Design Delays in Building Projects in India: Effects and Remedies 印度建筑工程设计延误的影响及补救措施
IF 1.6 Q3 MANAGEMENT Pub Date : 2021-02-24 DOI: 10.5130/AJCEB.V21I1.7453
D. Das, F. Emuze
Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.
经验证据表明,与设计相关的挑战会影响印度建筑项目的延迟。根据对印度奥里萨邦首府地区建筑项目的案例研究,已经确定了与顾问和设计相关的因素,并编制了政策干预措施,以减少与设计相关的延误。根据不同的情景,采用了收集数据的调查方法、统计分析和系统动力学建模方法来提出战略干预措施。研究结果表明,文件设计和编制的复杂性,以及两者的综合复杂性,可能会造成重大延误。模型结果表明,任命有能力的顾问和有效沟通的综合效果可以显著减少延误。这项研究的新颖之处在于使用系统方法来发展变量之间的因果反馈关系,而不是一次考虑问题的一个根源。该研究有三个贡献:(1)基于建筑施工中的因果反馈关系,可以诊断出与设计相关的挑战和延误机制,从而制定适当的补救措施;(2) 不同干预措施的影响可以在不同情景下定量可视化;以及(3)提供了一种检查项目周期趋势的替代方法。
{"title":"Design Delays in Building Projects in India: Effects and Remedies","authors":"D. Das, F. Emuze","doi":"10.5130/AJCEB.V21I1.7453","DOIUrl":"https://doi.org/10.5130/AJCEB.V21I1.7453","url":null,"abstract":"Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2021-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48389490","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Achieving Sustainable Procurement in Construction Projects: The Pivotal Role of a Project Management Office 在建筑项目中实现可持续采购:项目管理办公室的关键作用
IF 1.6 Q3 MANAGEMENT Pub Date : 2021-02-24 DOI: 10.5130/AJCEB.V21I1.7170
Mahmoud Ershadi, Marcus Jefferies, P. Davis, M. Mojtahedi
Environmental and ecological impacts associated with construction activities have become an ever-increasing concern, especially the considerable amount of waste generated on construction sites. Regulations and growing client pressure on meeting environmental standards have led contractors to adopt sustainable practices and try to embed this concept in their processes. Sustainable procurement management (SPM) as a potential solution takes the environmental consequences of procurement decisions into account and integrates sustainable practices into project procurement to bring positive environmental outcomes. Previous research has mainly focused on the public sector in achieving green procurement, yet this study attempts to highlight internal capacities that help private organisations manage the requirements associated with practicing sustainability. It is theorised that robust management structures, specifically project management offices (PMOs), would enhance the oversight capabilities of contractors in implementing the SPM process. The objectives of the current study are to (1) identify the requirements of a sustainable project procurement process in construction sites based on a literature review, and (2) explore the facilitative role of PMO units in achieving these requirements in the private sector. A literature review was conducted followed by a qualitative survey to solicit the viewpoints of construction professionals in principle contracting firms. As a result of the study, we identified 17 sustainability requirements and found that PMOs boost collaboration and improve the quality of decision making towards sustainable procurement. The findings (1) explain how PMOs support sustainability, (2) provide insights on implementing sustainable practices in project purchases, and (3) improve theoretical understanding of the SPM principles.
与建筑活动有关的环境和生态影响日益受到关注,特别是在建筑工地产生的大量废物。法规和日益增长的客户对满足环境标准的压力促使承包商采用可持续发展的做法,并试图将这一概念融入他们的流程中。可持续采购管理(SPM)作为一种潜在的解决方案,考虑到采购决策的环境后果,并将可持续做法纳入项目采购,以带来积极的环境成果。以前的研究主要集中在实现绿色采购的公共部门,然而本研究试图强调帮助私营组织管理与实践可持续性相关的要求的内部能力。从理论上讲,强有力的管理结构,特别是项目管理处,将加强承包商在执行项目管理过程中的监督能力。本研究的目的是:(1)在文献综述的基础上确定建筑工地可持续项目采购过程的要求,以及(2)探索项目管理办公室单位在私营部门实现这些要求方面的促进作用。本研究首先进行文献回顾,然后进行质性调查,以征求主要承包公司建筑专业人员的观点。通过研究,我们确定了17项可持续性要求,并发现项目管理办公室促进了协作,提高了可持续采购决策的质量。研究结果(1)解释了项目管理组织如何支持可持续发展;(2)为在项目采购中实施可持续实践提供了见解;(3)提高了对项目管理组织原则的理论理解。
{"title":"Achieving Sustainable Procurement in Construction Projects: The Pivotal Role of a Project Management Office","authors":"Mahmoud Ershadi, Marcus Jefferies, P. Davis, M. Mojtahedi","doi":"10.5130/AJCEB.V21I1.7170","DOIUrl":"https://doi.org/10.5130/AJCEB.V21I1.7170","url":null,"abstract":"Environmental and ecological impacts associated with construction activities have become an ever-increasing concern, especially the considerable amount of waste generated on construction sites. Regulations and growing client pressure on meeting environmental standards have led contractors to adopt sustainable practices and try to embed this concept in their processes. Sustainable procurement management (SPM) as a potential solution takes the environmental consequences of procurement decisions into account and integrates sustainable practices into project procurement to bring positive environmental outcomes. Previous research has mainly focused on the public sector in achieving green procurement, yet this study attempts to highlight internal capacities that help private organisations manage the requirements associated with practicing sustainability. It is theorised that robust management structures, specifically project management offices (PMOs), would enhance the oversight capabilities of contractors in implementing the SPM process. The objectives of the current study are to (1) identify the requirements of a sustainable project procurement process in construction sites based on a literature review, and (2) explore the facilitative role of PMO units in achieving these requirements in the private sector. A literature review was conducted followed by a qualitative survey to solicit the viewpoints of construction professionals in principle contracting firms. As a result of the study, we identified 17 sustainability requirements and found that PMOs boost collaboration and improve the quality of decision making towards sustainable procurement. The findings (1) explain how PMOs support sustainability, (2) provide insights on implementing sustainable practices in project purchases, and (3) improve theoretical understanding of the SPM principles.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2021-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48081625","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Challenges for Occupational Health and Safety Enforcement in the Construction Industry in Ghana 加纳建筑业职业健康和安全执法面临的挑战
IF 1.6 Q3 MANAGEMENT Pub Date : 2021-02-24 DOI: 10.5130/AJCEB.V21I1.7482
Elijah Frimpong Boadu, C. Wang, R. Sunindijo
Many previous studies have reported that the occupational health and safety (OHS) enforcement is poor in developing countries, however these studies have mainly focused on the broader enforcement problems and not fully considered the challenges confronting the institutions responsible for enforcing OHS standards at workplaces.  In this study, twelve potential challenges were identified from an extensive literature review, then an empirical investigation was carried out via a questionnaire survey from OHS inspectors and professionals in the Ghanaian construction industry. The twelve challenges were confirmed and ranked. Also, analysis of variance (ANOVA) and correlation were used to determine the statistical significance of the responses and the relationships between the challenges. Based on these findings, this study provides practical strategies for government, OHS inspectors and other professionals within the construction industry to improve the OHS enforcement. The research findings can also be adopted as a basis to assess challenges confronting OHS institutions in other developing countries.
以前的许多研究报告说,发展中国家的职业健康与安全执法很差,但是这些研究主要集中在更广泛的执法问题上,而没有充分考虑负责在工作场所执行职业健康与安全标准的机构所面临的挑战。在本研究中,从广泛的文献综述中确定了12个潜在的挑战,然后通过对加纳建筑行业的OHS检查员和专业人员进行问卷调查进行了实证调查。十二项挑战被确认并排名。此外,方差分析(ANOVA)和相关分析用于确定响应的统计显著性和挑战之间的关系。基于这些发现,本研究为政府、职业健康安全检查员和建筑行业的其他专业人员提供了切实可行的策略,以改善职业健康安全执法。研究结果也可作为评估其他发展中国家职业卫生和保健机构面临的挑战的基础。
{"title":"Challenges for Occupational Health and Safety Enforcement in the Construction Industry in Ghana","authors":"Elijah Frimpong Boadu, C. Wang, R. Sunindijo","doi":"10.5130/AJCEB.V21I1.7482","DOIUrl":"https://doi.org/10.5130/AJCEB.V21I1.7482","url":null,"abstract":"Many previous studies have reported that the occupational health and safety (OHS) enforcement is poor in developing countries, however these studies have mainly focused on the broader enforcement problems and not fully considered the challenges confronting the institutions responsible for enforcing OHS standards at workplaces.  In this study, twelve potential challenges were identified from an extensive literature review, then an empirical investigation was carried out via a questionnaire survey from OHS inspectors and professionals in the Ghanaian construction industry. The twelve challenges were confirmed and ranked. Also, analysis of variance (ANOVA) and correlation were used to determine the statistical significance of the responses and the relationships between the challenges. Based on these findings, this study provides practical strategies for government, OHS inspectors and other professionals within the construction industry to improve the OHS enforcement. The research findings can also be adopted as a basis to assess challenges confronting OHS institutions in other developing countries.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":"16 1","pages":""},"PeriodicalIF":1.6,"publicationDate":"2021-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85029472","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Further insights by project managers into the problems in project management 项目经理对项目管理问题的进一步见解
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-19 DOI: 10.5130/ajceb.v20i4.7121
P. Livesey
A Delphi study using twenty-three project practitioners over six rounds is aimed to identify significant problems in project management, arising from the nature of projects other than those readily identifiable in a literature review. The study goes on to identify project managers’ behaviours which are recognised as having successful impacts on the delivery of projects. A Relative Importance Index for the problems and behaviours resulting from the issues identified in the study is calculated. This study continues by reporting the views of practitioners involved in the management of large projects on the everyday problems they experience in managing projects, problems that are not adequately addressed in current project management texts concerning the nature of projects. Five additional problems, not generally discussed in the literature, were identified together with seven interpersonal skills and behaviours that are major contributors to increasing the likelihood of a successful project delivery.
一项德尔福研究使用了23个项目实践者进行了6轮,旨在确定项目管理中的重大问题,这些问题是由项目的性质引起的,而不是在文献综述中容易识别的问题。该研究继续确定项目经理的行为,这些行为被认为对项目的交付有成功的影响。计算由研究中确定的问题引起的问题和行为的相对重要性指数。本研究通过报告参与大型项目管理的从业人员对他们在管理项目中遇到的日常问题的看法继续进行,这些问题在当前有关项目性质的项目管理文本中没有得到充分解决。另外五个在文献中没有被广泛讨论的问题,与七个人际交往技巧和行为一起被确定为增加项目成功交付可能性的主要贡献者。
{"title":"Further insights by project managers into the problems in project management","authors":"P. Livesey","doi":"10.5130/ajceb.v20i4.7121","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7121","url":null,"abstract":"A Delphi study using twenty-three project practitioners over six rounds is aimed to identify significant problems in project management, arising from the nature of projects other than those readily identifiable in a literature review. The study goes on to identify project managers’ behaviours which are recognised as having successful impacts on the delivery of projects. A Relative Importance Index for the problems and behaviours resulting from the issues identified in the study is calculated. This study continues by reporting the views of practitioners involved in the management of large projects on the everyday problems they experience in managing projects, problems that are not adequately addressed in current project management texts concerning the nature of projects. Five additional problems, not generally discussed in the literature, were identified together with seven interpersonal skills and behaviours that are major contributors to increasing the likelihood of a successful project delivery.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49024061","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Project governance practices in urban public housing projects: a case study of public housing in Malaysia 城市公共住房项目治理实践——以马来西亚公共住房为例
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-19 DOI: 10.5130/ajceb.v20i4.7166
A. Latiff, A. Jaapar, C. M. M. Isa
The urban public housing project, especially for low-income people, is essential to cater to the increasing urbanisation rate in Malaysia. This study aimed to gain an understanding of the project governance practices in urban public housing projects in Malaysia, which will lead to better project delivery and the successful outcome of the projects. A single case study was conducted on a public housing project or known as Projek Perumahan Rakyat (PPR) in Kuala Lumpur, and data for this study was gathered using semi-structured interviews with six (6) public officials, document analysis, and observation. The findings of this study indicate the positive interplay between project actors guided by the elements of trust, stakeholder management, empowerment, and collective decision making, which create value for the project. Hence, this article contributes to the dynamic understanding of how public officials practice project governance in conducting their works related to urban public housing projects. The findings of the study will enable related public organisations to reinforce the underlying project governance elements towards the strengthening of urban public housing delivery DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING The author(s) received no financial support for the research, authorship, and/or publication of this article. 120 system. Case study research in different models of urban public housing could extend the discovery of other project governance elements while validating the findings of this study from different perspectives. The findings of the study are limited due to the use of a single case study related to the urban public housing project and its contexts.
城市公共住房项目,尤其是低收入人群的公共住房项目对于满足马来西亚日益增长的城市化率至关重要。本研究旨在了解马来西亚城市公共住房项目的项目治理实践,从而更好地交付项目并取得成功。对吉隆坡一个名为Projek Perumahan Rakyat(PPR)的公共住房项目进行了单一案例研究,并通过对六(6)名公职人员的半结构化访谈、文件分析和观察收集了该研究的数据。这项研究的结果表明,在信任、利益相关者管理、赋权和集体决策等要素的指导下,项目参与者之间存在积极的相互作用,这些要素为项目创造了价值。因此,本文有助于动态理解公职人员在开展城市公共住房项目相关工作时如何实施项目治理。该研究的结果将使相关公共组织能够加强基本的项目治理要素,以加强城市公共住房交付利益冲突声明作者声明,在本文的研究、作者和/或发表方面没有潜在的利益冲突。资助作者在研究、撰写和/或发表本文方面没有获得任何资助。120系统。对不同城市公共住房模式的案例研究可以扩展对其他项目治理要素的发现,同时从不同角度验证本研究的发现。由于使用了与城市公共住房项目及其背景相关的单一案例研究,因此研究结果有限。
{"title":"Project governance practices in urban public housing projects: a case study of public housing in Malaysia","authors":"A. Latiff, A. Jaapar, C. M. M. Isa","doi":"10.5130/ajceb.v20i4.7166","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7166","url":null,"abstract":"The urban public housing project, especially for low-income people, is essential to cater to the increasing urbanisation rate in Malaysia. This study aimed to gain an understanding of the project governance practices in urban public housing projects in Malaysia, which will lead to better project delivery and the successful outcome of the projects. A single case study was conducted on a public housing project or known as Projek Perumahan Rakyat (PPR) in Kuala Lumpur, and data for this study was gathered using semi-structured interviews with six (6) public officials, document analysis, and observation. The findings of this study indicate the positive interplay between project actors guided by the elements of trust, stakeholder management, empowerment, and collective decision making, which create value for the project. Hence, this article contributes to the dynamic understanding of how public officials practice project governance in conducting their works related to urban public housing projects. The findings of the study will enable related public organisations to reinforce the underlying project governance elements towards the strengthening of urban public housing delivery DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING The author(s) received no financial support for the research, authorship, and/or publication of this article. 120 system. Case study research in different models of urban public housing could extend the discovery of other project governance elements while validating the findings of this study from different perspectives. The findings of the study are limited due to the use of a single case study related to the urban public housing project and its contexts.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5130/ajceb.v20i4.7166","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47480335","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Strategic determinants of big data analytics in the AEC sector: a multi-perspective framework AEC领域大数据分析的战略决定因素:多视角框架
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-18 DOI: 10.5130/ajceb.v20i4.6649
Sushil S. Chaurasia, Surabhi Verma
With constant flow of large data sets generated by different organisations, big data analytics promises to be a revolutionary game changer for Architecture, Engineering and Construction (AEC) industry. Despite the potential of Big Data, there has been little research conducted thus far to understand the Big Data phenomenon, specifically in the AEC industry. The objective of this research therefore is to understand the contributing factors for adopting big data in AEC firms. The investigation combined the perceived strategic value of BDA with the TOE framework (technology, organization, and environment), to develop and test a holistic model on big data adoption. A set of hypotheses derived from the extant literature was tested on data from structured surveys of about 365 firms, categorised as construction service firms (engineering and architecture) and construction firms (firms engaged in managing construction projects). The results indicated that the inhibitors and facilitators of BDA adoption are different in the construction services (architecture and engineering) and construction firms. For effective adoption of BDA solutions, the findings will guide the business managers to have realistic expectations of BDA integration challenges in AEC sector.
随着不同组织产生的大数据集的不断流动,大数据分析有望成为建筑、工程和建筑(AEC)行业的革命性游戏规则改变者。尽管大数据具有潜力,但迄今为止,很少有研究对大数据现象进行了解,特别是在AEC行业。因此,本研究的目的是了解AEC公司采用大数据的影响因素。该调查将BDA的战略价值与TOE框架(技术、组织和环境)结合起来,开发并测试了大数据采用的整体模型。从现有文献中得出的一组假设是通过对大约365家公司的结构化调查数据进行测试的,这些公司被分类为建筑服务公司(工程和建筑)和建筑公司(从事建筑项目管理的公司)。结果表明,建筑服务业(建筑工程)和建筑企业采用BDA的阻碍因素和促进因素有所不同。为了有效地采用BDA解决方案,研究结果将指导业务经理对AEC部门的BDA集成挑战有现实的期望。
{"title":"Strategic determinants of big data analytics in the AEC sector: a multi-perspective framework","authors":"Sushil S. Chaurasia, Surabhi Verma","doi":"10.5130/ajceb.v20i4.6649","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.6649","url":null,"abstract":"With constant flow of large data sets generated by different organisations, big data analytics promises to be a revolutionary game changer for Architecture, Engineering and Construction (AEC) industry. Despite the potential of Big Data, there has been little research conducted thus far to understand the Big Data phenomenon, specifically in the AEC industry. The objective of this research therefore is to understand the contributing factors for adopting big data in AEC firms. The investigation combined the perceived strategic value of BDA with the TOE framework (technology, organization, and environment), to develop and test a holistic model on big data adoption. A set of hypotheses derived from the extant literature was tested on data from structured surveys of about 365 firms, categorised as construction service firms (engineering and architecture) and construction firms (firms engaged in managing construction projects). The results indicated that the inhibitors and facilitators of BDA adoption are different in the construction services (architecture and engineering) and construction firms. For effective adoption of BDA solutions, the findings will guide the business managers to have realistic expectations of BDA integration challenges in AEC sector.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":"49 1","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89653373","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Energy and economic analysis of environmental upgrading of existing office buildings 既有办公楼环境改造的能源与经济分析
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-18 DOI: 10.5130/ajceb.v20i4.7239
D. M. Nguyen, G. Ding, G. Runeson
Over many decades, buildings have been recognised as a significant area contributing to the negative impacts on the environment over their lifecycle, accelerating climate change. In return, climate change also impacts on buildings with extreme heatwaves occurring more frequently and raising the earth’s temperature. The operation phase is the most extended period over a building’s lifespan. In this period, office buildings consume most energy and emit the highest amount of greenhouse gas pollution into the environment. Building upgrading to improve energy efficiency seems to be the best way to cut pollution as the existing building stock is massive. The paper presents an economic analysis of energy efficiency upgrade of buildings with a focus of office buildings. The paper identifies upgrading activities that are commonly undertaken to upgrade energy efficiency of office buildings and a case study of three office buildings in Sydney, Australia has been used to analyse the results. The upgrading activities can improve the energy performance of the case study buildings from 3 stars to 5 stars NABERS energy rating in compliance with the mandatory requirement in the Australian government’s energy policy. With the potential increase in energy price, energy efficiency upgrading will become more affordable, but currently, most of them, except solar panels and motion sensors show a negative return and would not be undertaken if they did not also contribute to higher rental income and an increased life span of the building. The upgrading DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING The author(s) received no financial support for the research, authorship, and/or publication of this article. 82 discussed in the paper represent a potentially attractive alternative to demolition and building anew.
几十年来,建筑一直被认为是一个重要的领域,在其生命周期中对环境产生负面影响,加速气候变化。反过来,气候变化也会对建筑物产生影响,极端热浪更频繁地发生,导致地球温度升高。运行阶段是建筑物生命周期中最长的阶段。在这一时期,办公楼消耗的能源最多,向环境排放的温室气体污染最多。由于现有建筑存量庞大,为提高能源效率而进行的建筑升级似乎是减少污染的最佳途径。本文以办公建筑为研究对象,对建筑节能升级进行了经济分析。本文确定了通常进行的升级活动,以提高办公大楼的能源效率,并对澳大利亚悉尼的三座办公大楼进行了案例研究,以分析结果。通过升级改造,案例建筑的能源性能从3星提升至5星NABERS能源等级,符合澳大利亚政府能源政策的强制性要求。随着能源价格的潜在上涨,能源效率升级将变得更加负担得起,但目前,除了太阳能电池板和运动传感器外,大多数升级都显示出负回报,如果它们不能提高租金收入和延长建筑物的使用寿命,就不会进行。利益冲突升级声明作者声明在本文的研究、作者身份和/或发表方面不存在潜在的利益冲突。作者在研究、撰写和/或发表本文时未获得任何经济支持。文中所讨论的代表了一个潜在的有吸引力的替代拆除和重建。
{"title":"Energy and economic analysis of environmental upgrading of existing office buildings","authors":"D. M. Nguyen, G. Ding, G. Runeson","doi":"10.5130/ajceb.v20i4.7239","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7239","url":null,"abstract":"Over many decades, buildings have been recognised as a significant area contributing to the negative impacts on the environment over their lifecycle, accelerating climate change. In return, climate change also impacts on buildings with extreme heatwaves occurring more frequently and raising the earth’s temperature. The operation phase is the most extended period over a building’s lifespan. In this period, office buildings consume most energy and emit the highest amount of greenhouse gas pollution into the environment. Building upgrading to improve energy efficiency seems to be the best way to cut pollution as the existing building stock is massive. The paper presents an economic analysis of energy efficiency upgrade of buildings with a focus of office buildings. The paper identifies upgrading activities that are commonly undertaken to upgrade energy efficiency of office buildings and a case study of three office buildings in Sydney, Australia has been used to analyse the results. The upgrading activities can improve the energy performance of the case study buildings from 3 stars to 5 stars NABERS energy rating in compliance with the mandatory requirement in the Australian government’s energy policy. With the potential increase in energy price, energy efficiency upgrading will become more affordable, but currently, most of them, except solar panels and motion sensors show a negative return and would not be undertaken if they did not also contribute to higher rental income and an increased life span of the building. The upgrading DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING The author(s) received no financial support for the research, authorship, and/or publication of this article. 82 discussed in the paper represent a potentially attractive alternative to demolition and building anew.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45901012","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Identifying success criteria at the post-handover stage for international development projects 确定国际发展项目移交后的成功准则
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-18 DOI: 10.5130/ajceb.v20i4.7289
Johan Fahri, Julien Pollack, D. Kolar
The question of how successful a project is beyond the handover stage is still echoing in the literature on project management and more magnified in international development (ID) projects. In addressing the question, this study aims to demonstrate the importance of time frame in assessing project success, particularly identifying the success criteria at the posthandover stages (outcome and impact stages). This study used a qualitative approach that was rooted in interpretivism, allowing the use of constructivist grounded theory method (CGTM) in an ID project as an example. The study identified eight success criteria: Convenience, Development, Documentation, Maintainability, New Capability, Price of Service or Product, Training, and Usability. The study also found that, first, each participant had different emphases on different success criteria; second, most of the identified success criteria were still under the outcome stage; and lastly, usability received the highest responses from the participants as the most concerned criterion at the post-handover stages. This last finding verified the importance of time frame where the other criteria became less important if the outputs were useful to deliver the institutions’ strategic objectives. Future studies that use more sampled participants and different types of institutions are also encouraged. DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING This study was funded by Australian Awards Scholarships from Department of Foreign Affairs and Trade, the Government of Australia and the Provincial Government of North Maluku, Indonesia, through Kieraha Scholarship. 103
在项目管理的文献中,一个项目在移交阶段之后如何成功的问题仍然存在,并且在国际开发(ID)项目中被放大。为了解决这个问题,本研究旨在证明时间框架在评估项目成功方面的重要性,特别是确定移交后阶段(结果和影响阶段)的成功标准。本研究采用了一种基于解释主义的定性方法,允许在一个ID项目中使用建构主义扎根理论方法(CGTM)作为例子。该研究确定了八个成功标准:便利、开发、文档、可维护性、新功能、服务或产品价格、培训和可用性。研究还发现,首先,每个参与者对不同的成功标准有不同的侧重点;第二,大多数确定的成功标准仍处于结果阶段;最后,在移交后阶段,可用性作为最关心的标准得到了参与者的最高回应。最后一项发现证实了时间框架的重要性,如果产出有助于实现机构的战略目标,其他标准就变得不那么重要了。未来的研究也鼓励使用更多的样本参与者和不同类型的机构。利益冲突声明作者声明在本文的研究、作者身份和/或发表方面没有潜在的利益冲突。本研究由澳大利亚外交和贸易部、澳大利亚政府和印度尼西亚北马鲁古省政府通过Kieraha奖学金提供的澳大利亚奖学金资助
{"title":"Identifying success criteria at the post-handover stage for international development projects","authors":"Johan Fahri, Julien Pollack, D. Kolar","doi":"10.5130/ajceb.v20i4.7289","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7289","url":null,"abstract":"The question of how successful a project is beyond the handover stage is still echoing in the literature on project management and more magnified in international development (ID) projects. In addressing the question, this study aims to demonstrate the importance of time frame in assessing project success, particularly identifying the success criteria at the posthandover stages (outcome and impact stages). This study used a qualitative approach that was rooted in interpretivism, allowing the use of constructivist grounded theory method (CGTM) in an ID project as an example. The study identified eight success criteria: Convenience, Development, Documentation, Maintainability, New Capability, Price of Service or Product, Training, and Usability. The study also found that, first, each participant had different emphases on different success criteria; second, most of the identified success criteria were still under the outcome stage; and lastly, usability received the highest responses from the participants as the most concerned criterion at the post-handover stages. This last finding verified the importance of time frame where the other criteria became less important if the outputs were useful to deliver the institutions’ strategic objectives. Future studies that use more sampled participants and different types of institutions are also encouraged. DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. FUNDING This study was funded by Australian Awards Scholarships from Department of Foreign Affairs and Trade, the Government of Australia and the Provincial Government of North Maluku, Indonesia, through Kieraha Scholarship. 103","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":"20 1","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41893405","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Barriers to reusing and recycling office fit-out: an exploratory analysis of demolition processes and product features 再利用和回收办公室装修的障碍:对拆除过程和产品特征的探索性分析
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-17 DOI: 10.5130/ajceb.v20i4.7061
A. A. F. Fini, P. Forsythe
Within the highly waste-generative context of Australia, waste from demolition of office fit-out significantly contributes to unsustainable landfilling. The extant literature is, however, slim on scrutiny of the situation. Therefore, this study aims to uncover office fit-out demolition processes and product features that drive high ratio of landfilling fit-out elements. The research used ten case projects and fourteen interviews to document visible and latent parameters of office fit-out waste. Waste-stream mapping and decision-tree techniques, in conjunction with basic descriptive statistics, were used to model and visualize the extent and drivers of unsustainable fit-out demolition. Further, an exemplar product features analysis was conducted to validate the identified drivers. The findings show that 78% of fit-out waste from the studied cases is landfilled. This high rate is attributed to both latent and visible factors. The main latent factor is high lease price of premium or high-quality offices which favours expeditious demolition with low consideration for reuse and recycling. Key technically visible barriers are volumetric furniture, heterogeneous fit-out assemblies, and insufficient critical mass. To move away from landfilling, production of office fit-out should be transformed for sustainable material adequacy, product re-configurability and de-constructability, and easy handling in the use phase.
在澳大利亚高度产生废物的背景下,拆除办公室装修产生的废物大大促进了不可持续的垃圾填埋。然而,现存的文献对这种情况的审视却寥寥无几。因此,本研究旨在揭示办公室装修拆除过程和产品特点,驱动高比例的垃圾填埋装修元素。该研究使用了10个案例项目和14个访谈来记录办公室装修浪费的可见和潜在参数。废物流绘图和决策树技术结合基本的描述性统计,用于模拟和可视化不可持续的装修拆除的程度和驱动因素。此外,还进行了典型产品特征分析,以验证所识别的驱动因素。调查结果显示,研究案例中78%的装修废物被填埋。这一高比率归因于潜在因素和可见因素。主要的潜在因素是溢价或高品质写字楼的高租赁价格,有利于快速拆除,而对再利用和回收的考虑较少。技术上可见的关键障碍是体积家具、异质装配和临界质量不足。为了摆脱堆填,办公室装修的生产应转变为可持续材料充足、产品可重新配置和可拆卸,以及在使用阶段易于处理。
{"title":"Barriers to reusing and recycling office fit-out: an exploratory analysis of demolition processes and product features","authors":"A. A. F. Fini, P. Forsythe","doi":"10.5130/ajceb.v20i4.7061","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7061","url":null,"abstract":"Within the highly waste-generative context of Australia, waste from demolition of office fit-out significantly contributes to unsustainable landfilling. The extant literature is, however, slim on scrutiny of the situation. Therefore, this study aims to uncover office fit-out demolition processes and product features that drive high ratio of landfilling fit-out elements. The research used ten case projects and fourteen interviews to document visible and latent parameters of office fit-out waste. Waste-stream mapping and decision-tree techniques, in conjunction with basic descriptive statistics, were used to model and visualize the extent and drivers of unsustainable fit-out demolition. Further, an exemplar product features analysis was conducted to validate the identified drivers. The findings show that 78% of fit-out waste from the studied cases is landfilled. This high rate is attributed to both latent and visible factors. The main latent factor is high lease price of premium or high-quality offices which favours expeditious demolition with low consideration for reuse and recycling. Key technically visible barriers are volumetric furniture, heterogeneous fit-out assemblies, and insufficient critical mass. To move away from landfilling, production of office fit-out should be transformed for sustainable material adequacy, product re-configurability and de-constructability, and easy handling in the use phase.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":"7 1","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86385310","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
4D visualization to bridge the knowing-doing gap in megaprojects: an Australian case study 4D可视化在大型项目中弥合知行差距:一个澳大利亚的案例研究
IF 1.6 Q3 MANAGEMENT Pub Date : 2020-11-16 DOI: 10.5130/ajceb.v20i4.7015
Abhijnan Datta, Johan Ninan, S. Sankaran
The literature on megaprojects are oriented towards ‘knowing’ the problems and ‘knowing’ the solutions, and there is a dearth in literature aimed at explaining strategies adopted in ‘doing’ or implementing that knowledge. Particularly, the literature highlights communication as important as part of the ‘knowing,’ while there is a gap in ‘doing,’ as performance improvements are still not evident. This research aims to explore how this knowing-doing gap in the communication of risk information was addressed by using 4D visualization. This article discusses the vent facility of a megaproject in Australia as a case study to illustrate the innovation. The 4D model developed for the facility helped the project team to visualize the construction of a critical part of the project, discuss the construction methodology, identify the risks in the construction process and persuade the non-technical decision-makers of the project to take appropriate action. The risks identified through the visualization covered safety, program, and interface risks. This study offers insights into the role of visualization in bridging the knowing-doing gap in the construction industry in the context of a megaproject.
关于大型项目的文献致力于“了解”问题和“了解”解决方案,而旨在解释“做”或实施这些知识所采取的策略的文献却很少。特别是,文献强调沟通是“知道”的重要组成部分,而在“做”方面存在差距,因为绩效改进仍然不明显。本研究旨在探索如何通过4D可视化来解决风险信息沟通中的知行差距。本文以澳大利亚某大型项目的放空设施为例,说明了该项目的创新之处。为该设施开发的4D模型帮助项目团队可视化项目关键部分的施工,讨论施工方法,识别施工过程中的风险,并说服项目的非技术决策者采取适当行动。通过可视化识别的风险包括安全、程序和接口风险。这项研究深入探讨了在大型项目的背景下,可视化在弥合建筑业知行差距方面的作用。
{"title":"4D visualization to bridge the knowing-doing gap in megaprojects: an Australian case study","authors":"Abhijnan Datta, Johan Ninan, S. Sankaran","doi":"10.5130/ajceb.v20i4.7015","DOIUrl":"https://doi.org/10.5130/ajceb.v20i4.7015","url":null,"abstract":"The literature on megaprojects are oriented towards ‘knowing’ the problems and ‘knowing’ the solutions, and there is a dearth in literature aimed at explaining strategies adopted in ‘doing’ or implementing that knowledge. Particularly, the literature highlights communication as important as part of the ‘knowing,’ while there is a gap in ‘doing,’ as performance improvements are still not evident. This research aims to explore how this knowing-doing gap in the communication of risk information was addressed by using 4D visualization. This article discusses the vent facility of a megaproject in Australia as a case study to illustrate the innovation. The 4D model developed for the facility helped the project team to visualize the construction of a critical part of the project, discuss the construction methodology, identify the risks in the construction process and persuade the non-technical decision-makers of the project to take appropriate action. The risks identified through the visualization covered safety, program, and interface risks. This study offers insights into the role of visualization in bridging the knowing-doing gap in the construction industry in the context of a megaproject.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":" ","pages":""},"PeriodicalIF":1.6,"publicationDate":"2020-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47971239","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
期刊
Construction Economics and Building
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1