Project risk management in practice: the actuality of project risk management in organizations 项目风险管理实践:组织中项目风险管理的实际情况
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-08-01 DOI: 10.1108/ijmpb-09-2023-0214
Pelle Lundquist Willumsen, Josef Oehmen, Hani Mike Rae Selim

Purpose

This paper explores how risks are managed in project practice beyond formalized risk management processes by applying the lens of actuality research to project risk management.

Design/methodology/approach

The paper follows a qualitative multimethod research approach utilizing literature review, interviews, observations and document analysis. The paper is based on three case studies and one interview study in project organizations facing green transition challenges.

Findings

Little work exists to reveal how risk management is actually done by project practitioners, and why. Few studies report on contextual variation and consider confounding factors beyond a “one size fits all” formalized explicit risk management process, despite ample evidence that risks are managed outside the formal process. The study documents that informal and/or implicit risk management activities add significantly more value.

Originality/value

The paper contributes a literature review of research into the actuality of project risk management, a sense-making framework of how risks are managed in practice beyond the formal, explicit risk-management process by including informal and/or implicit risk management activities, an empirical study of risk-management practice highlighting that informal and/or implicit risk-management activities dominate in practice, a discussion of why risks are managed outside formalized, explicit process and a research agenda to enable the design of impactful project risk-management practices.

本文采用定性多方法研究方法,利用文献综述、访谈、观察和文件分析,对面临绿色转型挑战的项目组织进行了三项案例研究和一项访谈研究。本文基于三项案例研究和一项访谈研究,研究对象是面临绿色转型挑战的项目组织。研究结果揭示项目从业人员如何实际进行风险管理以及原因的工作很少。尽管有大量证据表明,风险管理是在正式流程之外进行的,但很少有研究对环境变化进行报告,也很少考虑 "一刀切 "的正式明确风险管理流程之外的干扰因素。本文对项目风险管理实际情况的研究进行了文献综述,提出了在正式、明确的风险管理流程之外如何通过包括非正式和/或隐性风险管理活动进行风险管理的感性框架,对风险管理实践进行了实证研究,强调非正式和/或隐性风险管理活动在实践中占主导地位,讨论了在正式、明确的流程之外进行风险管理的原因,并提出了研究议程,以便设计有影响力的项目风险管理实践。
{"title":"Project risk management in practice: the actuality of project risk management in organizations","authors":"Pelle Lundquist Willumsen, Josef Oehmen, Hani Mike Rae Selim","doi":"10.1108/ijmpb-09-2023-0214","DOIUrl":"https://doi.org/10.1108/ijmpb-09-2023-0214","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This paper explores how risks are managed in project practice beyond formalized risk management processes by applying the lens of actuality research to project risk management.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The paper follows a qualitative multimethod research approach utilizing literature review, interviews, observations and document analysis. The paper is based on three case studies and one interview study in project organizations facing green transition challenges.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Little work exists to reveal how risk management is actually done by project practitioners, and why. Few studies report on contextual variation and consider confounding factors beyond a “one size fits all” formalized explicit risk management process, despite ample evidence that risks are managed outside the formal process. The study documents that informal and/or implicit risk management activities add significantly more value.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The paper contributes a literature review of research into the actuality of project risk management, a sense-making framework of how risks are managed in practice beyond the formal, explicit risk-management process by including informal and/or implicit risk management activities, an empirical study of risk-management practice highlighting that informal and/or implicit risk-management activities dominate in practice, a discussion of why risks are managed outside formalized, explicit process and a research agenda to enable the design of impactful project risk-management practices.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141882127","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Developing project-based supplier relations in a programmatic multi-project context: an exemplary case study from the construction industry 在计划性多项目背景下发展以项目为基础的供应商关系:来自建筑业的典范案例研究
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-24 DOI: 10.1108/ijmpb-09-2023-0222
Gijsbert van de Waerdt, Leentje Volker, Lynn Vosman, Hans Voordijk

Purpose

The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers in a project-based industry.

Design/methodology/approach

A multiple case study research is conducted. Data are collected from two case studies in the construction infrastructure sector. Eleven interviews with contractors and other suppliers are the primary source of data collection. The data are complemented by procurement documents and expert consultations.

Findings

The findings show that within a programmatic multi-project context, PBFs settle relations with (1) key partners for program management capacity, PBFs establish relations with (2) main contractors to divide projects and (innovation) tasks, and PBFs intensify relations with (3) suppliers to ensure continuity and expertise.

Research limitations/implications

The study contributes to the body of project management literature by exploring PBF’s relations with other PBFs and suppliers in a multi-project context. Based on empirical data, the study provides a distinction in layers presenting distinct levels of PBF’s supplier relations. This layer structure provides an excellent starting point for future studies exploring the program perspective of PBFs in the integrated supply chain.

Originality/value

Given the increase in programmatic multi-project context for project-based domains, discussed in both literature and practice, this study explores the effect of programs on relations of PBFs with other PBFs and suppliers. The study distinguishes PBF’s relations with the different suppliers in three layers and discusses the characteristics of these relations.

目的 本研究旨在探讨在以项目为基础的行业中,方案性多项目背景如何影响项目型企业(PBFs)组织其与其他项目型企业和供应商的关系。从建筑基础设施行业的两个案例研究中收集数据。数据收集的主要来源是与承包商和其他供应商进行的 11 次访谈。研究结果研究结果表明,在一个多项目的项目背景下,公共预算基金与(1)主要合作伙伴建立关系以获得项目管理能力,公共预算基金与(2)主要承包商建立关系以划分项目和(创新)任务,公共预算基金加强与(3)供应商的关系以确保连续性和专业性。研究局限/影响本研究通过探讨公共预算基金在多项目背景下与其他公共预算基金和供应商的关系,为项目管理文献做出了贡献。根据经验数据,本研究对 PBF 的供应商关系进行了层级区分。本研究探讨了项目对 PBF 与其他 PBF 和供应商关系的影响。研究将 PBF 与不同供应商的关系分为三个层次,并讨论了这些关系的特点。
{"title":"Developing project-based supplier relations in a programmatic multi-project context: an exemplary case study from the construction industry","authors":"Gijsbert van de Waerdt, Leentje Volker, Lynn Vosman, Hans Voordijk","doi":"10.1108/ijmpb-09-2023-0222","DOIUrl":"https://doi.org/10.1108/ijmpb-09-2023-0222","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers in a project-based industry.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A multiple case study research is conducted. Data are collected from two case studies in the construction infrastructure sector. Eleven interviews with contractors and other suppliers are the primary source of data collection. The data are complemented by procurement documents and expert consultations.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings show that within a programmatic multi-project context, PBFs settle relations with (1) key partners for program management capacity, PBFs establish relations with (2) main contractors to divide projects and (innovation) tasks, and PBFs intensify relations with (3) suppliers to ensure continuity and expertise.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The study contributes to the body of project management literature by exploring PBF’s relations with other PBFs and suppliers in a multi-project context. Based on empirical data, the study provides a distinction in layers presenting distinct levels of PBF’s supplier relations. This layer structure provides an excellent starting point for future studies exploring the program perspective of PBFs in the integrated supply chain.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Given the increase in programmatic multi-project context for project-based domains, discussed in both literature and practice, this study explores the effect of programs on relations of PBFs with other PBFs and suppliers. The study distinguishes PBF’s relations with the different suppliers in three layers and discusses the characteristics of these relations.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141864343","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring the impact of absorptive capacity to navigate the challenges of uncertainty in digitalization projects 探索吸收能力对数字化项目应对不确定性挑战的影响
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-24 DOI: 10.1108/ijmpb-01-2024-0013
Bertha Joseph Ngereja, Bassam Hussein, Carsten Wolff

Purpose

This research fills a gap in digitalization project studies by exploring them through the lens of organizational learning. It investigates the impact of uncertainty on digitalization project success and the role of absorptive capacity.

Design/methodology/approach

A mixed-methods approach is adopted, incorporating qualitative and quantitative analyses. The qualitative part assesses how uncertainty affects digitalization project success, while the quantitative side explores absorptive capacity as a mediating factor between adaptability to uncertainty and project success.

Findings

The qualitative results uncover challenges facing digitalization projects under uncertainty and suggests coping strategies at individual, project, and organizational levels. Quantitative results show that both potential and realized absorptive capacities significantly mediate the link between adaptability to uncertainty in the environment and project success.

Originality/value

This research offers new insights into digitalization project studies, merging organizational learning theory with a mixed-methods approach. It highlights how uncertainty and absorptive capacity influence digitalization project success.

目的本研究通过组织学习的视角探索数字化项目,填补了数字化项目研究的空白。研究调查了不确定性对数字化项目成功的影响,以及吸收能力的作用。设计/方法/方法采用混合方法,结合定性和定量分析。定性分析部分评估了不确定性如何影响数字化项目的成功,而定量分析则探讨了吸收能力作为不确定性适应能力与项目成功之间的中介因素的作用。定量结果表明,潜在的和已实现的吸收能力在很大程度上调节了对环境不确定性的适应性与项目成功之间的联系。原创性/价值这项研究将组织学习理论与混合方法相结合,为数字化项目研究提供了新的见解。它强调了不确定性和吸收能力如何影响数字化项目的成功。
{"title":"Exploring the impact of absorptive capacity to navigate the challenges of uncertainty in digitalization projects","authors":"Bertha Joseph Ngereja, Bassam Hussein, Carsten Wolff","doi":"10.1108/ijmpb-01-2024-0013","DOIUrl":"https://doi.org/10.1108/ijmpb-01-2024-0013","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This research fills a gap in digitalization project studies by exploring them through the lens of organizational learning. It investigates the impact of uncertainty on digitalization project success and the role of absorptive capacity.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A mixed-methods approach is adopted, incorporating qualitative and quantitative analyses. The qualitative part assesses how uncertainty affects digitalization project success, while the quantitative side explores absorptive capacity as a mediating factor between adaptability to uncertainty and project success.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The qualitative results uncover challenges facing digitalization projects under uncertainty and suggests coping strategies at individual, project, and organizational levels. Quantitative results show that both potential and realized absorptive capacities significantly mediate the link between adaptability to uncertainty in the environment and project success.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research offers new insights into digitalization project studies, merging organizational learning theory with a mixed-methods approach. It highlights how uncertainty and absorptive capacity influence digitalization project success.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141770761","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project success factors for leadership practices and communication: challenges in the construction sector 领导实践和交流的项目成功因素:建筑业面临的挑战
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-22 DOI: 10.1108/ijmpb-12-2023-0279
Ashok Rehan, David Thorpe, Amirhossein Heravi

Purpose

The study examines the project success factors for leadership behavioural practices and communication impacting project success, providing empirical evidence to address the challenges in the digitalized environment in the Australian construction sector.

Design/methodology/approach

A quantitative approach was employed to collect survey data from 109 project managers and followers (project engineers, supervisors, team members, and senior managers) with diverse project management experience in the construction sector. An exploratory factors analysis/multivariate regression/relative importance index/t-test was used to identify the key project success factors and validate the study's results.

Findings

Data analysis identified four key project success factors: (1) Relationship Management, (2) Leading by Example, (3) Self-Management, and (4) Effective Communication, along with seventeen “behavioural practices attributes” impacting project success positively and significantly and emphasizing inclusiveness, relationship building, self-feedback objectivity, sharing information, collaboratively resolving disputes, and controlling emotions that significantly impact project success.

Practical implications

The study's results will address the industry's challenges in the complex digitalized environment and specific issues experienced in the construction industry: delays and inefficiencies, supply chain management, communication barriers with multicultural workforce and safety protocols implementation, regulatory and safety compliance, infrastructure demands, skills shortages, sustainability, and new technology adoption to achieve project success.

Originality/value

The quantification of research findings, employing an innovative approach, underscores the distinctive nature of this study. The key success factors will help formulate innovative practices using stakeholder analysis, communication plans, conflict resolution strategies, promoting collaboration, safety leadership, providing cultural awareness, and enhancing the decision-making process to face challenges in the construction sector.

目的 本研究探讨了影响项目成功的领导行为实践和沟通方面的项目成功因素,为应对澳大利亚建筑行业数字化环境中的挑战提供了实证证据。设计/方法/途径 采用定量方法收集了 109 名具有不同建筑行业项目管理经验的项目经理和追随者(项目工程师、主管、团队成员和高级经理)的调查数据。通过探索性因素分析/多元回归/相对重要性指数/检验,确定了项目成功的关键因素,并验证了研究结果:(1)关系管理;(2)以身作则;(3)自我管理;(4)有效沟通,以及 17 个对项目成功有积极和显著影响的 "行为实践属性",这些属性强调包容性、关系建设、自我反馈的客观性、信息共享、合作解决争端和控制情绪,对项目成功有显著影响。实践意义研究结果将解决建筑行业在复杂的数字化环境中面临的挑战,以及建筑行业遇到的具体问题:延误和效率低下、供应链管理、与多元文化劳动力的沟通障碍和安全协议的实施、法规和安全合规性、基础设施需求、技能短缺、可持续性和新技术的采用,以实现项目的成功。原创性/价值采用创新方法对研究结果进行量化,突出了本研究的独特性。成功的关键因素将有助于利用利益相关者分析、沟通计划、冲突解决策略、促进合作、安全领导力、提供文化意识和加强决策过程来制定创新做法,以应对建筑行业的挑战。
{"title":"Project success factors for leadership practices and communication: challenges in the construction sector","authors":"Ashok Rehan, David Thorpe, Amirhossein Heravi","doi":"10.1108/ijmpb-12-2023-0279","DOIUrl":"https://doi.org/10.1108/ijmpb-12-2023-0279","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The study examines the project success factors for leadership behavioural practices and communication impacting project success, providing empirical evidence to address the challenges in the digitalized environment in the Australian construction sector.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A quantitative approach was employed to collect survey data from 109 project managers and followers (project engineers, supervisors, team members, and senior managers) with diverse project management experience in the construction sector. An exploratory factors analysis/multivariate regression/relative importance index/<em>t</em>-test was used to identify the key project success factors and validate the study's results.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Data analysis identified four key project success factors: (1) Relationship Management, (2) Leading by Example, (3) Self-Management, and (4) Effective Communication, along with seventeen “behavioural practices attributes” impacting project success positively and significantly and emphasizing inclusiveness, relationship building, self-feedback objectivity, sharing information, collaboratively resolving disputes, and controlling emotions that significantly impact project success.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The study's results will address the industry's challenges in the complex digitalized environment and specific issues experienced in the construction industry: delays and inefficiencies, supply chain management, communication barriers with multicultural workforce and safety protocols implementation, regulatory and safety compliance, infrastructure demands, skills shortages, sustainability, and new technology adoption to achieve project success.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The quantification of research findings, employing an innovative approach, underscores the distinctive nature of this study. The key success factors will help formulate innovative practices using stakeholder analysis, communication plans, conflict resolution strategies, promoting collaboration, safety leadership, providing cultural awareness, and enhancing the decision-making process to face challenges in the construction sector.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141740083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Navigating the future of megaprojects sustainability: a comprehensive framework and research agendas 引领超大型项目可持续性的未来:综合框架和研究议程
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-19 DOI: 10.1108/ijmpb-02-2024-0027
Yongkui Li, Mengqi Wang, Giorgio Locatelli, Yueran Zhang

Purpose

Megaprojects can play a crucial role in achieving Sustainable Development Goals (SDGs) and tackling Global Challenges. However, they are often criticized for their massive resource consumption, poor cost/time performance and significant social-environmental impacts, including irreversible environmental damage. This study aims to chart the evolution of research on megaprojects sustainability and to offer a roadmap for future developments.

Design/methodology/approach

This study adopted a systematic literature review (SLR) to identify emerging themes and gaps. This study follows a three-step process of planning, conducting and reporting, based on the Tranfield approach. The overview of megaprojects sustainability research was captured through bibliometric analysis. In addition, content analysis was carried out to reveal the development of this field and get an insight into the future directions towards sustainability transition.

Findings

This study provides a longitudinal, in-depth analysis of megaprojects sustainability studies. Drawing on sustainability science and project management theories, we introduce a three-dimensional analytical framework consisting of sustainability, scope and stakeholder. This framework explains the evolution of megaprojects sustainability research from sustainability of megaprojects, to sustainability for megaprojects and then to sustainability by megaprojects. Three future avenues are proposed: (1) SDGs orientation at multi-level; (2) scope enlargement at temporal and spatial scales and (3) inclusive development for stakeholders.

Originality/value

This research contributes to the literature by providing a comprehensive and forward-looking analysis of megaprojects sustainability research. The framework and three research agendas provide a comprehensive picture of megaproject sustainability research; the agenda for future research is intended to inspire more studies and disruptive actions towards sustainability transition.

目的 大型项目在实现可持续发展目标(SDGs)和应对全球挑战方面可以发挥至关重要的作用。然而,超大型项目往往因其大量消耗资源、成本/时间绩效低下以及对社会环境的重大影响(包括不可逆转的环境破坏)而饱受诟病。本研究旨在描绘巨型项目可持续性研究的演变过程,并为未来发展提供路线图。本研究采用了系统文献综述(SLR)的方法,以确定新出现的主题和差距。本研究采用基于 Tranfield 方法的规划、实施和报告三步流程。通过文献计量分析,了解了巨型项目可持续性研究的概况。此外,还进行了内容分析,以揭示该领域的发展情况,并深入了解可持续性转型的未来方向。借鉴可持续性科学和项目管理理论,我们引入了一个由可持续性、范围和利益相关者组成的三维分析框架。该框架解释了特大项目可持续性研究的演变过程,从特大项目的可持续性,到特大项目的可持续性,再到特大项目的可持续性。提出了三个未来发展方向:(1) 多层次的可持续发展目标导向;(2) 在时间和空间尺度上扩大范围;(3) 利益相关者的包容性发展。该框架和三个研究议程提供了巨型项目可持续发展研究的全貌;未来研究议程旨在激发更多研究和颠覆性行动,以实现可持续发展转型。
{"title":"Navigating the future of megaprojects sustainability: a comprehensive framework and research agendas","authors":"Yongkui Li, Mengqi Wang, Giorgio Locatelli, Yueran Zhang","doi":"10.1108/ijmpb-02-2024-0027","DOIUrl":"https://doi.org/10.1108/ijmpb-02-2024-0027","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Megaprojects can play a crucial role in achieving Sustainable Development Goals (SDGs) and tackling Global Challenges. However, they are often criticized for their massive resource consumption, poor cost/time performance and significant social-environmental impacts, including irreversible environmental damage. This study aims to chart the evolution of research on megaprojects sustainability and to offer a roadmap for future developments.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study adopted a systematic literature review (SLR) to identify emerging themes and gaps. This study follows a three-step process of planning, conducting and reporting, based on the Tranfield approach. The overview of megaprojects sustainability research was captured through bibliometric analysis. In addition, content analysis was carried out to reveal the development of this field and get an insight into the future directions towards sustainability transition.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>This study provides a longitudinal, in-depth analysis of megaprojects sustainability studies. Drawing on sustainability science and project management theories, we introduce a three-dimensional analytical framework consisting of sustainability, scope and stakeholder. This framework explains the evolution of megaprojects sustainability research from sustainability of megaprojects, to sustainability for megaprojects and then to sustainability by megaprojects. Three future avenues are proposed: (1) SDGs orientation at multi-level; (2) scope enlargement at temporal and spatial scales and (3) inclusive development for stakeholders.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research contributes to the literature by providing a comprehensive and forward-looking analysis of megaprojects sustainability research. The framework and three research agendas provide a comprehensive picture of megaproject sustainability research; the agenda for future research is intended to inspire more studies and disruptive actions towards sustainability transition.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141740084","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Mitigating work alienation in public sector service-delivery projects caused by perceived overqualification: the roles of empowering leadership and the psychological contracts 在公共部门的服务交付项目中,缓解因认为资格过高而造成的工作疏离感:增强领导力和心理契约的作用
IF 2.3 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-16 DOI: 10.1108/ijmpb-02-2024-0038
Tariq Hameed Alvi, H. Ilyas, Samia Tariq, Ahmad Qammar, Yonggui Wang
PurposeThe study investigates the nature of an understudied yet salient relationship between perceived overqualification (POQ) and work alienation in project management. It employs relative deprivation theory to propose two dimensions of the psychological contract, i.e. relational and transactional, as underlying mediating mechanisms and how empowering leadership mitigates the adverse effects of POQ.Design/methodology/approachTo this end, in two waves, we surveyed 232 project members of three public-sector information and communication technologies (ICT) projects in Punjab, Pakistan. The data was analyzed using Partial Least Square Structural Equation Modeling (PLS-SEM).FindingsThe key findings are: (1) POQ leads to work alienation, (2) relational and transactional contracts mediate this relationship, and (3) empowering leadership can mitigate the adverse effects of POQ in project management settings.Originality/valueThis research adds valuable insights to the scant POQ literature in public-sector project management settings. It also contributes by identifying the mediating role of relational and transactional psychological contracts and the moderating role of empowering leadership to mitigate the adverse effects of POQ in these settings.
研究目的:本研究探讨了项目管理中的感知资质过高(POQ)与工作疏离之间未被充分研究但却十分突出的关系。研究运用相对剥夺理论,提出了心理契约的两个维度,即关系型和交易型,作为潜在的中介机制,以及授权型领导如何减轻 POQ 的不利影响。我们使用偏最小平方结构方程模型(PLS-SEM)对数据进行了分析:(1) POQ 会导致工作疏离,(2) 关系型和交易型合同会调节这种关系,(3) 授权型领导可以减轻项目管理环境中 POQ 的不利影响。它还确定了关系型和交易型心理契约的中介作用以及授权型领导力的调节作用,从而减轻了项目管理环境中 POQ 的不利影响。
{"title":"Mitigating work alienation in public sector service-delivery projects caused by perceived overqualification: the roles of empowering leadership and the psychological contracts","authors":"Tariq Hameed Alvi, H. Ilyas, Samia Tariq, Ahmad Qammar, Yonggui Wang","doi":"10.1108/ijmpb-02-2024-0038","DOIUrl":"https://doi.org/10.1108/ijmpb-02-2024-0038","url":null,"abstract":"PurposeThe study investigates the nature of an understudied yet salient relationship between perceived overqualification (POQ) and work alienation in project management. It employs relative deprivation theory to propose two dimensions of the psychological contract, i.e. relational and transactional, as underlying mediating mechanisms and how empowering leadership mitigates the adverse effects of POQ.Design/methodology/approachTo this end, in two waves, we surveyed 232 project members of three public-sector information and communication technologies (ICT) projects in Punjab, Pakistan. The data was analyzed using Partial Least Square Structural Equation Modeling (PLS-SEM).FindingsThe key findings are: (1) POQ leads to work alienation, (2) relational and transactional contracts mediate this relationship, and (3) empowering leadership can mitigate the adverse effects of POQ in project management settings.Originality/valueThis research adds valuable insights to the scant POQ literature in public-sector project management settings. It also contributes by identifying the mediating role of relational and transactional psychological contracts and the moderating role of empowering leadership to mitigate the adverse effects of POQ in these settings.","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.3,"publicationDate":"2024-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141641986","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The impact of cross-organizational private relationships on cooperative behavior in construction projects: evidence from Chinese construction industry 跨组织私人关系对建筑项目合作行为的影响:来自中国建筑业的证据
IF 2.3 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-16 DOI: 10.1108/ijmpb-11-2023-0245
Xiaoyu Li, Jiaojiao Deng
PurposeAntagonistic relationship among the participants of construction projects has significantly improved, and further improving cooperation quality are committed. In this context, expanding new ways to improve cooperation quality has become a new topic in cooperation research. This study is dedicated to exploring the mechanism of cross-organizational private relationships on cooperative behaviors, which is rarely addressed in current research on construction projects, and provides reference for the rational use of cross-organizational private relationships.Design/methodology/approachBased on analysis of studies related to relational governance theory, institutional theory and project complexity, this study constructs the theoretical model. This study uses survey data from 395 construction professionals in China to test the theoretical model by using structural equation modeling (SEM) and explains the direct and indirect mechanism of cross-organizational private relationships on cooperation behavior.Findings(1) Cross-organizational private relationships have direct and indirect facilitating effect on cooperation behavior. (2) Relational norms as mediating variables contribute to the expansion of the positive effects of cross-organizational private relationships on cooperation behavior. (3) Institutional environment and project complexity have the moderating effect between cross-organizational private relationships and cooperation behavior.Originality/valueThis research investigates the impact mechanisms and boundary conditions of cross-organizational private relationships at the micro level on the cooperative behaviors in construction projects and conducts empirical research. It is a topic that has not been adequately researched in the field of project management. The research results expand the scope of research on relational governance and deepen the research on the antecedents of relational norms. It provides the base for the proposed contingency theory of relational governance.
目的建设项目各参与方之间的对立关系已明显改善,进一步提高合作质量成为各参与方的承诺。在此背景下,拓展提高合作质量的新途径成为合作研究的新课题。本研究致力于探讨跨组织私人关系对合作行为的影响机制,这在目前有关建设项目的研究中鲜有涉及,为合理利用跨组织私人关系提供参考。设计/方法/途径本研究在分析关系治理理论、制度理论和项目复杂性相关研究的基础上,构建了理论模型。本研究利用对中国 395 名建筑专业人员的调查数据,采用结构方程模型(SEM)对理论模型进行检验,并解释跨组织私人关系对合作行为的直接和间接作用机制。研究结果(1)跨组织私人关系对合作行为具有直接和间接的促进作用。(2)关系规范作为中介变量有助于扩大跨组织私人关系对合作行为的积极影响。(3) 制度环境和项目复杂性在跨组织私人关系与合作行为之间具有调节作用。这是一个在项目管理领域尚未得到充分研究的课题。研究成果拓展了关系治理的研究范围,深化了关系规范前因的研究。它为提出关系治理的权变理论提供了基础。
{"title":"The impact of cross-organizational private relationships on cooperative behavior in construction projects: evidence from Chinese construction industry","authors":"Xiaoyu Li, Jiaojiao Deng","doi":"10.1108/ijmpb-11-2023-0245","DOIUrl":"https://doi.org/10.1108/ijmpb-11-2023-0245","url":null,"abstract":"PurposeAntagonistic relationship among the participants of construction projects has significantly improved, and further improving cooperation quality are committed. In this context, expanding new ways to improve cooperation quality has become a new topic in cooperation research. This study is dedicated to exploring the mechanism of cross-organizational private relationships on cooperative behaviors, which is rarely addressed in current research on construction projects, and provides reference for the rational use of cross-organizational private relationships.Design/methodology/approachBased on analysis of studies related to relational governance theory, institutional theory and project complexity, this study constructs the theoretical model. This study uses survey data from 395 construction professionals in China to test the theoretical model by using structural equation modeling (SEM) and explains the direct and indirect mechanism of cross-organizational private relationships on cooperation behavior.Findings(1) Cross-organizational private relationships have direct and indirect facilitating effect on cooperation behavior. (2) Relational norms as mediating variables contribute to the expansion of the positive effects of cross-organizational private relationships on cooperation behavior. (3) Institutional environment and project complexity have the moderating effect between cross-organizational private relationships and cooperation behavior.Originality/valueThis research investigates the impact mechanisms and boundary conditions of cross-organizational private relationships at the micro level on the cooperative behaviors in construction projects and conducts empirical research. It is a topic that has not been adequately researched in the field of project management. The research results expand the scope of research on relational governance and deepen the research on the antecedents of relational norms. It provides the base for the proposed contingency theory of relational governance.","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.3,"publicationDate":"2024-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141641314","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A clash of clans: an empirical study of conflicting institutional logics and their impact on megaproject collaboration 宗族冲突:关于相互冲突的机构逻辑及其对巨型项目合作影响的实证研究
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-07-03 DOI: 10.1108/ijmpb-09-2023-0203
Anna af Hällström

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

目的由于超大项目本身的复杂性和不确定性,管理超大项目具有挑战性。合作项目交付模式已被引入公共基础设施巨型项目,作为传统项目管理的替代方案,通常通过合作合同来实现。这些项目组织充当了逻辑互动的机构舞台,因为具有不同机构背景的参与者会在项目中进行互动。本文旨在通过机构视角研究三个超大型项目的交付阶段,调查其中的机构互动和逻辑调整。在 3 个案例中进行了 61 次访谈,访谈对象来自项目的各个层次。受访者是通过 "滚雪球 "抽样法选出的。在两个案例中,对共享项目办公室进行了观察。数据分析建立在一阶代码和二阶主题的基础上,并将其收集到一个理论框架中。研究结果经验证据表明了形成机构逻辑的动力,并提供了在合作合同应用良好的项目中改变逻辑的证据。然而,由于制度变革缓慢,不恰当的合作合同可能导致传统工作方式的固守,因此存在着抵制和回归传统逻辑的风险。原创性/价值目前的研究主要集中在此类模式的监管框架和采购阶段,但很少关注交付阶段和相互冲突的逻辑之间的相互作用。本文可作为公共基础设施项目中不同逻辑及其互动和协调的范例。本文的贡献包括进一步强调项目开始阶段是不同机构逻辑的交汇点,以及在使用合作合同时必须进行的角色转变。
{"title":"A clash of clans: an empirical study of conflicting institutional logics and their impact on megaproject collaboration","authors":"Anna af Hällström","doi":"10.1108/ijmpb-09-2023-0203","DOIUrl":"https://doi.org/10.1108/ijmpb-09-2023-0203","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141575047","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The interplay of team-level leader-member exchange and artificial intelligence on information systems development team performance: a mediated moderation perspective 团队层面的领导-成员交流和人工智能对信息系统开发团队绩效的相互作用:中介调节视角
IF 2.7 4区 管理学 Q3 BUSINESS Pub Date : 2024-06-28 DOI: 10.1108/ijmpb-11-2023-0253
Ahsan Ali, Xianfang Xue, Nan Wang, Xicheng Yin, Hussain Tariq

Purpose

The aim of this study is to investigate how team-level leader-member exchange (LMX) and the instrumental use of artificial intelligence (AI) by team members influence team psychological empowerment and information systems development (ISD) team performance.

Design/methodology/approach

A survey approach was employed to collect time-lagged, multi-source data for testing the proposed model of this study (N = 514 responses from 88 teams). PROCESS macro was used to analyze the data to generate empirical results.

Findings

The results suggest that instrumental AI use indirectly influences ISD team performance by enhancing team psychological empowerment. Additionally, it moderates the effects of team-level LMX on team psychological empowerment and ISD team performance. Furthermore, the results demonstrate that the interaction effect of LMX and instrumental AI use on ISD team performance is mediated by team psychological empowerment.

Originality/value

While research on ISD consistently demonstrates that teams, data, and technology collectively contribute to the success of these projects. What is less known, however, is how the exchange relationship between ISD teams and their leader, as well as technological factors, contribute to ISD projects. This study draws on LMX theory to propose how team-level LMX and the instrumental use of AI by team members influence team psychological empowerment and ISD team performance. The study puts forth a mediated moderation model to develop a set of hypotheses. It offers valuable contributions to AI and LMX, along with implications for ISD team management.

目的本研究旨在探讨团队层面的领导-成员交流(LMX)以及团队成员对人工智能(AI)的工具性使用如何影响团队心理授权和信息系统开发(ISD)团队绩效。研究结果表明,工具性人工智能的使用通过增强团队心理授权间接影响了 ISD 团队的绩效。此外,它还调节了团队层面的 LMX 对团队心理授权和 ISD 团队绩效的影响。此外,研究结果表明,LMX 和工具性人工智能的使用对 ISD 团队绩效的交互效应是由团队心理授权中介的。 原创性/价值虽然有关 ISD 的研究一直表明,团队、数据和技术共同促成了这些项目的成功。然而,人们对 ISD 团队与其领导者之间的交流关系以及技术因素如何促进 ISD 项目却知之甚少。本研究借鉴 LMX 理论,提出团队层面的 LMX 和团队成员对人工智能的工具性使用如何影响团队心理授权和 ISD 团队绩效。本研究提出了一个中介调节模型,从而提出了一系列假设。它为人工智能和 LMX 做出了宝贵贡献,并对综合服务部团队管理产生了影响。
{"title":"The interplay of team-level leader-member exchange and artificial intelligence on information systems development team performance: a mediated moderation perspective","authors":"Ahsan Ali, Xianfang Xue, Nan Wang, Xicheng Yin, Hussain Tariq","doi":"10.1108/ijmpb-11-2023-0253","DOIUrl":"https://doi.org/10.1108/ijmpb-11-2023-0253","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The aim of this study is to investigate how team-level leader-member exchange (LMX) and the instrumental use of artificial intelligence (AI) by team members influence team psychological empowerment and information systems development (ISD) team performance.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A survey approach was employed to collect time-lagged, multi-source data for testing the proposed model of this study (<em>N</em> = 514 responses from 88 teams). PROCESS macro was used to analyze the data to generate empirical results.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results suggest that instrumental AI use indirectly influences ISD team performance by enhancing team psychological empowerment. Additionally, it moderates the effects of team-level LMX on team psychological empowerment and ISD team performance. Furthermore, the results demonstrate that the interaction effect of LMX and instrumental AI use on ISD team performance is mediated by team psychological empowerment.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>While research on ISD consistently demonstrates that teams, data, and technology collectively contribute to the success of these projects. What is less known, however, is how the exchange relationship between ISD teams and their leader, as well as technological factors, contribute to ISD projects. This study draws on LMX theory to propose how team-level LMX and the instrumental use of AI by team members influence team psychological empowerment and ISD team performance. The study puts forth a mediated moderation model to develop a set of hypotheses. It offers valuable contributions to AI and LMX, along with implications for ISD team management.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141511353","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Do nothing, do minimum or do something? Why public project appraisals “always” recommend large projects 什么都不做、做最少的事还是做一些事?为什么公共项目评估 "总是 "推荐大型项目?
IF 2.7 4区 管理学 Q1 Business, Management and Accounting Pub Date : 2024-05-29 DOI: 10.1108/ijmpb-11-2023-0251
Gro Holst Volden, Morten Welde, Atle Engebø, Bjørn Sørskot Andersen

Purpose

In the project initiation phase, an appraisal is needed to clarify the strategic problem and alternative solutions. Full-scale construction projects and simple solutions (do-minimum alternatives) should be assessed. The do-nothing alternative is the baseline for the appraisal and an option in itself. The paper explores the role of do-nothing and do-minimum alternatives in public project appraisal, which may significantly impact the attractiveness of a construction project.

Design/methodology/approach

The paper presents an empirical study from Norway, which requires external quality assurance (QA) of early project appraisals. The data include an extensive document review of 112 projects and interviews with 41 experts involved in the appraisal processes.

Findings

Of 112 appraisals, 110 recommended a major construction project, including cases where the benefits and value were low or uncertain. The do-nothing alternative was generally included as a reference but not treated as a viable option. Do-minimum alternatives were often not explored. By contrast, the external QA reports recommended do-nothing or do-minimum in 28 cases. Interestingly, although political decision-makers rarely reject projects, they may put them on hold indefinitely, implying that the actual outcome in many cases is still do-nothing.

Originality/value

The paper addresses a topic that has been understudied in the literature. The findings contribute to the broader literature on project initiation processes, project appraisal and how to reduce the risk of bias and manipulation in appraisals.

目的 在项目启动阶段,需要进行评估,以明确战略问题和替代解决方案。应评估全面建设项目和简单解决方案(最小化替代方案)。什么都不做的替代方案是评估的基准,其本身也是一种选择。本文探讨了 "什么都不做 "和 "最少做 "备选方案在公共项目评估中的作用,这可能会对建设项目的吸引力产生重大影响。本文介绍了挪威的一项实证研究,该研究要求对早期项目评估进行外部质量保证(QA)。研究数据包括对 112 个项目进行的广泛文件审查,以及对参与评估过程的 41 位专家进行的访谈。在 112 项评估中,110 项建议实施大型建设项目,包括效益和价值较低或不确定的情况。无所作为的替代方案通常被作为参考,但不被视为可行的方案。最低限度的替代方案往往没有得到探讨。相比之下,外部质量保证报告在 28 个案例中建议什么也不做或做最少。有趣的是,尽管政治决策者很少拒绝项目,但他们可能会无限期地搁置项目,这意味着在许多情况下,实际结果仍然是什么都不做。研究结果对有关项目启动过程、项目评估以及如何降低评估中的偏差和操纵风险的更广泛的文献有所贡献。
{"title":"Do nothing, do minimum or do something? Why public project appraisals “always” recommend large projects","authors":"Gro Holst Volden, Morten Welde, Atle Engebø, Bjørn Sørskot Andersen","doi":"10.1108/ijmpb-11-2023-0251","DOIUrl":"https://doi.org/10.1108/ijmpb-11-2023-0251","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>In the project initiation phase, an appraisal is needed to clarify the strategic problem and alternative solutions. Full-scale construction projects and simple solutions (<em>do-minimum</em> alternatives) should be assessed. The <em>do-nothing</em> alternative is the baseline for the appraisal and an option in itself. The paper explores the role of <em>do-nothing</em> and <em>do-minimum</em> alternatives in public project appraisal, which may significantly impact the attractiveness of a construction project.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The paper presents an empirical study from Norway, which requires external quality assurance (QA) of early project appraisals. The data include an extensive document review of 112 projects and interviews with 41 experts involved in the appraisal processes.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Of 112 appraisals, 110 recommended a major construction project, including cases where the benefits and value were low or uncertain. The <em>do-nothing</em> alternative was generally included as a reference but not treated as a viable option. <em>Do-minimum</em> alternatives were often not explored. By contrast, the external QA reports recommended <em>do-nothing</em> or <em>do-minimum</em> in 28 cases. Interestingly, although political decision-makers rarely reject projects, they may put them on hold indefinitely, implying that the actual outcome in many cases is still <em>do-nothing</em>.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The paper addresses a topic that has been understudied in the literature. The findings contribute to the broader literature on project initiation processes, project appraisal and how to reduce the risk of bias and manipulation in appraisals.</p><!--/ Abstract__block -->","PeriodicalId":47374,"journal":{"name":"International Journal of Managing Projects in Business","volume":null,"pages":null},"PeriodicalIF":2.7,"publicationDate":"2024-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141171912","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
International Journal of Managing Projects in Business
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1