadang Kota Bukittinggi telah tersebar sekitar 86,4% dari wilayah pelayanan walaupun masih ada sebagian wilayah yang dilakukan penggiliran dalam hal pendistribusian air. Dengan kondisi sistem perpipaan ( jaringan perpipaan ) zona pelayanan reservoar Birugo buatan Belanda dengan perhitungan diameter pipa 150 mm mampu melayani ±2.617 SR ( Sambungan Rumah ), dengan panjang bentang pipa terpasang ±23,183 Km dengan debit rata-rata ±17 L/dt dan terdapat penurunan atau pelanggan non aktif sebsar ±1.119 SR dengan total pelanggan potensial saat ini sebanyak ±8.666 SR. Kapasitas total kebutuhan air di zona pelayanan reservoar Birugo 190.929 m3/ bulan Pipa Distribusi Perumda Air Minum Trita Jam Gadang Kota Bukittingi zona pelayanan reservoar Birugo menggunakan pipa jenis HDPE dengan diameter 1 ¼ inchi, 1 ½ inchi, 2 inchi, 2 ½ inchi, 3 inchi, 4 inchi ,5 Inchi, 5 ½ inchi, 6 inchi, 7 inchi, 8 inchi, 9 inchi , 10 inchi, 11 inch, 12 inchi. Setelah software Epanet 2.0 dijalankan dengan pola pemakaian air selama 24 jam ditemukan beberapa titik pelayana zona reservoar Birugo mengalami penurunan tekan yang tidak memenuhi standar pelayanan tekanan Minimum 10 meter kolom air (mka) / atau 1 atm.Kata kunci : Jaringan pipa , EPANET 2.0, Evaluasi,PDAM, Bukittinggi.
抽水机:直到今天,丁亭镇的蓝总供水网络已经分散在服务分区的86.4%左右,但也有部分地区是通过分水岭分配水的。管道系统(管道)网络服务区域条件reservoar Birugo荷兰制造的管道直径150毫米的计算能力服务±2.617 SR(房子),连接管道全长跨度安装±23.183公里放电平均17±L / dt和有下降或非活跃客户sebsar±1.119 SR和潜在客户目前总值±8.666 SR。总需求在服务区域水容量reservoar Birugo 190929立方米/月Perumda分布Trita小时嘎当饮用水管道Bukittingi reservoar服务区域城市Birugo用种HDPE管1¼英寸,直径2½英寸,英寸2½英寸、3英寸4英寸、5英寸5½英寸、6英寸、7英寸、8英寸9英寸,10英寸,11英寸,12英寸。在Epanet 2.0软件运行了24小时的供水模式后,出现了几位aiserana area reservoar area Birugo的按压下降,这与最低标准的水服务(mka) /或1台atm机不匹配。关键词:管道网络,EPANET 2.0,评估,PDAM,高地。
{"title":"EVALUASI JARINGAN PIPA DISRIBUSI PERUMDA AIR MINUM TIRTA JAM GADANG KOTA BUKITTINGGI ZONA PELAYANAN RESERVOAR BIRUGO","authors":"Rendra Hidayat, Surya Eka Priana, Selpa Dewi","doi":"10.33559/err.v2i3.1773","DOIUrl":"https://doi.org/10.33559/err.v2i3.1773","url":null,"abstract":"Abstrak: Hinggan saat ini jaringan pipa Perumda Air Minum Tirta Jam Gadang Kota Bukittinggi telah tersebar sekitar 86,4% dari wilayah pelayanan walaupun masih ada sebagian wilayah yang dilakukan penggiliran dalam hal pendistribusian air. Dengan kondisi sistem perpipaan ( jaringan perpipaan ) zona pelayanan reservoar Birugo buatan Belanda dengan perhitungan diameter pipa 150 mm mampu melayani ±2.617 SR ( Sambungan Rumah ), dengan panjang bentang pipa terpasang ±23,183 Km dengan debit rata-rata ±17 L/dt dan terdapat penurunan atau pelanggan non aktif sebsar ±1.119 SR dengan total pelanggan potensial saat ini sebanyak ±8.666 SR. Kapasitas total kebutuhan air di zona pelayanan reservoar Birugo 190.929 m3/ bulan Pipa Distribusi Perumda Air Minum Trita Jam Gadang Kota Bukittingi zona pelayanan reservoar Birugo menggunakan pipa jenis HDPE dengan diameter 1 ¼ inchi, 1 ½ inchi, 2 inchi, 2 ½ inchi, 3 inchi, 4 inchi ,5 Inchi, 5 ½ inchi, 6 inchi, 7 inchi, 8 inchi, 9 inchi , 10 inchi, 11 inch, 12 inchi. Setelah software Epanet 2.0 dijalankan dengan pola pemakaian air selama 24 jam ditemukan beberapa titik pelayana zona reservoar Birugo mengalami penurunan tekan yang tidak memenuhi standar pelayanan tekanan Minimum 10 meter kolom air (mka) / atau 1 atm.Kata kunci : Jaringan pipa , EPANET 2.0, Evaluasi,PDAM, Bukittinggi.","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125708014","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Juita Sari, Renggita Octiani Safitri, Masril Masril, Asiya Nurhasanah Habirun
Abstrak: Aplikasi civil engineering calculator adalah program siap pakai yang direka untuk melaksanakan suatu fungsi bagi pengguna atau aplikasi yang lain dan dapat digunakan oleh sasaran yang dituju untuk mendapatkan suatu hasil perhitungan. Tujuan dari penelitian ini adalah membuka wawasan dan pengetahuan baru tentang teknologi dan database, menerapkan ilmu baik secara teknis maupun teori yang telah diperoleh selama mengikuti pendidikan ke dalam aplikasi nyata untuk memperoleh aplikasi yang dapat menghitung secara instan perhitungan tentang pembagian bahan dan tenaga kerja di teknik sipil khususnya beton dan atap. Perencanaan pembuatan aplikasi ini di rancang dengan aplikasi android studio. Sebelum perancangan dilakukan maka dibuat desain yang akan di pakai pada aplikasi, seperti desain logo, dan tampilan aplikasi yang akan di buat dengan bantuan canva. Hasil penelitian Aplikasi Civil Engineering Calculator didapat dari perkalian anatara indeks dan volume. Indeks yang di masukkan didapat dari AHSP sesuai SNI yang ada. Dari perencanaan pembuatan aplikasi ini maka diperoleh kesimpulan aplikasi dibuat dengan pemrograman java yang sudah tersedia di aplikasi android studio. Aplikasi civil engineering calculator terdiri dari beberapa menu seperti menu home, menu about, dan menu calculator yang mana dalam masing menu terdapat halaman yang memuat detail perhitungan beton dan atap.Kata Kunci: Aplikasi Mobile, android studio.
{"title":"PERANCANGAN APLIKASI CIVIL ENGINEERING CALCULATOR BERBASIS ANDROID MENGGUNAKAN VSODE DAN ANDROID STUDIO","authors":"Juita Sari, Renggita Octiani Safitri, Masril Masril, Asiya Nurhasanah Habirun","doi":"10.33559/err.v2i3.1772","DOIUrl":"https://doi.org/10.33559/err.v2i3.1772","url":null,"abstract":"Abstrak: Aplikasi civil engineering calculator adalah program siap pakai yang direka untuk melaksanakan suatu fungsi bagi pengguna atau aplikasi yang lain dan dapat digunakan oleh sasaran yang dituju untuk mendapatkan suatu hasil perhitungan. Tujuan dari penelitian ini adalah membuka wawasan dan pengetahuan baru tentang teknologi dan database, menerapkan ilmu baik secara teknis maupun teori yang telah diperoleh selama mengikuti pendidikan ke dalam aplikasi nyata untuk memperoleh aplikasi yang dapat menghitung secara instan perhitungan tentang pembagian bahan dan tenaga kerja di teknik sipil khususnya beton dan atap. Perencanaan pembuatan aplikasi ini di rancang dengan aplikasi android studio. Sebelum perancangan dilakukan maka dibuat desain yang akan di pakai pada aplikasi, seperti desain logo, dan tampilan aplikasi yang akan di buat dengan bantuan canva. Hasil penelitian Aplikasi Civil Engineering Calculator didapat dari perkalian anatara indeks dan volume. Indeks yang di masukkan didapat dari AHSP sesuai SNI yang ada. Dari perencanaan pembuatan aplikasi ini maka diperoleh kesimpulan aplikasi dibuat dengan pemrograman java yang sudah tersedia di aplikasi android studio. Aplikasi civil engineering calculator terdiri dari beberapa menu seperti menu home, menu about, dan menu calculator yang mana dalam masing menu terdapat halaman yang memuat detail perhitungan beton dan atap.Kata Kunci: Aplikasi Mobile, android studio.","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132773697","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Abstrak: Kondisi jalan yang baik akan mempermudah kegiatan mobilitasmasyarakat, bila terjadikerusakan jalan, maka akan terhalang kegiatan masyarakathingga dapat terjadi kecelakaan. Tujuan dari penelitian ini adalah untuk mengetahui jenis-jenis kerusakandan nilai indeks perkerasan jalan Bypass Bukittinggi, sehinggadapat membandingkan nilai kondisi ruas jalan Bypass Bukittinggi berdasarkan dua metode yang telah ditentukan. Metode yang digunakan adalah metode PCI(Pavement Condition Index) dan metode Bina Marga. Penilaian kondisi jalan pada metode PCI adalah dengan merangking dari nilai 0-100 sedangkan metode Bina Marga berdasarkan urutan prioritas jalan dengan rentang nilai 0-7. Jenis kerusakan yang ditemukan pada jalan Raya Batusangkar-Bukittinggi sepanjang 2 km antara lain lubang, retak blok, retak kulit buaya, kegemukan, tambalan dan butiran lepas. Pada metode PCI nilai rata-rata didapat adalah 84,63 yang merupakan kondisi jalan sangat baik (very good). Pada metode Bina Marga didapat nilai urutan prioritassebesar 11,05.Kata Kunci: Jalan, Metode PCI, Bina Marga
{"title":"ANALISIS KERUSAKAN JALAN PADA LAPISAN PERMUKAAN DENGAN METODE PCI DAN BINA MARGA","authors":"Fitri Aulia Rahmi, Ishak Ishak, Elfania Bastian","doi":"10.33559/err.v2i3.1759","DOIUrl":"https://doi.org/10.33559/err.v2i3.1759","url":null,"abstract":"Abstrak: Kondisi jalan yang baik akan mempermudah kegiatan mobilitasmasyarakat, bila terjadikerusakan jalan, maka akan terhalang kegiatan masyarakathingga dapat terjadi kecelakaan. Tujuan dari penelitian ini adalah untuk mengetahui jenis-jenis kerusakandan nilai indeks perkerasan jalan Bypass Bukittinggi, sehinggadapat membandingkan nilai kondisi ruas jalan Bypass Bukittinggi berdasarkan dua metode yang telah ditentukan. Metode yang digunakan adalah metode PCI(Pavement Condition Index) dan metode Bina Marga. Penilaian kondisi jalan pada metode PCI adalah dengan merangking dari nilai 0-100 sedangkan metode Bina Marga berdasarkan urutan prioritas jalan dengan rentang nilai 0-7. Jenis kerusakan yang ditemukan pada jalan Raya Batusangkar-Bukittinggi sepanjang 2 km antara lain lubang, retak blok, retak kulit buaya, kegemukan, tambalan dan butiran lepas. Pada metode PCI nilai rata-rata didapat adalah 84,63 yang merupakan kondisi jalan sangat baik (very good). Pada metode Bina Marga didapat nilai urutan prioritassebesar 11,05.Kata Kunci: Jalan, Metode PCI, Bina Marga","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127277217","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Abstrak:Banjir yang sering terjadi di kota Bukittinggi umumnya disebabkan oleh tingginya curah hujan dan intensitas yang lama sehingga saluran drainase yang ada tidak mampu mengalirkan air. Daerah Birugo, Belakang Balok dan Pasar Bawah merupakan daerah yang sering mengalami banjir saat musim hujan. Tujuan penelitian untuk mengevaluasi kapasitas saluran drainase pada daerah Birugo, Belakang Balok dan Pasar Bawah. Manfaat penelitian ini untuk memprediksi banjir-banjir yang akan datang dan memberi masukan dalam upaya pengendalian banjir. Metode perhitungan frekuensi curah hujan yang digunakan adalah metode Gumbel yang didasari dari hasil pemilihan distribusi. Penelitian ini menggunakan aplikasi model EPA SWMM 5.1 untuk menganalisis jaringan drainase yang ada. Kemudian memodelkan peta daerah pengalirannya sehingga kemudian dapat dievaluasi menggunakan debit rencana curah hujan. Berdasarkan hasil simulasi yang telah dilakukan dengan analisis periode ulang 2 dan 5 tahun didapatkan sebanyak 3 titik persimpangan saluran (junction) yang sama-sama mengalami limpasan. Dimana titik J22 menjadi titik dengan debit aliran terbesar yaitu 1,57 m3/s pada periode ulang lima tahun. Dari penelitian ini dapat disimpulkan bahwa titik sambungan yang mengalami limpasan disebabkan oleh elevasi yang rendah dan dimensi saluran drainase yang tidak memadai.Kata kunci : Curah Hujan Rencana, Drainase, EPA SWMM 5.1, Limpasan, Hyetograph
{"title":"EVALUASI SALURAN DRAINASE PRIMER JALAN SUDIRMAN SAMPAI JALAN PEMUDA KOTA BUKITTINGGI","authors":"Febrik Apahdil, Masril Masril, Deddy Kurniawan","doi":"10.33559/err.v2i3.1766","DOIUrl":"https://doi.org/10.33559/err.v2i3.1766","url":null,"abstract":"Abstrak:Banjir yang sering terjadi di kota Bukittinggi umumnya disebabkan oleh tingginya curah hujan dan intensitas yang lama sehingga saluran drainase yang ada tidak mampu mengalirkan air. Daerah Birugo, Belakang Balok dan Pasar Bawah merupakan daerah yang sering mengalami banjir saat musim hujan. Tujuan penelitian untuk mengevaluasi kapasitas saluran drainase pada daerah Birugo, Belakang Balok dan Pasar Bawah. Manfaat penelitian ini untuk memprediksi banjir-banjir yang akan datang dan memberi masukan dalam upaya pengendalian banjir. Metode perhitungan frekuensi curah hujan yang digunakan adalah metode Gumbel yang didasari dari hasil pemilihan distribusi. Penelitian ini menggunakan aplikasi model EPA SWMM 5.1 untuk menganalisis jaringan drainase yang ada. Kemudian memodelkan peta daerah pengalirannya sehingga kemudian dapat dievaluasi menggunakan debit rencana curah hujan. Berdasarkan hasil simulasi yang telah dilakukan dengan analisis periode ulang 2 dan 5 tahun didapatkan sebanyak 3 titik persimpangan saluran (junction) yang sama-sama mengalami limpasan. Dimana titik J22 menjadi titik dengan debit aliran terbesar yaitu 1,57 m3/s pada periode ulang lima tahun. Dari penelitian ini dapat disimpulkan bahwa titik sambungan yang mengalami limpasan disebabkan oleh elevasi yang rendah dan dimensi saluran drainase yang tidak memadai.Kata kunci : Curah Hujan Rencana, Drainase, EPA SWMM 5.1, Limpasan, Hyetograph","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"46 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116461396","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Abstrak: Penerapan BIM di era revolusi saat ini bertujuan untuk menghemat biaya proyek dan meminimalisir resiko kesalahan pekerjaan dan yang terpenting adalah memudahkan koordinasi antar pihak. BIM berfungsi sebagai suatu alat atau metode yang digunakan untuk memastikan pekerjaan di lapangan sesuai dengan apa yang telah direncanakan. BIM di Indonesia sudah mulai diadopsi oleh beberapa pelaku konstruksi meski masih terbatas yang sebagian besar dimanfaatkan pada fase desain dan teknik untuk proyek-proyek besar. Penelitian ini dilakukan pada proyek pembangunan Gedung Ruang Kelas baru MT sN Padusunan yang berlokasi di MTsN 1 Kota Pariaman Jl. Syech Abdul Arief Desa Pauh Barat Kec. Pariaman Tengah Kota Pariaman. Pengambilan data dilakukan dengan cara mengumpulkan data-data dari konsultan seperti AutoCAD. Data yang diperoleh, kemudiann dibuat pemodelan 3D dan dianalisis Schedule dengan menggunakan salah satu aplikasi kolaborasi dari Building Information Modeling (BIM) yaitu OpenBuildings Designer. Setelah membuat pemodelan 3D dengan Software OpenBuildings Designer didapat dari pemodelan Architectural lantai 1 sampai dengan atap, pemodeln Struktural dari lantai 1 sampai dengan atap, pemodelan Electrical perletakanpower, lighting danfire alarm.Kata kunci : Building Information Modeling (BIM), OpenBuildings Designer, pemodelan Architectural, pemodelan Struktural, pemodelan Electrical
{"title":"IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) PADA GEDUNG RUANG KELAS BARU MTSN PADUSUNAN PARIAMAN","authors":"Vivi Rahmadhini, Ishak Ishak, Elfania Bastian","doi":"10.33559/err.v2i3.1768","DOIUrl":"https://doi.org/10.33559/err.v2i3.1768","url":null,"abstract":"Abstrak: Penerapan BIM di era revolusi saat ini bertujuan untuk menghemat biaya proyek dan meminimalisir resiko kesalahan pekerjaan dan yang terpenting adalah memudahkan koordinasi antar pihak. BIM berfungsi sebagai suatu alat atau metode yang digunakan untuk memastikan pekerjaan di lapangan sesuai dengan apa yang telah direncanakan. BIM di Indonesia sudah mulai diadopsi oleh beberapa pelaku konstruksi meski masih terbatas yang sebagian besar dimanfaatkan pada fase desain dan teknik untuk proyek-proyek besar. Penelitian ini dilakukan pada proyek pembangunan Gedung Ruang Kelas baru MT sN Padusunan yang berlokasi di MTsN 1 Kota Pariaman Jl. Syech Abdul Arief Desa Pauh Barat Kec. Pariaman Tengah Kota Pariaman. Pengambilan data dilakukan dengan cara mengumpulkan data-data dari konsultan seperti AutoCAD. Data yang diperoleh, kemudiann dibuat pemodelan 3D dan dianalisis Schedule dengan menggunakan salah satu aplikasi kolaborasi dari Building Information Modeling (BIM) yaitu OpenBuildings Designer. Setelah membuat pemodelan 3D dengan Software OpenBuildings Designer didapat dari pemodelan Architectural lantai 1 sampai dengan atap, pemodeln Struktural dari lantai 1 sampai dengan atap, pemodelan Electrical perletakanpower, lighting danfire alarm.Kata kunci : Building Information Modeling (BIM), OpenBuildings Designer, pemodelan Architectural, pemodelan Struktural, pemodelan Electrical","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129254420","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
The development of science must be accompanied by adequate facilities and infrastructure. Due to the increase in needs that must be met, the existing building is unable to accommodate learning activities. For this reason, it is necessary to improve facilities and infrastructure in the form of building additions, renovations or construction of new buildings, as is the case with the YATI Kamang Mudik Islamic Boarding School. With the increase in the number of students and the inadequate condition of the building, it is necessary to add a new building. This became the basis for the author to plan a new class building Ponpes YATI. From the results of the structural analysis, the structure repeating was obtained, the analysis that the author got was, the material used was steel fy = 420Mpa and fc '= 20.75Mpa. For the reinforcement of the floor plate, reinforcement is used for the direction x=Ø10-150, while the direction y=Ø1 0-150 is used. Ground floor column planning uses steel fy=240Mpa and fc'=24.9Mpa. With a size of 45cmX45cm. The planning of the 1st floor column uses steel fy=240Mpa and fc'=24.9Mpa. With a size of 40cmX40cm. The 2nd floor column planning uses fy=240Mpa and fc'=20.75Mpa steel. With a size of 35cm X 35cm. The planning of the 3rd floor column uses steel fy=240Mpa dan fc'=20.75Mpa. With a size of 35cmX35cm. While beam planning, for the main beam uses steel fy = 420Mpa and fc '= 20.75Mpa with a beam size of 50cmX30cm, for beam 2 and child beams using steel fy = 400Mpa and fc '= 20.75Mpa with a beam size of 2 45cmX25cm and a child beam of 35cmX25cm. Keywords: Building, Construction, Reinforcement, Steel Quality, Concrete Quality
{"title":"PERENCANAAN STRUKTUR ATAS RUANG BELAJAR PONDOK PESANTREN YATI/YAYASAN TARBIYAH ISLAMIYAH KAMANG MUDIK","authors":"Fajri Hamdani, Surya Eka Priana, F. Herista","doi":"10.33559/err.v2i2.1708","DOIUrl":"https://doi.org/10.33559/err.v2i2.1708","url":null,"abstract":"The development of science must be accompanied by adequate facilities and infrastructure. Due to the increase in needs that must be met, the existing building is unable to accommodate learning activities. For this reason, it is necessary to improve facilities and infrastructure in the form of building additions, renovations or construction of new buildings, as is the case with the YATI Kamang Mudik Islamic Boarding School. With the increase in the number of students and the inadequate condition of the building, it is necessary to add a new building. This became the basis for the author to plan a new class building Ponpes YATI. From the results of the structural analysis, the structure repeating was obtained, the analysis that the author got was, the material used was steel fy = 420Mpa and fc '= 20.75Mpa. For the reinforcement of the floor plate, reinforcement is used for the direction x=Ø10-150, while the direction y=Ø1 0-150 is used. Ground floor column planning uses steel fy=240Mpa and fc'=24.9Mpa. With a size of 45cmX45cm. The planning of the 1st floor column uses steel fy=240Mpa and fc'=24.9Mpa. With a size of 40cmX40cm. The 2nd floor column planning uses fy=240Mpa and fc'=20.75Mpa steel. With a size of 35cm X 35cm. The planning of the 3rd floor column uses steel fy=240Mpa dan fc'=20.75Mpa. With a size of 35cmX35cm. While beam planning, for the main beam uses steel fy = 420Mpa and fc '= 20.75Mpa with a beam size of 50cmX30cm, for beam 2 and child beams using steel fy = 400Mpa and fc '= 20.75Mpa with a beam size of 2 45cmX25cm and a child beam of 35cmX25cm. Keywords: Building, Construction, Reinforcement, Steel Quality, Concrete Quality","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"118 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121375167","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Shinta Andira, Deddy Kurniawan, Ana Susanti Yusman
The number of buildings that collapsed was caused by the ability of a structure that was not able to support the working load, causing significant loss of property and even life. Therefore, in planning the design of a building structure, it must be really full of accuracy, careful calculations and according to the requirements with reference to the Indonesian National Standard (Indonesian Loading Regulations for Buildings and Buildings SNI-2847-2019 and SNI-1726-2019). This study aims to plan the dimensions of structural elements, calculation of structural reinforcement. The structural element data used are the results of the preliminary design (Preliminary Design). The analysis is assisted by the SAP2000 Version 11 program with the selection of a network system structure system (Grid System). Based on the results of the Preliminary design calculation, data is obtained for the use of the superstructure of the 1st floor to the 3rd floor where the cross section of the main column is 40 x 50 cm, the terrace column is 30x30 cm, the main beam is 30x40 cm, and the joist is 20x30 cm. The planning of floor slabs and also not concrete which was carried out with Preliminary design was found to be 12 cm thick. Planning for the foundation using a well foundation with a depth of 2 meters, and using a concrete buis with a diameter of 1 meterKeywords: Preliminary design, SAP2000 analysis, reinforcement calculation, foundation bearing capacity
{"title":"PERENCANAAN PEMBANGUNAN GEDUNG BARU 3 LANTAI “TABEK MAINAN” DI JALAN M.YAMIN KELURAHAN AUR KUNING KECAMATAN AUR BIRUGO TIGO BALEH KOTA BUKITTINGGI","authors":"Shinta Andira, Deddy Kurniawan, Ana Susanti Yusman","doi":"10.33559/err.v2i2.1714","DOIUrl":"https://doi.org/10.33559/err.v2i2.1714","url":null,"abstract":"The number of buildings that collapsed was caused by the ability of a structure that was not able to support the working load, causing significant loss of property and even life. Therefore, in planning the design of a building structure, it must be really full of accuracy, careful calculations and according to the requirements with reference to the Indonesian National Standard (Indonesian Loading Regulations for Buildings and Buildings SNI-2847-2019 and SNI-1726-2019). This study aims to plan the dimensions of structural elements, calculation of structural reinforcement. The structural element data used are the results of the preliminary design (Preliminary Design). The analysis is assisted by the SAP2000 Version 11 program with the selection of a network system structure system (Grid System). Based on the results of the Preliminary design calculation, data is obtained for the use of the superstructure of the 1st floor to the 3rd floor where the cross section of the main column is 40 x 50 cm, the terrace column is 30x30 cm, the main beam is 30x40 cm, and the joist is 20x30 cm. The planning of floor slabs and also not concrete which was carried out with Preliminary design was found to be 12 cm thick. Planning for the foundation using a well foundation with a depth of 2 meters, and using a concrete buis with a diameter of 1 meterKeywords: Preliminary design, SAP2000 analysis, reinforcement calculation, foundation bearing capacity","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121935396","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Banda Musajik, which is located in Jorong Alahan Anggang, Nagari Tigo Koto Silungkang, Agam Regency, West Sumatra Province, is one of the irrigation networks in D.I Gumarang, under the authority of the UPTD Balai SDA and BK North Sumatra Province. The service area is 30 ha, the water source comes from Batang alahan anggang. Weir planning is based on the design flood discharge with a return period of 100 years. The discharge plan uses 10 years of rainfall data. Rainfall stations that affect the Alahan Anggang watershed are Gumarang Station and Kampuang IV Station. The area's average rainfall was determined by the Thiessen Polygon method, the planned rain by the log normal method and the frequency analysis test using the chi square test. Maximum flood discharge (Q100) 13.54 m3/s. The effective width of the dam is 11.42 m, one flush door is 0.80 m wide, one pillar is 0.50 m thick. The type of lighthouse is round with a radius of 0.80 m and a height of 1.52 m. The stilling pool is planned for the Vlugter type with the height of the weir, the length of the pool floor and the radius of the weir of 3.74 m. The length of the flood embankment from the weir to the upstream is 19 m with a height of 0.50 m from the flood water level. From the analysis of the forces acting on the body of the weir, the number of vertical forces (ΣRV) is 5,916 T, the number of horizontal forces (ΣRH) is 8,397 T, the number of holding moments (ΣMT) is 352,678 T.m, the number of overturning moments (ΣMG) is 344,87 T.m. stability of the weir body against overturning 1.31 1.3 , against shear 1.42 1.3, Eccentricity ( e ) 5.05 78.74 Maximum stress 1.90 78.74, minimum stress -0.36 78.7, the design of the weir body is safe against shearing, overturning, and the bearing capacity of the ground.Key words : Hydrological analysis, Hydraulic design of weir, Weir stability.
{"title":"PERENCANAAN BENDUNG TETAP UNTUK JARINGAN IRIGASI BANDA MUSAJIK D.I GUMARANG KECAMATAN PELEMBAYAN KABUPATEN AGAM","authors":"Dodi Dodi, Masril Masril, Ana Susanti Yusman","doi":"10.33559/err.v2i2.1705","DOIUrl":"https://doi.org/10.33559/err.v2i2.1705","url":null,"abstract":"Banda Musajik, which is located in Jorong Alahan Anggang, Nagari Tigo Koto Silungkang, Agam Regency, West Sumatra Province, is one of the irrigation networks in D.I Gumarang, under the authority of the UPTD Balai SDA and BK North Sumatra Province. The service area is 30 ha, the water source comes from Batang alahan anggang. Weir planning is based on the design flood discharge with a return period of 100 years. The discharge plan uses 10 years of rainfall data. Rainfall stations that affect the Alahan Anggang watershed are Gumarang Station and Kampuang IV Station. The area's average rainfall was determined by the Thiessen Polygon method, the planned rain by the log normal method and the frequency analysis test using the chi square test. Maximum flood discharge (Q100) 13.54 m3/s. The effective width of the dam is 11.42 m, one flush door is 0.80 m wide, one pillar is 0.50 m thick. The type of lighthouse is round with a radius of 0.80 m and a height of 1.52 m. The stilling pool is planned for the Vlugter type with the height of the weir, the length of the pool floor and the radius of the weir of 3.74 m. The length of the flood embankment from the weir to the upstream is 19 m with a height of 0.50 m from the flood water level. From the analysis of the forces acting on the body of the weir, the number of vertical forces (ΣRV) is 5,916 T, the number of horizontal forces (ΣRH) is 8,397 T, the number of holding moments (ΣMT) is 352,678 T.m, the number of overturning moments (ΣMG) is 344,87 T.m. stability of the weir body against overturning 1.31 1.3 , against shear 1.42 1.3, Eccentricity ( e ) 5.05 78.74 Maximum stress 1.90 78.74, minimum stress -0.36 78.7, the design of the weir body is safe against shearing, overturning, and the bearing capacity of the ground.Key words : Hydrological analysis, Hydraulic design of weir, Weir stability.","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"96 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127998378","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Prasarana transportasi memiliki bagian yang sangat besar lancarnya arus lalu lintas. Semua orang berharap dan bertujuan untuk mewujudkan lalu lintas yang aman dan nyaman. Tingkat keselamatan pada siswa-siswi, guru, dan masyarakat di sekitar sekolah sangat rendah, banyaknya kasus kecelakaan pada saat menyeberang jalan ketika pergi ke sekolah maupun pulang sekolah. Ditinjau Zona Selamat Sekolah (ZoSS) yang berada di lingkungan Sekolah Dasar Negeri (SDN) 05 Tarung-Tarung Utara yang berada pada 2 lajur 2 arah tak terbagi. Penelitian ini dilakukan untuk mengevaluasi perilaku penyeberang jalan, perilaku pengantar, kecepatan kendaraan dan kondisi arus lalu lintas pada Zona Selamat Sekolah. Hasil dari penelitian tersebut, menunjukkan volume kendaraan terbanyak pada hari senin pukul 2120,4 smp, penyeberang jalan dan pengantar belum selamat karena Zhitung < Ztabel, kecepatan kendaraan sedang melintas ZoSS adalah 60,93959512 km/jam. Kemudian V/C ratio sebesar 0,34 sehingga kinerja jalan termasuk Level Of Service B. Survey kendaraan, perilaku penyeberang jalan, perilaku pengantar, dan kecepatan kendaraan pelajar dinyatakan belum selamat dan Zona Selamat Sekolah (ZoSS) di depan sekolah SDN 05 Tarung-Tarung Utara belum efektif.Kata kunci : Zona Selamat Sekolah (ZoSS),arus lalu lintas, efektifitas jalan,
{"title":"ANALISIS TINGKAT KESELAMAT ZONA SELAMAT SEKOLAH SDN 05 TARUNG-TARUNG UTARA KECAMATAN RAO","authors":"Juharni Fardilla, Helga Yermadona, Selpa Dewi","doi":"10.33559/err.v2i2.1693","DOIUrl":"https://doi.org/10.33559/err.v2i2.1693","url":null,"abstract":"Prasarana transportasi memiliki bagian yang sangat besar lancarnya arus lalu lintas. Semua orang berharap dan bertujuan untuk mewujudkan lalu lintas yang aman dan nyaman. Tingkat keselamatan pada siswa-siswi, guru, dan masyarakat di sekitar sekolah sangat rendah, banyaknya kasus kecelakaan pada saat menyeberang jalan ketika pergi ke sekolah maupun pulang sekolah. Ditinjau Zona Selamat Sekolah (ZoSS) yang berada di lingkungan Sekolah Dasar Negeri (SDN) 05 Tarung-Tarung Utara yang berada pada 2 lajur 2 arah tak terbagi. Penelitian ini dilakukan untuk mengevaluasi perilaku penyeberang jalan, perilaku pengantar, kecepatan kendaraan dan kondisi arus lalu lintas pada Zona Selamat Sekolah. Hasil dari penelitian tersebut, menunjukkan volume kendaraan terbanyak pada hari senin pukul 2120,4 smp, penyeberang jalan dan pengantar belum selamat karena Zhitung < Ztabel, kecepatan kendaraan sedang melintas ZoSS adalah 60,93959512 km/jam. Kemudian V/C ratio sebesar 0,34 sehingga kinerja jalan termasuk Level Of Service B. Survey kendaraan, perilaku penyeberang jalan, perilaku pengantar, dan kecepatan kendaraan pelajar dinyatakan belum selamat dan Zona Selamat Sekolah (ZoSS) di depan sekolah SDN 05 Tarung-Tarung Utara belum efektif.Kata kunci : Zona Selamat Sekolah (ZoSS),arus lalu lintas, efektifitas jalan, ","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114497066","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
I. Perdana, M. Akbar, Rekha Wulandari Putri Yuda, Helga Yermadona, Elfania Bastian
The purpose of this study is to create and implement an effective program to facilitate users or the public in making and compiling budget estimates for building houses, namely by designing an application for calculating the Budget Plan (RAB) by designing using use case diagrams, creating a system with the design that has been made and implement the system that has been made and perform system testing. In collecting data, researchers used the method of observation, interviews and literature study. Meanwhile, the researcher also uses a common analytical method in the computer field, namely the System Development Life Cycle (SDLC). SDLC is an evolutionary process followed in implementing a computer-based information system or subsystem. The design of this information system uses a web programming language, namely PHP, and the database used is MySQL. This research produces an application for calculating the Budget Plan that helps users or the public to make it easier to prepare budget estimates for house construction from the initial stage to the completion of the construction.Keywords: Design, Information System, RAB Calculation, Simple house, MySQL Database.
{"title":"PERANCANGAN SISTEM INFORMASI RENCANA ANGGARAN BIAYA (RAB) RUMAH SEDERHANA BERBASIS WEB","authors":"I. Perdana, M. Akbar, Rekha Wulandari Putri Yuda, Helga Yermadona, Elfania Bastian","doi":"10.33559/err.v2i2.1713","DOIUrl":"https://doi.org/10.33559/err.v2i2.1713","url":null,"abstract":"The purpose of this study is to create and implement an effective program to facilitate users or the public in making and compiling budget estimates for building houses, namely by designing an application for calculating the Budget Plan (RAB) by designing using use case diagrams, creating a system with the design that has been made and implement the system that has been made and perform system testing. In collecting data, researchers used the method of observation, interviews and literature study. Meanwhile, the researcher also uses a common analytical method in the computer field, namely the System Development Life Cycle (SDLC). SDLC is an evolutionary process followed in implementing a computer-based information system or subsystem. The design of this information system uses a web programming language, namely PHP, and the database used is MySQL. This research produces an application for calculating the Budget Plan that helps users or the public to make it easier to prepare budget estimates for house construction from the initial stage to the completion of the construction.Keywords: Design, Information System, RAB Calculation, Simple house, MySQL Database. ","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124796029","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}