首页 > 最新文献

Volt Jurnal Ilmiah Pendidikan Teknik Elektro最新文献

英文 中文
Kajian Deskriptif Supervisi Pendidikan Teknologi Kejuruan pada Laboratorium Dasar dan Pengukuran Jurusan Teknik Elektro 电气工程基础实验室的贸易技术培训监督研究
Pub Date : 2022-06-02 DOI: 10.24036/jpte.v3i1.165
Rima Sartika, Riki Mukhaiyar
This study aims to describe the existence of PTK supervision which makes a better management system. The informant in this study was the head of the laboratory and education laboratory institution (plp). This research is a qualitative descriptive study. The research was conducted at the basic and measurement laboratory of the electrical engineering department. The method of data collection was carried out using the observation method to determine the conditions and situations of the existing facilities and infrastructure in the laboratory, this interview method was carried out with the head of Labor and PLP related to laboratory management and documentation methods to obtain data in the form of images and supporting documents to support research. In this study, to obtain the validity of the data, triangulation was carried out to adjust the data collected according to the field, by comparing the results of interviews with documentation and documents related to basic and measurement laboratory management. So, it can be said that with PTK supervision, a better management system in the Basic and Measurement laboratory of the electrical engineering department includes planning aspects, organizing aspects, implementation aspects, and supervision aspects.
本研究旨在描述PTK监管的存在,以建立一个更好的管理制度。本研究的举报人是实验室和教育实验室机构(plp)的负责人。本研究为定性描述性研究。本研究在电气工程系基础与测量实验室进行。数据收集方法采用观察法确定实验室现有设施和基础设施的条件和情况,访谈法与Labor和PLP负责人进行相关的实验室管理和文献方法,以图像和辅助文件的形式获取数据,以支持研究。在本研究中,为了获得数据的有效性,通过将访谈结果与基础和测量实验室管理相关的文献和文件进行比较,对所收集的数据进行三角剖分,根据现场进行调整。因此,可以说,在PTK的监督下,电气工程系基础与测量实验室较好的管理体系包括规划方面、组织方面、实施方面和监督方面。
{"title":"Kajian Deskriptif Supervisi Pendidikan Teknologi Kejuruan pada Laboratorium Dasar dan Pengukuran Jurusan Teknik Elektro","authors":"Rima Sartika, Riki Mukhaiyar","doi":"10.24036/jpte.v3i1.165","DOIUrl":"https://doi.org/10.24036/jpte.v3i1.165","url":null,"abstract":"This study aims to describe the existence of PTK supervision which makes a better management system. The informant in this study was the head of the laboratory and education laboratory institution (plp). This research is a qualitative descriptive study. The research was conducted at the basic and measurement laboratory of the electrical engineering department. The method of data collection was carried out using the observation method to determine the conditions and situations of the existing facilities and infrastructure in the laboratory, this interview method was carried out with the head of Labor and PLP related to laboratory management and documentation methods to obtain data in the form of images and supporting documents to support research. In this study, to obtain the validity of the data, triangulation was carried out to adjust the data collected according to the field, by comparing the results of interviews with documentation and documents related to basic and measurement laboratory management. So, it can be said that with PTK supervision, a better management system in the Basic and Measurement laboratory of the electrical engineering department includes planning aspects, organizing aspects, implementation aspects, and supervision aspects.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"167 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84811299","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Analisis Drop Tegangan Listrik Menggunakan ETAP Pada Penyulang Utari PT. PLN (Persero) Unit Layanan Pelanggan Bandarjaya
Pub Date : 2022-05-31 DOI: 10.36269/jtr.v4i1.985
Hamimi Hamimi, Muhammad Irfan Chaniago, Hendrarto Widodo
Voltage drop is the loss of voltage caused by several factors. PLN sets the standard of voltage at +5% -10% of the line voltage. The Utari feeder experiences a voltage drop caused by the length of the network plus the amount of load that is concentrated at the end of a network. This study uses observation method or library research. The source of the data used is secondary data (which already exists) which is then simulated using the ETAP application by utilizing the Load Flow Analysis function so that the results of the power flow in the electrical system are obtained. Based on the results of the study, to increase the voltage by building an underbuild network. The construction of this underbuild network aims to cut the length of the Utari feeder which is then maneuvered into Gunung Madu Plantation feeder. The voltage which was originally 17.217kV to 18.968kV with a difference is 1.751kV, namely there is an increase in voltage of about 7.4% from before. With the breaking of the load, it can shorten length of the feeder, so that by reducing the length of the feeder, the inductive reactance of the line will decrease so that the shrinkage is smaller.
电压降是由几种因素引起的电压损失。PLN将电压标准设定为线路电压的+5% ~ 10%。乌塔里馈线的电压下降是由网络的长度加上集中在网络末端的负载量引起的。本研究采用观察法或图书馆研究法。所使用的数据来源是二次数据(已经存在),然后使用ETAP应用程序利用负载流分析功能对其进行模拟,从而获得电力系统中潮流的结果。在研究结果的基础上,通过建立欠建网络来提高电压。这个基础网络的建设旨在缩短乌塔里馈线的长度,然后将其移动到Gunung Madu种植园馈线。电压由原来的17.217kV到18.968kV相差了1.751kV,即电压比原来增加了约7.4%。随着负载的断开,它可以缩短给料机的长度,这样通过减少给料机的长度,使线路的感应抗减小,使收缩更小。
{"title":"Analisis Drop Tegangan Listrik Menggunakan ETAP Pada Penyulang Utari PT. PLN (Persero) Unit Layanan Pelanggan Bandarjaya","authors":"Hamimi Hamimi, Muhammad Irfan Chaniago, Hendrarto Widodo","doi":"10.36269/jtr.v4i1.985","DOIUrl":"https://doi.org/10.36269/jtr.v4i1.985","url":null,"abstract":"Voltage drop is the loss of voltage caused by several factors. PLN sets the standard of voltage at +5% -10% of the line voltage. The Utari feeder experiences a voltage drop caused by the length of the network plus the amount of load that is concentrated at the end of a network. This study uses observation method or library research. The source of the data used is secondary data (which already exists) which is then simulated using the ETAP application by utilizing the Load Flow Analysis function so that the results of the power flow in the electrical system are obtained. Based on the results of the study, to increase the voltage by building an underbuild network. The construction of this underbuild network aims to cut the length of the Utari feeder which is then maneuvered into Gunung Madu Plantation feeder. The voltage which was originally 17.217kV to 18.968kV with a difference is 1.751kV, namely there is an increase in voltage of about 7.4% from before. With the breaking of the load, it can shorten length of the feeder, so that by reducing the length of the feeder, the inductive reactance of the line will decrease so that the shrinkage is smaller.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"4 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72650204","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Studi Pemanfaatan Baterai Lithium 18650 Bekas Sebagai Penyimpan Energi Listrik Untuk Penerangan 使用锂电池18650作为照明能源储存的研究
Pub Date : 2022-05-31 DOI: 10.36269/jtr.v4i1.987
Fitriono Fitriono, Guntur Hadi Saputra, Ancolo Ancolo
In the modern era, electronic devices around the world have used batteries as a stored power source so that the devices are flexible and can be carried everywhere without having to be constantly connected to an electrical power source. However, the battery has a service life depending on the time and method of use of the battery, and if the battery on the device has been damaged , it must replaced with a new battery. Based on the results of field observations, the most common type of used electronic device battery found is lithium batteries in 18650 so that with the increasing use of batteries in electronic devices, many used battery e-wastes, especially 18650 lithium batteries, are found to be unused. The ability to store electrical energy used 18650 lithium battery after sorting properly and made into a 12 volt pack battery can store power of 77.83 Ah. produces excellent performance that can be used for power backup during power outages, for lighting residential houses, for lighting gardened huts, for lighting fishing boats when in the middle of the sea and other DC load uses.
在现代,世界各地的电子设备都使用电池作为存储电源,这样设备就很灵活,可以随身携带,而不必一直连接到电源上。但是,电池的使用寿命取决于电池的使用时间和方法,如果设备上的电池已经损坏,则必须更换新电池。根据实地观察的结果,发现最常见的废旧电子设备电池类型是18650锂电池,因此随着电池在电子设备中的使用越来越多,许多废旧电池电子垃圾,特别是18650锂电池,被发现是未使用的。储存电能的能力利用18650锂电池经过分拣妥善制成的12伏电池组可储存77.83 Ah的电能。产生优异的性能,可用于停电时的备用电源,用于住宅照明,用于花园小屋照明,用于海上渔船照明和其他直流负载用途。
{"title":"Studi Pemanfaatan Baterai Lithium 18650 Bekas Sebagai Penyimpan Energi Listrik Untuk Penerangan","authors":"Fitriono Fitriono, Guntur Hadi Saputra, Ancolo Ancolo","doi":"10.36269/jtr.v4i1.987","DOIUrl":"https://doi.org/10.36269/jtr.v4i1.987","url":null,"abstract":"In the modern era, electronic devices around the world have used batteries as a stored power source so that the devices are flexible and can be carried everywhere without having to be constantly connected to an electrical power source. However, the battery has a service life depending on the time and method of use of the battery, and if the battery on the device has been damaged , it must replaced with a new battery. Based on the results of field observations, the most common type of used electronic device battery found is lithium batteries in 18650 so that with the increasing use of batteries in electronic devices, many used battery e-wastes, especially 18650 lithium batteries, are found to be unused. The ability to store electrical energy used 18650 lithium battery after sorting properly and made into a 12 volt pack battery can store power of 77.83 Ah. produces excellent performance that can be used for power backup during power outages, for lighting residential houses, for lighting gardened huts, for lighting fishing boats when in the middle of the sea and other DC load uses.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"36 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81409236","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analisa Performan Motor Bucket Wheel Stacker Reclaimer PT. Bukit Asam Tbk 阿纳利萨高性能电动斗轮堆取料机PT. Bukit Asam Tbk
Pub Date : 2022-05-31 DOI: 10.36269/jtr.v3i1.984
Agus Santoso, Ivan Tria Randa, Yenni Afrida
On Stacker Reclaimer PT. Bukit Asam Tbk Tarahan port unit has an abnormal condition, where when the Stacker Reclaimer is operating Reclaimer mode or taking coal from the stockpile with a maximum load of 3000 tons per hour, the Bucket Wheel motor has a trip with indications of protection switch off, so for now Stacker Reclaimer can only take coal with a capacity below 3000 tons per hour. The method used by collecting data from the name plate of the motor and the results of measurements directly in the form of load, current, rotation and voltage to the Bucket Wheel motor.Based on the results of research and calculations carried out, it was found that the maximum current value on the bucket wheel motor was 199 Amperes, so it can be interpreted that the performance of the motor did not decrease because it was still in accordance with the standard name plate of the motor manufacturer
Bukit Asam Tbk Tarahan港口机组出现异常情况,当堆取煤机运行取煤模式或从最大负荷为每小时3000吨的库存中取煤时,斗轮电机跳车并显示保护开关关闭,因此目前堆取煤机只能取容量低于每小时3000吨的煤。所采用的方法是从电机的铭牌上收集数据,并将测量结果直接以负载、电流、转速和电压的形式传递给斗轮电机。根据所进行的研究和计算结果,发现斗轮电机上的最大电流值为199安培,因此可以解释为电机的性能没有下降,因为它仍然符合电机制造商的标准铭牌
{"title":"Analisa Performan Motor Bucket Wheel Stacker Reclaimer PT. Bukit Asam Tbk","authors":"Agus Santoso, Ivan Tria Randa, Yenni Afrida","doi":"10.36269/jtr.v3i1.984","DOIUrl":"https://doi.org/10.36269/jtr.v3i1.984","url":null,"abstract":"On Stacker Reclaimer PT. Bukit Asam Tbk Tarahan port unit has an abnormal condition, where when the Stacker Reclaimer is operating Reclaimer mode or taking coal from the stockpile with a maximum load of 3000 tons per hour, the Bucket Wheel motor has a trip with indications of protection switch off, so for now Stacker Reclaimer can only take coal with a capacity below 3000 tons per hour. The method used by collecting data from the name plate of the motor and the results of measurements directly in the form of load, current, rotation and voltage to the Bucket Wheel motor.Based on the results of research and calculations carried out, it was found that the maximum current value on the bucket wheel motor was 199 Amperes, so it can be interpreted that the performance of the motor did not decrease because it was still in accordance with the standard name plate of the motor manufacturer","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"4 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74887825","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analisis Kesiapan Kerja Siswa Sekolah Menengah Kejuruan Jurusan Teknik Instalasi Tenaga Listrik 电力安装工程专业学生职业准备分析
Pub Date : 2022-05-31 DOI: 10.24036/jpte.v3i1.166
Ridho Irawan, H. Hendri
The purpose of this study is to describe and analyze the work readiness of students at SMKN 2 Lubuk Basung Department of Electrical Power Installation Engineering. Work readiness refers to an individual's total physical, mental, and life experience, as well as their willingness and capacity to perform work or an activity. The research method used in this research is descriptive research method with a quantitative approach. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The research instrument used in this study was in the form of a questionnaire which was distributed to respondents directly which had 1 variable and 7 indicators. This research questionnaire was conducted on students in class XII Electrical Power Installation Engineering with a total of 31 respondents and the results obtained were 15 respondents with poor work readiness results. The results of this study can be concluded that the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung is categorized as bad.
本研究的目的是描述和分析SMKN 2鲁巴克巴松电力安装工程系学生的工作准备情况。工作准备是指一个人的身体、精神和生活的总体经验,以及他们进行工作或活动的意愿和能力。本研究采用的研究方法是描述性研究方法与定量研究方法相结合。所研究的变量为陆北basung SMKN 2电力安装工程专业学生的工作准备情况。所研究的变量为陆北basung SMKN 2电力安装工程专业学生的工作准备情况。本研究使用的研究工具是问卷的形式,直接分发给受访者,有1个变量和7个指标。本研究问卷以十二年级电力安装工程专业的学生为调查对象,共有31名被调查者,其中15名被调查者工作准备成绩较差。本研究结果表明,陆北basung SMKN 2电力安装工程专业学生的工作准备程度为差。
{"title":"Analisis Kesiapan Kerja Siswa Sekolah Menengah Kejuruan Jurusan Teknik Instalasi Tenaga Listrik","authors":"Ridho Irawan, H. Hendri","doi":"10.24036/jpte.v3i1.166","DOIUrl":"https://doi.org/10.24036/jpte.v3i1.166","url":null,"abstract":"The purpose of this study is to describe and analyze the work readiness of students at SMKN 2 Lubuk Basung Department of Electrical Power Installation Engineering. Work readiness refers to an individual's total physical, mental, and life experience, as well as their willingness and capacity to perform work or an activity. The research method used in this research is descriptive research method with a quantitative approach. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The variable studied was the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung. The research instrument used in this study was in the form of a questionnaire which was distributed to respondents directly which had 1 variable and 7 indicators. This research questionnaire was conducted on students in class XII Electrical Power Installation Engineering with a total of 31 respondents and the results obtained were 15 respondents with poor work readiness results. The results of this study can be concluded that the work readiness of students majoring in Electrical Power Installation Engineering, SMKN 2 Lubuk Basung is categorized as bad.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"11 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86240083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG 分析变压器过载对珊瑚PT. PLN (PERSERO)彩虹反转的影响
Pub Date : 2022-05-31 DOI: 10.36269/jtr.v4i1.986
Jeckson Jeckson, Azis Prayuda, Yenni Afrida
Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.
PT. PLN (Persero) ULP Karang的其中一台配电变压器发生变压器过载,即彩虹馈线处的K622配电变压器,其负荷超出SPLN规定的80%的标准110.16%。本研究旨在找出如何克服彩虹号上K622配电变电站变压器的过载问题,得到升级变压器前后K622配电变电站变压器负荷的大小。从升级结果来看,变压器升级前和升级后的负荷值分别占比分别为110.16%和26.38%,降低了83.78%。这意味着升级变压器是可以用来克服过载的方法之一。
{"title":"ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG","authors":"Jeckson Jeckson, Azis Prayuda, Yenni Afrida","doi":"10.36269/jtr.v4i1.986","DOIUrl":"https://doi.org/10.36269/jtr.v4i1.986","url":null,"abstract":"Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"8 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75187138","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Pengaruh Penempatan Lightning Arrester Sebelum Dan Sesudah Fuse Cut Out Terhadap Tegangan Lebih Pada Transformator Distribusi 20 Kv Di PT. PLN (Persero) Rayon Tanjung Karang
Pub Date : 2022-05-31 DOI: 10.36269/jtr.v4i1.988
Dasweptia Dasweptia, A. Hamdani, Tommy Kurniawan
Lightning strikes on airborne transmission networks such as in distribution lines are injections of electric charge. The injection of the charge will cause a voltage increase in the network, so that more tension will arise in the network. Lightning Arrester (LA) is one of the equipment in the protection system to protect the 20 kV distribution transformer against overvoltage coming from lightning strikes. Under normal circumstances LA acts as an insulator, but when exposed to lightning strikes LA will function as a conductor whose resistance is relatively low, so that it can flow the surge current to the ground. This study aims to see the effect of the placement of lightning arresters before and after fuse cut out on overvoltage in the 20 KV distribution transformer, so that which placement is better is obtained, taking into account factors that affect the level of voltage and overcurrent that occurs in each system such as the location of LA placement, the steepness of incoming waves, the speed of propagation of surja waves, the voltage is large through the protection system, and the Basic Insulation Level (BIL) value of the equipment. So that in the end, the right PLACEMENT of LA was obtained as a 20 kv distribution transformer protection. Based on the results of the study, the voltage that reached the transformer was 67,192 kV, in this condition the transformer was still in a safe state because the voltage hitting the transformer was smaller than the transformer's BIL, which was 67.192kV<125 kV. the installation of the arrester after Fuse Cut Out is better because the voltage hitting the transformer is smaller than the installation of the arrester before Fuse Cut Out with a voltage difference of 69,092 kV - 67,192 kV = 1.9 kV.
雷击对空中输电网络(如配电线路)的作用是注入电荷。电荷的注入会使网络中的电压升高,从而使网络中产生更大的张力。避雷器是保护20kv配电变压器免受雷击过电压影响的保护装置之一。在正常情况下,LA充当绝缘体,但当受到雷击时,LA将作为导体,其电阻相对较低,因此它可以将浪涌电流输送到地面。本研究的目的是观察熔断器切断前后避雷器的放置对20kv配电变压器过电压的影响,从而得出哪一种放置方式更好,同时考虑到影响各系统电压和过流水平的因素,如避雷器放置的位置、来波的陡峭度、过电波的传播速度、通过保护系统的电压较大等。设备的基本绝缘等级(BIL)值。最终确定了20kv配电变压器保护的正确位置。根据研究结果,到达变压器的电压为67192 kV,在此情况下,由于到达变压器的电压小于变压器的BIL值67.192kV<125 kV,因此变压器仍处于安全状态。熔断后安装避雷器较好,因为碰到变压器的电压比熔断前安装避雷器要小,电压差为69,092 kV - 67192 kV = 1.9 kV。
{"title":"Pengaruh Penempatan Lightning Arrester Sebelum Dan Sesudah Fuse Cut Out Terhadap Tegangan Lebih Pada Transformator Distribusi 20 Kv Di PT. PLN (Persero) Rayon Tanjung Karang","authors":"Dasweptia Dasweptia, A. Hamdani, Tommy Kurniawan","doi":"10.36269/jtr.v4i1.988","DOIUrl":"https://doi.org/10.36269/jtr.v4i1.988","url":null,"abstract":"Lightning strikes on airborne transmission networks such as in distribution lines are injections of electric charge. The injection of the charge will cause a voltage increase in the network, so that more tension will arise in the network. Lightning Arrester (LA) is one of the equipment in the protection system to protect the 20 kV distribution transformer against overvoltage coming from lightning strikes. Under normal circumstances LA acts as an insulator, but when exposed to lightning strikes LA will function as a conductor whose resistance is relatively low, so that it can flow the surge current to the ground. This study aims to see the effect of the placement of lightning arresters before and after fuse cut out on overvoltage in the 20 KV distribution transformer, so that which placement is better is obtained, taking into account factors that affect the level of voltage and overcurrent that occurs in each system such as the location of LA placement, the steepness of incoming waves, the speed of propagation of surja waves, the voltage is large through the protection system, and the Basic Insulation Level (BIL) value of the equipment. So that in the end, the right PLACEMENT of LA was obtained as a 20 kv distribution transformer protection. Based on the results of the study, the voltage that reached the transformer was 67,192 kV, in this condition the transformer was still in a safe state because the voltage hitting the transformer was smaller than the transformer's BIL, which was 67.192kV<125 kV. the installation of the arrester after Fuse Cut Out is better because the voltage hitting the transformer is smaller than the installation of the arrester before Fuse Cut Out with a voltage difference of 69,092 kV - 67,192 kV = 1.9 kV.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"26 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86653356","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Hambatan Mahasiswa Teknik Elektro dalam Mengikuti Proses Pembelajaran Daring 电气工程阻碍在线学习进程
Pub Date : 2022-05-30 DOI: 10.24036/jpte.v3i1.163
Rahmat Fadil, Riki Mukhaiyar
This study aims to determine the description of Electrical Engineering Students' Barriers to Online Learning. This research method uses a quantitative descriptive method, which means that this research method aims to create a description or descriptive of an objective that uses numbers, starting from data collection, interpretation of the data and appearance and results. The research instrument used a questionnaire distributed to students majoring in Electrical Engineering class of 2020 who carried out online learning, totaling sixty-five students. Assessment of research instruments using a Likert scale. The data analysis used is a descriptive statistical approach using the average mean, standard deviation values, and category scores of one to five to determine the extent of the distribution of the data. The results showed that the electrical engineering students' barriers to online learning had different category levels for each indicator, in the high category there were facilities indicators in the medium category, there were three indicators, namely indicators of psychological barriers, indicators of educators or lecturers and family indicators. So it can be concluded that the obstacles experienced by students majoring in Electrical Engineering in online learning come from psychological barriers, lecturers or educators, facilities and families. These factors trigger students to be less motivated to carry out online learning so that online learning is less effective and efficient.
本研究旨在确定电气工程专业学生在线学习障碍的描述。这种研究方法采用了定量描述的方法,这意味着这种研究方法的目的是创建一个描述或描述的目标,使用数字,从数据的收集,数据的解释和外观和结果。本研究采用问卷调查的方式,对2020级电气工程专业在线学习的65名学生进行了问卷调查。使用李克特量表评估研究工具。使用的数据分析是一种描述性统计方法,使用平均值,标准偏差值和1到5的类别分数来确定数据分布的程度。结果表明,电气工程专业学生在线学习障碍各指标的类别水平不同,高类别中有设施指标,中等类别中有心理障碍指标、教育工作者或讲师指标和家庭指标三个指标。因此,电气工程专业学生在网络学习中遇到的障碍主要来自心理障碍、教师或教育者、设施和家庭。这些因素导致学生进行在线学习的积极性降低,从而降低了在线学习的效果和效率。
{"title":"Hambatan Mahasiswa Teknik Elektro dalam Mengikuti Proses Pembelajaran Daring","authors":"Rahmat Fadil, Riki Mukhaiyar","doi":"10.24036/jpte.v3i1.163","DOIUrl":"https://doi.org/10.24036/jpte.v3i1.163","url":null,"abstract":"This study aims to determine the description of Electrical Engineering Students' Barriers to Online Learning. This research method uses a quantitative descriptive method, which means that this research method aims to create a description or descriptive of an objective that uses numbers, starting from data collection, interpretation of the data and appearance and results. The research instrument used a questionnaire distributed to students majoring in Electrical Engineering class of 2020 who carried out online learning, totaling sixty-five students. Assessment of research instruments using a Likert scale. The data analysis used is a descriptive statistical approach using the average mean, standard deviation values, and category scores of one to five to determine the extent of the distribution of the data. The results showed that the electrical engineering students' barriers to online learning had different category levels for each indicator, in the high category there were facilities indicators in the medium category, there were three indicators, namely indicators of psychological barriers, indicators of educators or lecturers and family indicators. So it can be concluded that the obstacles experienced by students majoring in Electrical Engineering in online learning come from psychological barriers, lecturers or educators, facilities and families. These factors trigger students to be less motivated to carry out online learning so that online learning is less effective and efficient.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"14 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89140384","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Pengembangan Jobsheet Robotika Line Follower Robot berbasis Mikrokontroler Arduino UNO 基于Arduino UNO的机器人处理器的Jobsheet机器人追随者的发展
Pub Date : 2022-05-27 DOI: 10.24036/jpte.v3i1.161
Fikry Fauzi, I. Irwanto, Endi Permata
Abstract— This research is based on the fact that in the Department of Industrial Electronics Engineering at SMKN 4 Serang City there is no learning media on robotic system controller subjects. On that basis, a line follower robot learning media was designed which is expected to overcome this problem. The learning media designed is in the form of a learning worksheet that contains 6 (six) jobs including how to assemble components, forward motion commands, backward motion, left turn motion, right turn motion and combination motion. The development of this jobsheet learning media uses a 4D research model which consists of 4 research steps, namely define, design, develop and disseminate. The purpose of this study was to create media and a line follower robot learning worksheet, then also to determine the feasibility level of the media. Based on the feasibility test conducted on media experts, material experts and user tests covering several aspects such as the feasibility of content, appearance and language, it was found that the line follower robot learning jobsheet was "very feasible" to be used as a learning medium in robotic system controller subjects.
摘要:这项研究是基于这样一个事实,即在SMKN 4 Serang市的工业电子工程系,没有关于机器人系统控制器科目的学习媒体。在此基础上,设计了一种线跟随机器人学习媒体,有望克服这一问题。设计的学习媒体以学习工作表的形式,包含6个作业,包括如何组装部件、前进动作指令、后退动作、左转动作、右转动作和组合动作。本作业单学习媒体的开发采用了四维研究模型,包括定义、设计、开发和传播四个研究步骤。本研究的目的是创建媒体和线跟随机器人学习工作表,然后确定媒体的可行性水平。通过对媒体专家、材料专家和用户进行可行性测试,涵盖内容可行性、外观可行性、语言可行性等几个方面,发现线从动机器人学习作业单作为机器人系统控制器科目的学习媒介是“非常可行的”。
{"title":"Pengembangan Jobsheet Robotika Line Follower Robot berbasis Mikrokontroler Arduino UNO","authors":"Fikry Fauzi, I. Irwanto, Endi Permata","doi":"10.24036/jpte.v3i1.161","DOIUrl":"https://doi.org/10.24036/jpte.v3i1.161","url":null,"abstract":"Abstract— This research is based on the fact that in the Department of Industrial Electronics Engineering at SMKN 4 Serang City there is no learning media on robotic system controller subjects. On that basis, a line follower robot learning media was designed which is expected to overcome this problem. The learning media designed is in the form of a learning worksheet that contains 6 (six) jobs including how to assemble components, forward motion commands, backward motion, left turn motion, right turn motion and combination motion. The development of this jobsheet learning media uses a 4D research model which consists of 4 research steps, namely define, design, develop and disseminate. The purpose of this study was to create media and a line follower robot learning worksheet, then also to determine the feasibility level of the media. Based on the feasibility test conducted on media experts, material experts and user tests covering several aspects such as the feasibility of content, appearance and language, it was found that the line follower robot learning jobsheet was \"very feasible\" to be used as a learning medium in robotic system controller subjects.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"222 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75638133","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Inovasi Media Pembelajaran Berbasis Problem Based Learning pada Bidang Elektronika Analog Digital 基于问题的学习媒体创新建立在模拟数字电子领域的学习之上
Pub Date : 2022-05-25 DOI: 10.24036/jpte.v3i1.162
Agry Berlianda Putri, Riki Mukhaiyar
This study aims to produce innovations in the form of interactive, valid and practical learning media, and can support the Problem Based Learning (PBL) method in Analog and Digital Electronics courses. The research method used is the Pre-Experimental method with One Shot Case Study design. The subject of this research is Analog and Digital Electronics course. This learning media innovation was applied to several students of the Electrical Engineering Department, Faculty of Engineering, Universitas Negeri Padang, in 2021 who were taking Analog and Digital Electronics courses. Before being shown to respondents, the learning media is tested for validity/feasibility by media expert lecturers. In view of the feasibility test that has been done, this learning media gets a value of ninety three percent, both with regards to appearance and content of the material. Thus, the media can be declared valid/valid so that the research can be continued in obtaining the value of the practicality of the media from the respondents who have been given treatment. The practicality test which was filled out by eight students, obtained an average data of ninety two percent in the very practical category. Data on the feasibility and practicality of the media were obtained using a validated questionnaire of zero point ninety eight by instrument expert lecturers. So, it tends to be inferred that the learning media in the Analog and Digital Electronics course is valid and practical to use in the Analog and Digital Electronics learning process.
本研究旨在创新互动式、有效且实用的学习媒体,以支持模拟与数位电子学课程中基于问题的学习方法。研究方法采用预实验法和一次性案例研究设计。本研究的对象是模拟与数字电子学课程。这种学习媒体的创新应用于2021年巴东大学工程学院电气工程系的几名学生,他们正在学习模拟和数字电子学课程。在展示给被调查者之前,学习媒体要经过媒体专家讲师的有效性/可行性测试。经过可行性测试,该学习媒体无论在外观还是内容上都获得了93%的评价。因此,媒体可以被宣布为有效/有效,从而可以继续研究,从接受治疗的受访者中获得媒体的实用性价值。实用性测试由8名学生填写,在非常实用的类别中获得了平均92%的数据。仪器专家讲师使用一份有效的问卷(0分98)获得了该介质的可行性和实用性数据。因此,我们可以推断,模拟与数字电子学课程中的学习媒体在模拟与数字电子学的学习过程中是有效和实用的。
{"title":"Inovasi Media Pembelajaran Berbasis Problem Based Learning pada Bidang Elektronika Analog Digital","authors":"Agry Berlianda Putri, Riki Mukhaiyar","doi":"10.24036/jpte.v3i1.162","DOIUrl":"https://doi.org/10.24036/jpte.v3i1.162","url":null,"abstract":"This study aims to produce innovations in the form of interactive, valid and practical learning media, and can support the Problem Based Learning (PBL) method in Analog and Digital Electronics courses. The research method used is the Pre-Experimental method with One Shot Case Study design. The subject of this research is Analog and Digital Electronics course. This learning media innovation was applied to several students of the Electrical Engineering Department, Faculty of Engineering, Universitas Negeri Padang, in 2021 who were taking Analog and Digital Electronics courses. Before being shown to respondents, the learning media is tested for validity/feasibility by media expert lecturers. In view of the feasibility test that has been done, this learning media gets a value of ninety three percent, both with regards to appearance and content of the material. Thus, the media can be declared valid/valid so that the research can be continued in obtaining the value of the practicality of the media from the respondents who have been given treatment. The practicality test which was filled out by eight students, obtained an average data of ninety two percent in the very practical category. Data on the feasibility and practicality of the media were obtained using a validated questionnaire of zero point ninety eight by instrument expert lecturers. So, it tends to be inferred that the learning media in the Analog and Digital Electronics course is valid and practical to use in the Analog and Digital Electronics learning process.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"21 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2022-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75698909","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
期刊
Volt Jurnal Ilmiah Pendidikan Teknik Elektro
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1