Importance of representative metallurgical sampling and testwork programmes to reduce project risk – a gold case study 具有代表性的冶金取样和测试工作方案对降低项目风险的重要性——一个黄金案例研究
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-06-19 DOI: 10.1080/25726668.2019.1628462
S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel
ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.
在制定工艺流程表时,通过确保具有代表性的冶金样品和质量测试工作,将实现积极财务结果的风险降至最低。以某地下金矿开采为例,介绍了冶金取样不良导致品位和回收率不佳的情况。与抽样有关的问题包括:地质学家和冶金学家之间联络不良;可怜的领域;收集和测试的冶金样品太少;非代表性样品复合材料和子样品;实验室操作规范差;缺乏文件和质量保证。这些问题导致了四年的中断,估计造成了约1.15亿美元的收入损失和750万美元的纠正支出。在初始表征程序之后,进行了可变性小批量采样和测试工作阶段。随后是一个试点方案,逐步进行采矿和生产试验。本文强调了适合冶金目的的取样和试验工作的必要性,以及变异性取样的早期应用。
{"title":"Importance of representative metallurgical sampling and testwork programmes to reduce project risk – a gold case study","authors":"S. Dominy, Louisa O’Connor, Saranchimeg Purevgerel","doi":"10.1080/25726668.2019.1628462","DOIUrl":"https://doi.org/10.1080/25726668.2019.1628462","url":null,"abstract":"ABSTRACT When developing a process flowsheet, the risks in achieving positive financial outcomes are minimised by ensuring representative metallurgical samples and quality testwork. A case study is presented based on an underground gold operation, where poor metallurgical sampling led to grade and recovery underperformance. Sampling-related issues included: poor liaison between geologists and metallurgists; poor domaining; too few metallurgical samples collected and tested; unrepresentative sample composites and sub-samples; poor laboratory practice; and a lack of documentation and QAQC. These issues led to disruption over four years and are estimated to have cost around US$115M in lost revenue and US$7.5M in corrective expenditure. After an initial characterisation programme, a variability mini-bulk sampling and testwork phase was undertaken. This was followed by a pilot programme, progressing to trial mining and production. The paper emphasises the need for fit for purpose metallurgical sampling and testwork, and the early application of variability sampling.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"20 1","pages":"230 - 245"},"PeriodicalIF":1.1,"publicationDate":"2019-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83670199","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Stress corrosion testing of roof bolt grade 60 steel in simulated underground coal mine atmosphere 60级钢锚杆在模拟煤矿井下环境中的应力腐蚀试验
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-05-21 DOI: 10.1080/25726668.2019.1616951
G. Bylapudi, A. Spearing, K. Mondal, A. Bhagwat
ABSTRACT Corrosion of roof bolts in underground mine environments could have an adverse impact on ground control, which is directly related to workforce safety. Past studies state that stress corrosion cracking (SCC) of roof bolts is a significant problem in underground coal mines, resulting in premature bolt failures. However, it has not been seriously studied in U.S. underground coal mines. As a preliminary study, the most common roof bolt material used in U.S. mines, ASTM A 615 Grade 60 steel, was studied under stress corrosion conditions. ASTM G30 standard was applied to achieve this and tested in the simulated coal mine conditions. SCC was observed on samples that were tested for 180 days. Chloride SCC (ClSCC) was found to be the corrosion mechanism resulting in cracks from the EDS data. This paper mainly discusses the test protocol, shortcomings of this preliminary testing and makes recommendations based on the observations and results.
矿井井下环境中顶板锚杆的腐蚀会对地面控制产生不利影响,直接关系到作业人员的安全。以往的研究表明,顶板锚杆的应力腐蚀开裂(SCC)是煤矿井下存在的一个重要问题,会导致锚杆过早失效。然而,美国的地下煤矿并没有对其进行认真的研究。作为初步研究,在应力腐蚀条件下研究了美国矿山中最常用的锚杆材料ASTM a 615 60级钢。为此采用ASTM G30标准,并在模拟煤矿条件下进行了试验。在测试180天的样品中观察到SCC。从EDS数据中发现氯化物SCC (ClSCC)是导致裂纹产生的腐蚀机制。本文主要讨论了试验方案、初步试验的不足,并根据观察结果提出了建议。
{"title":"Stress corrosion testing of roof bolt grade 60 steel in simulated underground coal mine atmosphere","authors":"G. Bylapudi, A. Spearing, K. Mondal, A. Bhagwat","doi":"10.1080/25726668.2019.1616951","DOIUrl":"https://doi.org/10.1080/25726668.2019.1616951","url":null,"abstract":"ABSTRACT Corrosion of roof bolts in underground mine environments could have an adverse impact on ground control, which is directly related to workforce safety. Past studies state that stress corrosion cracking (SCC) of roof bolts is a significant problem in underground coal mines, resulting in premature bolt failures. However, it has not been seriously studied in U.S. underground coal mines. As a preliminary study, the most common roof bolt material used in U.S. mines, ASTM A 615 Grade 60 steel, was studied under stress corrosion conditions. ASTM G30 standard was applied to achieve this and tested in the simulated coal mine conditions. SCC was observed on samples that were tested for 180 days. Chloride SCC (ClSCC) was found to be the corrosion mechanism resulting in cracks from the EDS data. This paper mainly discusses the test protocol, shortcomings of this preliminary testing and makes recommendations based on the observations and results.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"1 1","pages":"206 - 215"},"PeriodicalIF":1.1,"publicationDate":"2019-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82425489","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Ultrasonic inspection of flooded mineshafts for stability monitoring 水淹矿井稳定性监测的超声探伤
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-04-24 DOI: 10.1080/25726668.2019.1607459
M. D. Bedford, D. Gibson, J. Coggan, K. Siever, Aleksander Wrana, Dagmara Sobczak, Olaya Álvarez, C. Satterley
ABSTRACT Inspecting abandoned mine shafts is critical in ensuring their safety through early identification of signs of deterioration. Since the common inspection methods of CCTV and LiDAR are not very effective underwater, two modules have been designed for inspecting the linings of flooded, abandoned mine shafts. Using sonar technology, they allow the early stages of degradation to the lining to be detected which – since this could be indicative of imminent collapse – provides protection against the consequential risk to property and human life. Detailed measurements of several shafts’ cross-sections have been recorded using profiling and imaging sonar technology. Although imaging sonar provides very different results in the confined and reverberant environment of a mine shaft, compared to its more common environment of a seabed, it was shown that when combined with the profiling sonar, it allows shafts to be surveyed in a shorter period of time and improves the reliability of the profiling function.
对废弃矿井进行检查是确保其安全的关键,可以及早发现矿井恶化的迹象。由于CCTV和LiDAR的常用检测方法在水下不是很有效,因此设计了两个模块来检测被水淹没的废弃矿井的衬里。利用声纳技术,它们可以检测到衬里退化的早期阶段,因为这可能预示着即将崩溃,因此可以保护财产和人类生命免受随之而来的风险。利用剖面和成像声纳技术,对几个竖井的横截面进行了详细测量。虽然成像声纳在矿井的密闭和混响环境中提供的结果与在海底更常见的环境截然不同,但研究表明,与剖面声纳结合使用,可以在更短的时间内对矿井进行测量,并提高剖面功能的可靠性。
{"title":"Ultrasonic inspection of flooded mineshafts for stability monitoring","authors":"M. D. Bedford, D. Gibson, J. Coggan, K. Siever, Aleksander Wrana, Dagmara Sobczak, Olaya Álvarez, C. Satterley","doi":"10.1080/25726668.2019.1607459","DOIUrl":"https://doi.org/10.1080/25726668.2019.1607459","url":null,"abstract":"ABSTRACT Inspecting abandoned mine shafts is critical in ensuring their safety through early identification of signs of deterioration. Since the common inspection methods of CCTV and LiDAR are not very effective underwater, two modules have been designed for inspecting the linings of flooded, abandoned mine shafts. Using sonar technology, they allow the early stages of degradation to the lining to be detected which – since this could be indicative of imminent collapse – provides protection against the consequential risk to property and human life. Detailed measurements of several shafts’ cross-sections have been recorded using profiling and imaging sonar technology. Although imaging sonar provides very different results in the confined and reverberant environment of a mine shaft, compared to its more common environment of a seabed, it was shown that when combined with the profiling sonar, it allows shafts to be surveyed in a shorter period of time and improves the reliability of the profiling function.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"37 1","pages":"177 - 185"},"PeriodicalIF":1.1,"publicationDate":"2019-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73566397","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated optimisation of stope boundary and access layout for underground mining operations 地下开采采场边界与通道布置的综合优化
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-04-22 DOI: 10.1080/25726668.2019.1603920
Jie Hou, Chaoshui Xu, P. Dowd, Guoqing Li
ABSTRACT For underground mines, two major designs that need to be optimised are the stope boundary and the access layout. The optimisation of these two components cannot be done independently as ore extracted from stopes is transported to the surface via the access network. Different stope locations result in different associated access development costs. This paper describes a proposed integrated optimisation model to optimise stope and access layouts simultaneously. The interactions and interdependency between stopes and access are ensured by a dynamic access development cost analysis based on recursive computations. Mixed integer non-linear programming is used to maximise the overall economic value subject to the constraints of generating optimal stopes and access layout, which is solved by a Genetic Algorithm modified for computational efficiency. A stratiform gold deposit is used as a case study to demonstrate that the new approach can provide a more profitable solution compared with traditional approaches.
对于地下矿山来说,需要优化的两大设计是采场边界和巷道布置。这两个部分的优化不能独立完成,因为从采场提取的矿石是通过接入网络运输到地面的。不同的采场位置导致不同的相关通道开发成本。本文提出了一种采场与回采通道同时优化的综合优化模型。通过基于递归计算的动态巷道开发成本分析,保证了采场与巷道之间的相互作用和相互依存关系。采用混合整数非线性规划,在生成最优采场和巷道布置的约束下,使整体经济价值最大化,并采用改进的遗传算法求解。以某层状金矿为例,证明了新方法比传统方法更具效益。
{"title":"Integrated optimisation of stope boundary and access layout for underground mining operations","authors":"Jie Hou, Chaoshui Xu, P. Dowd, Guoqing Li","doi":"10.1080/25726668.2019.1603920","DOIUrl":"https://doi.org/10.1080/25726668.2019.1603920","url":null,"abstract":"ABSTRACT For underground mines, two major designs that need to be optimised are the stope boundary and the access layout. The optimisation of these two components cannot be done independently as ore extracted from stopes is transported to the surface via the access network. Different stope locations result in different associated access development costs. This paper describes a proposed integrated optimisation model to optimise stope and access layouts simultaneously. The interactions and interdependency between stopes and access are ensured by a dynamic access development cost analysis based on recursive computations. Mixed integer non-linear programming is used to maximise the overall economic value subject to the constraints of generating optimal stopes and access layout, which is solved by a Genetic Algorithm modified for computational efficiency. A stratiform gold deposit is used as a case study to demonstrate that the new approach can provide a more profitable solution compared with traditional approaches.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"20 4 1","pages":"193 - 205"},"PeriodicalIF":1.1,"publicationDate":"2019-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82905935","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Understanding, managing and communicating geomechanical mining risk 了解、管理和沟通地质力学采矿风险
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-04-09 DOI: 10.36487/ACG_REP/1905_0.1_HADJIGEORGIOU
J. Hadjigeorgiou
ABSTRACT Understanding, managing and communicating geomechanical mining risk is critical in supporting decisions at all levels of a mining company. This paper addresses how different risk analysis tools and procedures can be used effectively and brings attention to the limitations of some of the most popular tools. A strong case is made for a critical assessment of the effectiveness of risk-management tools. Finally, the paper discusses the challenges of understanding and communicating geomechanical mining risk, given the asymmetry of knowledge and information by decision-makers in mining companies.
了解、管理和沟通地质力学采矿风险对于支持矿业公司各级决策至关重要。本文讨论了如何有效地使用不同的风险分析工具和程序,并关注了一些最流行的工具的局限性。对风险管理工具的有效性进行批判性评估是一个强有力的理由。最后,本文讨论了在矿业公司决策者知识和信息不对称的情况下,理解和传达地质力学采矿风险所面临的挑战。
{"title":"Understanding, managing and communicating geomechanical mining risk","authors":"J. Hadjigeorgiou","doi":"10.36487/ACG_REP/1905_0.1_HADJIGEORGIOU","DOIUrl":"https://doi.org/10.36487/ACG_REP/1905_0.1_HADJIGEORGIOU","url":null,"abstract":"ABSTRACT Understanding, managing and communicating geomechanical mining risk is critical in supporting decisions at all levels of a mining company. This paper addresses how different risk analysis tools and procedures can be used effectively and brings attention to the limitations of some of the most popular tools. A strong case is made for a critical assessment of the effectiveness of risk-management tools. Finally, the paper discusses the challenges of understanding and communicating geomechanical mining risk, given the asymmetry of knowledge and information by decision-makers in mining companies.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"6 1","pages":"159 - 173"},"PeriodicalIF":1.1,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76941626","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Clustering mining blocks in presence of geological uncertainty 地质不确定性下的矿区聚类
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-03-27 DOI: 10.1080/25726668.2019.1596425
M. Tabesh, H. Askari-Nasab
ABSTRACT A major trend in mine production planning research is incorporating geological uncertainty in the processes of planning. Many mathematical models and heuristic approaches are proposed to deal with the uncertainty. Although there have been advances in exact methods to solve simpler instances of the mine production scheduling problem more complex instances of the model, especially when incorporating uncertainty, remain intractable and aggregation of blocks can help to decrease solution times. In this paper, we present four variations of the agglomerative hierarchical clustering algorithm, one based on deterministic estimates of properties and three based on possible worlds approach which use Geostatistical realizations to form aggregates with regard to the geological properties and the existing uncertainties. We show, through case studies, that uncertainty-based algorithms can result in aggregates that are less susceptible to uncertainties, and at the same time, the proposed algorithm can produce aggregates that are within a controlled size and have minable shapes.
摘要矿山生产规划研究的一个主要趋势是将地质不确定性纳入规划过程。提出了许多数学模型和启发式方法来处理不确定性。尽管在解决矿山生产调度问题的简单实例的精确方法方面取得了进展,但更复杂的模型实例,特别是在包含不确定性的情况下,仍然难以解决,而块的聚集有助于减少求解时间。本文提出了聚类分层聚类算法的四种变体,一种基于属性的确定性估计,三种基于可能世界方法,利用地质统计学实现对地质属性和存在的不确定性形成聚类。我们通过案例研究表明,基于不确定性的算法可以产生不易受不确定性影响的聚合体,同时,所提出的算法可以产生大小可控且具有可挖掘形状的聚合体。
{"title":"Clustering mining blocks in presence of geological uncertainty","authors":"M. Tabesh, H. Askari-Nasab","doi":"10.1080/25726668.2019.1596425","DOIUrl":"https://doi.org/10.1080/25726668.2019.1596425","url":null,"abstract":"ABSTRACT A major trend in mine production planning research is incorporating geological uncertainty in the processes of planning. Many mathematical models and heuristic approaches are proposed to deal with the uncertainty. Although there have been advances in exact methods to solve simpler instances of the mine production scheduling problem more complex instances of the model, especially when incorporating uncertainty, remain intractable and aggregation of blocks can help to decrease solution times. In this paper, we present four variations of the agglomerative hierarchical clustering algorithm, one based on deterministic estimates of properties and three based on possible worlds approach which use Geostatistical realizations to form aggregates with regard to the geological properties and the existing uncertainties. We show, through case studies, that uncertainty-based algorithms can result in aggregates that are less susceptible to uncertainties, and at the same time, the proposed algorithm can produce aggregates that are within a controlled size and have minable shapes.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"8 1","pages":"162 - 176"},"PeriodicalIF":1.1,"publicationDate":"2019-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82689568","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 11
Development of a model for economic control of loading in sublevel caving mines 分段崩落开采荷载经济控制模型的建立
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-03-11 DOI: 10.1080/25726668.2019.1586371
Gurmeet Shekhar, A. Gustafson, Anders Hersinger, K. Jonsson, H. Schunnesson
ABSTRACT This paper presents an economic model for optimizing loading at the draw point in sublevel caving (SLC) operations. The input data consist of estimated bucket grades based on bucket weights from Load Haul Dump machines. This information, together with average operational mining costs, was used to create an economic model providing a real-time economic assessment of the draw point performance for SLC rings. The results demonstrate the importance of continuous draw point monitoring to optimize SLC operations. The proposed model provides an economic assessment of operating draw points and will help mine personnel to decide when to stop loading from a blasted ring. It can also help mine management understand the complexity of material flow in SLC operations. Finally, it provides operational flexibility for the mine to optimize loading at the draw point by increasing ore recovery while maintaining operational control of draw point performance.
摘要本文建立了分段崩落开采抽采点荷载优化的经济模型。输入数据包括根据装载自卸机器的桶重量估计的桶等级。该信息与平均作业采矿成本一起用于创建经济模型,为SLC环的抽采点性能提供实时经济评估。结果表明,连续抽油点监测对优化SLC作业具有重要意义。所提出的模型提供了作业抽采点的经济评估,并将帮助矿山人员决定何时停止从爆破环中加载。它还可以帮助矿山管理人员了解SLC作业中物料流的复杂性。最后,在保持对抽采点性能的操作控制的同时,提高矿石回收率,为矿山优化抽采点加载提供了操作灵活性。
{"title":"Development of a model for economic control of loading in sublevel caving mines","authors":"Gurmeet Shekhar, A. Gustafson, Anders Hersinger, K. Jonsson, H. Schunnesson","doi":"10.1080/25726668.2019.1586371","DOIUrl":"https://doi.org/10.1080/25726668.2019.1586371","url":null,"abstract":"ABSTRACT This paper presents an economic model for optimizing loading at the draw point in sublevel caving (SLC) operations. The input data consist of estimated bucket grades based on bucket weights from Load Haul Dump machines. This information, together with average operational mining costs, was used to create an economic model providing a real-time economic assessment of the draw point performance for SLC rings. The results demonstrate the importance of continuous draw point monitoring to optimize SLC operations. The proposed model provides an economic assessment of operating draw points and will help mine personnel to decide when to stop loading from a blasted ring. It can also help mine management understand the complexity of material flow in SLC operations. Finally, it provides operational flexibility for the mine to optimize loading at the draw point by increasing ore recovery while maintaining operational control of draw point performance.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"39 1","pages":"118 - 128"},"PeriodicalIF":1.1,"publicationDate":"2019-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76211232","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Approximate blast movement modelling for improved grade control 改进坡度控制的近似爆破运动模型
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-03-01 DOI: 10.1080/25726668.2019.1583843
Y. V. Vasylchuk, C. Deutsch
ABSTRACT An optimization algorithm has been developed to model blast-induced displacement of rock in 3-D using gridded pre- and post-blast topography and direct blast movement measurements. The blast movement problem is expressed as an optimization assignment problem. The optimization assignment problem is solved by a heuristic algorithm offering an approximate solution in a reasonable time. The objective function and optimization details are explained. An example demonstrates the steps required to model blast movement. A realistic blast movement model improves grade control by allowing better positioning of dig lines and more correct determination of the correct destination for mined rock. The algorithm is suitable for mapping pre-blast grades, categories, expected profit, or other information onto the post-blast configuration of the muckpile.
利用网格化的爆破前后地形和直接的爆破运动测量数据,开发了一种优化算法来模拟岩石的爆破诱发位移。将爆破运动问题表示为优化分配问题。采用启发式算法求解优化分配问题,在合理的时间内给出近似解。说明了目标函数和优化细节。示例演示了模拟爆炸运动所需的步骤。逼真的爆破运动模型通过更好地定位挖掘线和更准确地确定开采岩石的正确目的地,改善了品位控制。该算法适用于将爆破前的等级、类别、预期利润或其他信息映射到爆破后的堆体结构上。
{"title":"Approximate blast movement modelling for improved grade control","authors":"Y. V. Vasylchuk, C. Deutsch","doi":"10.1080/25726668.2019.1583843","DOIUrl":"https://doi.org/10.1080/25726668.2019.1583843","url":null,"abstract":"ABSTRACT An optimization algorithm has been developed to model blast-induced displacement of rock in 3-D using gridded pre- and post-blast topography and direct blast movement measurements. The blast movement problem is expressed as an optimization assignment problem. The optimization assignment problem is solved by a heuristic algorithm offering an approximate solution in a reasonable time. The objective function and optimization details are explained. An example demonstrates the steps required to model blast movement. A realistic blast movement model improves grade control by allowing better positioning of dig lines and more correct determination of the correct destination for mined rock. The algorithm is suitable for mapping pre-blast grades, categories, expected profit, or other information onto the post-blast configuration of the muckpile.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"15 1","pages":"152 - 161"},"PeriodicalIF":1.1,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80253774","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Interpreting roof extensometry in coal mine roofs 煤矿顶板顶板延伸测量解释
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-03-01 DOI: 10.1080/25726668.2019.1583458
R. Seedsman
ABSTRACT When the displacement at the roof line is greater than about 40 mm, extensometry in the immediate roof of coal mine roadways reveals similar displacement patterns. The deformation within the roof can be characterised by a linear bulking factor in the order of 1–3%. It is suggested that this bulking can be interpreted to be the result of the volume increase after brittle failure. Bulking factors increase with the height of brittle failure and this may be related to the greater horizontal closure to which the failed material is exposed. Displacement triggers used to manage the stability of the roadways can be related to the onset of brittle failure. Modelling of the straining of a jointed bedded rock mass suggests the development of localised shear and dilational deformations of up to 90 mm which could cause the failure of fully grouted cables.
当顶板线位移大于约40 mm时,煤矿巷道直接顶板的延伸测量显示出类似的位移模式。顶板内部的变形可以用1-3%的线性膨胀系数来表征。认为这种膨胀可以解释为脆性破坏后体积增大的结果。膨胀系数随着脆性破坏高度的增加而增加,这可能与破坏材料暴露的更大的水平闭合有关。用于管理巷道稳定性的位移触发器可能与脆性破坏的发生有关。节理层状岩体的应变模型表明,局部剪切和膨胀变形的发展可达90毫米,这可能导致全注浆电缆的破坏。
{"title":"Interpreting roof extensometry in coal mine roofs","authors":"R. Seedsman","doi":"10.1080/25726668.2019.1583458","DOIUrl":"https://doi.org/10.1080/25726668.2019.1583458","url":null,"abstract":"ABSTRACT When the displacement at the roof line is greater than about 40 mm, extensometry in the immediate roof of coal mine roadways reveals similar displacement patterns. The deformation within the roof can be characterised by a linear bulking factor in the order of 1–3%. It is suggested that this bulking can be interpreted to be the result of the volume increase after brittle failure. Bulking factors increase with the height of brittle failure and this may be related to the greater horizontal closure to which the failed material is exposed. Displacement triggers used to manage the stability of the roadways can be related to the onset of brittle failure. Modelling of the straining of a jointed bedded rock mass suggests the development of localised shear and dilational deformations of up to 90 mm which could cause the failure of fully grouted cables.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"14 1","pages":"143 - 151"},"PeriodicalIF":1.1,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85923749","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Energy consumption in mine haulage due to road pavement performance 道路路面性能对矿山运输能耗的影响
IF 1.1 Q3 MINING & MINERAL PROCESSING Pub Date : 2019-02-11 DOI: 10.1080/25726668.2019.1577062
Jarrad Coffey, H. Nikraz, C. Leek
ABSTRACT Mine haul road pavements are often designed with informal methods. This approach means the energy consumption in haulage is not quantified and so pavement operating costs are not able to be defined. The energy consumption of haul trucks operating on unbound and cementitiously modified haul road pavement basecourse and wearing courses were estimated with variable traffic, climate and maintenance inputs. Energy consumption estimates showed that significant benefits may arise through the use of superior gravels that contain a suitable fines content with low to medium plasticity in the pavement wearing course. Similarly, it was shown that the pavement structural class significantly impacts haul truck energy consumption. Structural class is determined by pavement design and may be improved by increasing the pavement depth or utilizing stiffer materials. Estimating the energy consumption of haul trucks as part of the pavement design process would allow optimization of capital and operating costs over the life of a haul road.
矿山运输道路的路面设计往往采用非正式的方法。这种方法意味着运输过程中的能源消耗不能量化,因此无法确定路面运营成本。在不同的交通、气候和养护投入条件下,对在未粘结和胶结改造的运输道路基层和磨损路面上运行的运输卡车的能量消耗进行了估计。能源消耗估算表明,在路面磨损过程中,通过使用含有适当细粒含量、低至中等塑性的优质砾石,可能会产生显著的效益。同样,路面结构等级对卡车能耗影响显著。结构等级由路面设计决定,可以通过增加路面深度或使用更硬的材料来改善。作为路面设计过程的一部分,估计运输卡车的能源消耗将使运输道路在整个生命周期内的资本和运营成本得到优化。
{"title":"Energy consumption in mine haulage due to road pavement performance","authors":"Jarrad Coffey, H. Nikraz, C. Leek","doi":"10.1080/25726668.2019.1577062","DOIUrl":"https://doi.org/10.1080/25726668.2019.1577062","url":null,"abstract":"ABSTRACT Mine haul road pavements are often designed with informal methods. This approach means the energy consumption in haulage is not quantified and so pavement operating costs are not able to be defined. The energy consumption of haul trucks operating on unbound and cementitiously modified haul road pavement basecourse and wearing courses were estimated with variable traffic, climate and maintenance inputs. Energy consumption estimates showed that significant benefits may arise through the use of superior gravels that contain a suitable fines content with low to medium plasticity in the pavement wearing course. Similarly, it was shown that the pavement structural class significantly impacts haul truck energy consumption. Structural class is determined by pavement design and may be improved by increasing the pavement depth or utilizing stiffer materials. Estimating the energy consumption of haul trucks as part of the pavement design process would allow optimization of capital and operating costs over the life of a haul road.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"139 1","pages":"106 - 117"},"PeriodicalIF":1.1,"publicationDate":"2019-02-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78520210","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
期刊
Mining Technology-Transactions of the Institutions of Mining and Metallurgy
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1